Measure from a point cloud survey

Load a laser-scan point cloud of the existing conditions, measure the distances, areas and volumes you need straight off the survey, carry them into the takeoff and price the work.

4 koraka11 minKonzultant za troškove / QSGlavni izvođačBIM / digitalni konzultant

Kako funkcionira, korak po korak

4 koraka kroz platformu - što radite u svakom i zašto je važno.

1

Load the survey

Oblak točaka

Load the point cloud of the existing conditions and orient yourself in it, checking the scan covers the areas you need to measure without big shadows or gaps.

Zašto: A scan with a hole where you need a dimension is worse than no scan, because you only find out at measuring time. Checking coverage first saves a wasted return to site.

UlazLaser-scan surveyRezultatLoaded point cloud
2

Measure what you need

Oblak točaka

Measure the distances, wall and floor areas, room heights and volumes you need directly on the cloud, reading them off the real geometry rather than a drawing.

Zašto: Existing buildings are never square or plumb the way a drawing pretends. Measuring the as-built reality is what keeps a refurbishment quantity honest and the price behind it safe.

UlazPoint cloudRezultatMeasured dimensionsAreas and volumes
3

Carry them into the takeoff

Iskaz količina

Bring the measured dimensions into the quantity takeoff as the source quantities for the work, keeping the link back to where each one was measured.

Zašto: A quantity that traces back to a point on the survey is defensible. When someone questions a figure, you can open the cloud and show the measurement it came from.

UlazMeasured dimensionsRezultatTakeoff quantities
4

Price the work

Troškovnik

Price the measured work in the bill, so the survey-based quantities flow straight into a cost without a rekey in between.

Zašto: Carrying scan measurements through to the bill keeps one unbroken chain from the real building to the price. Every manual copy in that chain is a chance to introduce an error.

UlazTakeoff quantitiesRezultatPriced work