قیمت‌گذاری مناقصه بر اساس فهرست بهایی که بر آن حاکم است

مشخص کنید قرارداد بر مبنای کدام فهرست بها نوشته شده، همان را به‌عنوان مبنای هزینه بارگذاری کنید، صورت‌وضعیت را از روی آن قیمت‌گذاری کنید، و پیش از آنکه برآورد میز شما را ترک کند، ثابت کنید هر ردیف قلم فهرست بهایی که از آن آمده را همراه دارد.

5 مرحله22 دقیقهمشاوره هزینه / QSپیمانکار عمومیسازنده / کارفرمادفتر مدیریت پروژه / ساخت

چگونه کار می‌کند، گام به گام

5 گام در سراسر پلتفرم - کاری که در هر گام انجام می‌دهید و چرا اهمیت دارد.

1

Settle which schedule the contract is written against

قراردادها

Read the tender conditions and record, against the contract, which schedule of rates governs it, which edition, and what price level it is stated at. Central government work names CPWD DSR; state work names the state PWD schedule; a private client may name neither and leave you on market rates.

چرا: This is the one decision every later number depends on, and it is the one most often taken by assumption. Writing it down where the contract lives means the next person to open the estimate can see which document it was built from, instead of inferring it from the shape of the rates.

ورودیTender documentsWho is paying for the workخروجیThe governing schedule, namedIts edition and price level
2

Load that schedule as a cost base, not as a column you typed

پایگاه داده هزینه

Bring the schedule into the cost database through the ordinary import surface and check it landed with its item numbers, descriptions, units and rates intact. No commercial schedule ships with the product, so this is your own copy or your own cost history, loaded once and reused.

چرا: A schedule loaded as data can be searched, versioned and re-priced next year. A schedule transcribed into a spreadsheet column becomes a set of numbers with no provenance the moment the person who typed them moves on, and every query about a rate turns into an archaeology exercise.

ورودیYour copy of the scheduleخروجیCost base loaded and searchablePriced in INR
3

Price the bill and carry the item reference with the rate

صورت مقادیر (BOQ)

Work down the bill sub-head by sub-head, from earthwork to external services, pulling each rate off the loaded schedule and keeping its item number on the line. Where no schedule item fits, price it as a non-schedule item and say so on the line rather than bending a neighbouring item to cover it.

چرا: Non-schedule items are normal and are checked differently, by rate analysis rather than by lookup. Marking them at the point of pricing is what lets the department check the rest quickly and concentrate on the few that need argument, instead of treating the whole bill as unverified.

ورودیThe tender bill of quantitiesThe loaded scheduleخروجیA priced billSchedule item on every line
4

Run the check that finds a rate with nothing behind it

اعتبارسنجی

Validate the priced bill and read the findings. The India pack ships a rule that asks every priced line for its schedule item reference, so the lines you meant to mark as non-schedule and the lines you simply forgot both come back in one list.

چرا: The difference between a deliberate non-schedule item and a forgotten reference is invisible in a printed bill and obvious in a validation run. Finding it here costs a few minutes; finding it after the tender is opened costs a technical query you answer under a clock.

ورودیThe priced billخروجیLines with no item referenceA bill that passes before it is sent
5

Write down the basis while you still remember it

مبنای برآورد

Record the schedule and edition used, the price level and base date, the lead and lift assumptions, which items are non-schedule and how they were analysed, and what the estimate excludes.

چرا: An estimate on a public job is read months later by somebody who was not in the room, often during a query about a single item. The basis is what turns that from a defence of your memory into a reading of the file.

ورودیWhat you assumed and whyخروجیA written basis of estimate
ماژول‌ها

ماژول‌های این سناریو

5 / 190 ماژول پلتفرم

The market this case is written for

هند

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CPWD DSR
  • IS 456
  • RERA

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

بیشتر در برآورد و هزینه‌یابی

برآورد و هزینه‌یابی

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 مرحله8 دقیقهباز کردن
برآورد و هزینه‌یابی

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 مرحله12 دقیقهباز کردن
برآورد و هزینه‌یابی

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 مرحله11 دقیقهباز کردن