Kasus / BIM dan perhitungan volume
BIM dan perhitungan volume

Merekonsiliasi penerbitan gambar terhadap indeks

Bandingkan satu set sheet yang diterbitkan terhadap indeks gambar dan lihat apa yang hilang, apa yang muncul tanpa pemberitahuan, dan apa yang berada pada revisi yang tidak diharapkan indeks, lalu kejar celahnya dengan angka di tangan.

4 langkah8 mntKontraktor umumKonsultansi BIM / digitalBiro manajemen proyek / konstruksi

Cara kerjanya, langkah demi langkah

4 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Take in the issued sheet set

Dokumen

Load the issued set into the project files and split it into individual sheets, so each drawing lands as its own record with a number and a revision picked up from the title block rather than sitting inside a two hundred page file.

Tangkapan layar, langkah 1: Take in the issued sheet set (Dokumen, Merekonsiliasi penerbitan gambar terhadap indeks)
Dokumen: Take in the issued sheet set

Mengapa: You cannot reconcile a bundle. Until the issue is broken into numbered sheets the only way to answer whether A-114 arrived is for somebody to scroll, and nobody scrolls the same set twice, which is how a missing sheet survives three weeks of everybody assuming it is in there.

MasukanIssued PDF setCovering transmittalHasilIndividual numbered sheetsRevision read off each one
2

Reconcile it against the index

Ruang Rencana

Point the completeness check at the index, either the index PDF the designer issued or a sheet list pasted straight in, and run it. It reports what the index expects and you do not hold, what you hold and the index never mentioned, and what matched but at a different revision.

Tangkapan layar, langkah 2: Reconcile it against the index (Ruang Rencana, Merekonsiliasi penerbitan gambar terhadap indeks)
Ruang Rencana: Reconcile it against the index

Mengapa: Sheet numbers get written a dozen ways across a project, A-101, A 101, a.101, so ticking two lists off by eye reliably misses the ones that differ only by a hyphen. The check collapses those differences before it compares, which is why it finds gaps a careful person reading the same two lists will not.

MasukanSheets you actually holdDrawing index or issue registerHasilMissing and extra listsRevision mismatches
3

Chase what never arrived

Transmital

Check the missing list against the transmittal record first, to be sure the sheets were genuinely never issued rather than mislaid on your side, then go back to the issuer with the exact numbers and the revision each one should be at.

Tangkapan layar, langkah 3: Chase what never arrived (Transmital, Merekonsiliasi penerbitan gambar terhadap indeks)
Transmital: Chase what never arrived

Mengapa: A designer answers we sent everything in one line, and answers a list of eleven sheet numbers in a day. Naming the gap precisely, against the transmittal that was meant to carry it, turns a fortnight of email into a short conversation, and leaves a dated trail if the missing sheet later costs somebody a week.

MasukanMissing sheet numbersTransmittal logHasilRequest naming each sheetDated chase trail
4

Account for what arrived unannounced

Dokumen

Work the other two lists. Register the sheets that came in outside the index so they stop being invisible, and for every revision mismatch settle which side is behind, the index or the set, before anyone builds from either.

Tangkapan layar, langkah 4: Account for what arrived unannounced (Dokumen, Merekonsiliasi penerbitan gambar terhadap indeks)
Dokumen: Account for what arrived unannounced

Mengapa: An extra sheet is usually one somebody issued without updating the index, which makes it the drawing nobody is tracking. A revision mismatch is worse, because both parties are certain they hold the current sheet and one of them is pricing or pouring to geometry that has already moved.

MasukanExtra sheets and mismatchesDrawing registerHasilEverything registeredAgreed current revision
Modul

Modul dalam playbook ini

3 / 190 modul platform

Lainnya di BIM dan perhitungan volume

BIM dan perhitungan volume

Get 6D carbon from a BIM model

Turn a converted BIM model into an embodied carbon footprint. Auto-enrich reads quantities…

5 langkah12 mntBuka
BIM dan perhitungan volume

Get quantities from a BIM model

Load a converted model, lift the element quantities straight off the geometry, carry them i…

3 langkah12 mntBuka
BIM dan perhitungan volume

Measure quantities from a DWG

Load a DWG, lock the scale against a known dimension, measure the areas, lengths and counts…

3 langkah10 mntBuka