Тохиолдлууд / Арилжаа ба гэрээ
Арилжаа ба гэрээ

Жагсаалтыг FIEBDC-3 форматаар Испани руу илгээх

Үнэ тавигдсан жагсаалтыг Испани, Латин Америкийн зах зээл солилцдог FIEBDC-3 форматаар экспортлож, десктоп тооцооллын хэрэгсэлд бодит төсөв байдлаар нээгдэж, өөрийн уншигчаар дамжин өөрчлөгдөлгүй буцаж ирдэг болгоно.

4 алхам11 минӨртгийн зөвлөгөө / QSЕрөнхий гүйцэтгэгчМэргэшсэн дэд гүйцэтгэгч

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 4 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Get the bill ready to travel

BOQ

Check the bill has the shape BC3 expects before you export anything: a chapter for each section, an item for each position, and a code, a unit, a quantity and a unit rate on every line. Long descriptions travel too, so read the ones you would rather a client did not see.

Дэлгэцийн зураг, 1-р алхам: Get the bill ready to travel (BOQ, Жагсаалтыг FIEBDC-3 форматаар Испани руу илгээх)
BOQ: Get the bill ready to travel

Яагаад: BC3 carries a hierarchy, so a bill with orphaned positions or two items sharing a code arrives at the other end as a budget nobody can navigate. Sorting the tree out here takes minutes. Sorting it out after someone has started pricing in their own software is no longer your decision to make.

ОролтPriced billChapter structureҮр дүнClean chapter and item treeEvery position coded
2

Export to FIEBDC-3

BOQ

Export the bill to FIEBDC-3. The file carries the chapters and items with their codes, units, quantities, unit rates and long texts, which is what a Spanish desktop estimating tool needs to open it as a working budget instead of a list of numbers.

Дэлгэцийн зураг, 2-р алхам: Export to FIEBDC-3 (BOQ, Жагсаалтыг FIEBDC-3 форматаар Испани руу илгээх)
BOQ: Export to FIEBDC-3

Яагаад: BC3 is what that market actually exchanges budgets in, and for Spanish public work it is not optional. Sending a spreadsheet instead means somebody at the other end retypes your bill, and a retyped bill of four hundred positions always loses a few.

ОролтStructured priced billFIEBDC-3 exportҮр дүнBC3 budget fileHierarchy, rates and texts
3

Check the charset in the header

BOQ

Open the file and read the charset the header declares. It is written Windows-1252 by default, which is what the desktop tools in that market expect, and it switches to UTF-8 only when a character in your texts cannot be represented. Either way the header states which one was used.

Яагаад: A mis-declared charset is the classic BC3 failure. The file opens, the numbers are all correct, and every accented character in the descriptions comes out as rubbish. It gets spotted late, usually by the client reading your descriptions, and it makes an otherwise careful submission look sloppy.

ОролтBC3 filePosition textsҮр дүнCharset named in the headerText that survives the trip
4

Prove the round trip

BOQ

Read the file you have just written straight back in through the BC3 importer and compare it against what you exported. Codes, chapters, quantities, units, rates and long texts should all come back the same.

Яагаад: An export nobody has ever read back is a guess. Putting it through your own reader takes a minute and is the difference between believing the file is sound and knowing it, which matters most on the submission where you do not get a second go.

ОролтExported BC3 fileBC3 importerҮр дүнRe-imported billConfirmed match
Модулиуд

Энэ тоглолтын модулиуд

Bill of Quantities

Платформын 190 модулиас 1

The market this case is written for

Испани

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Арилжаа ба гэрээ дахь бусад

Арилжаа ба гэрээ

Turn a change into a paid variation

Capture a scope change while it is fresh, price it as a contract variation on your agreed r…

3 алхам11 минНээх
Арилжаа ба гэрээ

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 алхам11 минНээх
Арилжаа ба гэрээ

Payment application and reconciliation

Value the work put in place this period against the contract, raise the application with th…

3 алхам12 минНээх