Reconcile a drawing issue against the index

Diff an issued sheet set against the drawing index and see what is missing, what turned up unannounced and what is sitting at a revision the index does not expect, then chase the gaps with the numbers in hand.

4 个步骤8 分钟总承包商BIM/数字化顾问公司项目/施工管理公司

运作方式,逐步说明

贯穿平台的 4 个步骤 - 每一步做什么,以及为什么重要。

1

Take in the issued sheet set

文档

Load the issued set into the project files and split it into individual sheets, so each drawing lands as its own record with a number and a revision picked up from the title block rather than sitting inside a two hundred page file.

原因: You cannot reconcile a bundle. Until the issue is broken into numbered sheets the only way to answer whether A-114 arrived is for somebody to scroll, and nobody scrolls the same set twice, which is how a missing sheet survives three weeks of everybody assuming it is in there.

输入Issued PDF setCovering transmittal成果Individual numbered sheetsRevision read off each one
2

Reconcile it against the index

图纸室

Point the completeness check at the index, either the index PDF the designer issued or a sheet list pasted straight in, and run it. It reports what the index expects and you do not hold, what you hold and the index never mentioned, and what matched but at a different revision.

原因: Sheet numbers get written a dozen ways across a project, A-101, A 101, a.101, so ticking two lists off by eye reliably misses the ones that differ only by a hyphen. The check collapses those differences before it compares, which is why it finds gaps a careful person reading the same two lists will not.

输入Sheets you actually holdDrawing index or issue register成果Missing and extra listsRevision mismatches
3

Chase what never arrived

文件传递

Check the missing list against the transmittal record first, to be sure the sheets were genuinely never issued rather than mislaid on your side, then go back to the issuer with the exact numbers and the revision each one should be at.

原因: A designer answers we sent everything in one line, and answers a list of eleven sheet numbers in a day. Naming the gap precisely, against the transmittal that was meant to carry it, turns a fortnight of email into a short conversation, and leaves a dated trail if the missing sheet later costs somebody a week.

输入Missing sheet numbersTransmittal log成果Request naming each sheetDated chase trail
4

Account for what arrived unannounced

文档

Work the other two lists. Register the sheets that came in outside the index so they stop being invisible, and for every revision mismatch settle which side is behind, the index or the set, before anyone builds from either.

原因: An extra sheet is usually one somebody issued without updating the index, which makes it the drawing nobody is tracking. A revision mismatch is worse, because both parties are certain they hold the current sheet and one of them is pricing or pouring to geometry that has already moved.

输入Extra sheets and mismatchesDrawing register成果Everything registeredAgreed current revision
模块

此方案使用的模块

184 个平台模块中的 3

更多 BIM 与工程量计算 案例

BIM 与工程量计算

从BIM模型获取6D碳排放数据

把转换好的BIM模型转化为隐含碳排放核算。自动富集功能从几何体读取工程量,并将每种材料与排放因子匹配,然后你设定减排目标并出具报告。共五个步骤。

5 个步骤12 分钟打开
BIM 与工程量计算

从BIM模型获取工程量

加载已转换的模型,直接从几何体中提取构件工程量,导入已定价清单并对映射结果进行验证。

3 个步骤12 分钟打开
BIM 与工程量计算

从DWG图纸测量工程量

加载DWG图纸,以已知尺寸校准比例,测量所需的面积、长度和数量,再将这些工程量直接导入已计价的清单。

3 个步骤10 分钟打开