Kasus / Komersial dan kontrak
Komersial dan kontrak

Mengirim daftar ke Spanyol dalam format FIEBDC-3

Ekspor daftar yang sudah diberi harga ke FIEBDC-3, format presupuesto yang dipakai bertukar oleh pasar Spanyol dan Amerika Latin, sehingga terbuka sebagai presupuesto sungguhan di perangkat estimasi desktop dan kembali lewat pembaca Anda sendiri tanpa berubah.

4 langkah11 mntKonsultansi biaya / QSKontraktor umumSubkontraktor spesialis

Cara kerjanya, langkah demi langkah

4 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Get the bill ready to travel

BOQ

Check the bill has the shape BC3 expects before you export anything: a chapter for each section, an item for each position, and a code, a unit, a quantity and a unit rate on every line. Long descriptions travel too, so read the ones you would rather a client did not see.

Tangkapan layar, langkah 1: Get the bill ready to travel (BOQ, Mengirim daftar ke Spanyol dalam format FIEBDC-3)
BOQ: Get the bill ready to travel

Mengapa: BC3 carries a hierarchy, so a bill with orphaned positions or two items sharing a code arrives at the other end as a budget nobody can navigate. Sorting the tree out here takes minutes. Sorting it out after someone has started pricing in their own software is no longer your decision to make.

MasukanPriced billChapter structureHasilClean chapter and item treeEvery position coded
2

Export to FIEBDC-3

BOQ

Export the bill to FIEBDC-3. The file carries the chapters and items with their codes, units, quantities, unit rates and long texts, which is what a Spanish desktop estimating tool needs to open it as a working budget instead of a list of numbers.

Tangkapan layar, langkah 2: Export to FIEBDC-3 (BOQ, Mengirim daftar ke Spanyol dalam format FIEBDC-3)
BOQ: Export to FIEBDC-3

Mengapa: BC3 is what that market actually exchanges budgets in, and for Spanish public work it is not optional. Sending a spreadsheet instead means somebody at the other end retypes your bill, and a retyped bill of four hundred positions always loses a few.

MasukanStructured priced billFIEBDC-3 exportHasilBC3 budget fileHierarchy, rates and texts
3

Check the charset in the header

BOQ

Open the file and read the charset the header declares. It is written Windows-1252 by default, which is what the desktop tools in that market expect, and it switches to UTF-8 only when a character in your texts cannot be represented. Either way the header states which one was used.

Mengapa: A mis-declared charset is the classic BC3 failure. The file opens, the numbers are all correct, and every accented character in the descriptions comes out as rubbish. It gets spotted late, usually by the client reading your descriptions, and it makes an otherwise careful submission look sloppy.

MasukanBC3 filePosition textsHasilCharset named in the headerText that survives the trip
4

Prove the round trip

BOQ

Read the file you have just written straight back in through the BC3 importer and compare it against what you exported. Codes, chapters, quantities, units, rates and long texts should all come back the same.

Mengapa: An export nobody has ever read back is a guess. Putting it through your own reader takes a minute and is the difference between believing the file is sound and knowing it, which matters most on the submission where you do not get a second go.

MasukanExported BC3 fileBC3 importerHasilRe-imported billConfirmed match
Modul

Modul dalam playbook ini

Bill of Quantities

1 / 190 modul platform

The market this case is written for

Spanyol

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.