케이스 / BIM 및 물량 산출
BIM 및 물량 산출

Reconcile a drawing issue against the index

Diff an issued sheet set against the drawing index and see what is missing, what turned up unannounced and what is sitting at a revision the index does not expect, then chase the gaps with the numbers in hand.

4단계8 분종합건설사BIM / 디지털 컨설팅 업체PM/CM 업체

작동 방식, 단계별로

플랫폼 전반에 걸친 4단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Take in the issued sheet set

문서

Load the issued set into the project files and split it into individual sheets, so each drawing lands as its own record with a number and a revision picked up from the title block rather than sitting inside a two hundred page file.

이유: You cannot reconcile a bundle. Until the issue is broken into numbered sheets the only way to answer whether A-114 arrived is for somebody to scroll, and nobody scrolls the same set twice, which is how a missing sheet survives three weeks of everybody assuming it is in there.

입력Issued PDF setCovering transmittal결과Individual numbered sheetsRevision read off each one
2

Reconcile it against the index

도면실

Point the completeness check at the index, either the index PDF the designer issued or a sheet list pasted straight in, and run it. It reports what the index expects and you do not hold, what you hold and the index never mentioned, and what matched but at a different revision.

이유: Sheet numbers get written a dozen ways across a project, A-101, A 101, a.101, so ticking two lists off by eye reliably misses the ones that differ only by a hyphen. The check collapses those differences before it compares, which is why it finds gaps a careful person reading the same two lists will not.

입력Sheets you actually holdDrawing index or issue register결과Missing and extra listsRevision mismatches
3

Chase what never arrived

송부

Check the missing list against the transmittal record first, to be sure the sheets were genuinely never issued rather than mislaid on your side, then go back to the issuer with the exact numbers and the revision each one should be at.

이유: A designer answers we sent everything in one line, and answers a list of eleven sheet numbers in a day. Naming the gap precisely, against the transmittal that was meant to carry it, turns a fortnight of email into a short conversation, and leaves a dated trail if the missing sheet later costs somebody a week.

입력Missing sheet numbersTransmittal log결과Request naming each sheetDated chase trail
4

Account for what arrived unannounced

문서

Work the other two lists. Register the sheets that came in outside the index so they stop being invisible, and for every revision mismatch settle which side is behind, the index or the set, before anyone builds from either.

이유: An extra sheet is usually one somebody issued without updating the index, which makes it the drawing nobody is tracking. A revision mismatch is worse, because both parties are certain they hold the current sheet and one of them is pricing or pouring to geometry that has already moved.

입력Extra sheets and mismatchesDrawing register결과Everything registeredAgreed current revision
모듈

이 플레이북의 모듈

플랫폼 184개 모듈 중 3

BIM 및 물량 산출 카테고리의 더 보기

BIM 및 물량 산출

BIM 모델에서 6D 탄소 산출

변환된 BIM 모델을 내재탄소 발자국으로 전환합니다. 자동 보강 기능이 형상에서 물량을 읽고 각 자재를 배출계수와 매칭한 뒤, 감축 목표를 설정하고 보고서를 발행합니…

5단계12 분열기
BIM 및 물량 산출

BIM 모델에서 수량 산출

변환된 모델을 불러와 형상에서 직접 요소 수량을 추출하고, 이를 가격 산정된 견적서로 반영하며, 매핑한 내용을 검증한다.

3단계12 분열기
BIM 및 물량 산출

DWG에서 수량 산출

DWG를 불러와 알려진 치수로 축척을 고정하고, 필요한 면적, 길이, 개수를 측정한 뒤 그 수량을 산출된 내역서로 바로 전달합니다.

3단계10 분열기