FIEBDC-3 में स्पेन को एक बिल भेजें

एक कीमत लगे बिल को FIEBDC-3 में एक्सपोर्ट करें, वह बजट फॉर्मेट जिसमें स्पैनिश और लैटिन अमेरिकी बाज़ार आदान-प्रदान करता है, ताकि यह किसी डेस्कटॉप एस्टीमेटिंग टूल में एक असली बजट के रूप में खुले और आपके अपने रीडर से बिना बदले वापस आए।

4 चरण11 मिनटलागत परामर्श / QS फर्ममुख्य ठेकेदारविशेषज्ञ उपठेकेदार

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 4 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Get the bill ready to travel

BOQ

Check the bill has the shape BC3 expects before you export anything: a chapter for each section, an item for each position, and a code, a unit, a quantity and a unit rate on every line. Long descriptions travel too, so read the ones you would rather a client did not see.

स्क्रीनशॉट, चरण 1: Get the bill ready to travel (BOQ, FIEBDC-3 में स्पेन को एक बिल भेजें)
BOQ: Get the bill ready to travel

क्यों: BC3 carries a hierarchy, so a bill with orphaned positions or two items sharing a code arrives at the other end as a budget nobody can navigate. Sorting the tree out here takes minutes. Sorting it out after someone has started pricing in their own software is no longer your decision to make.

इनपुटPriced billChapter structureपरिणामClean chapter and item treeEvery position coded
2

Export to FIEBDC-3

BOQ

Export the bill to FIEBDC-3. The file carries the chapters and items with their codes, units, quantities, unit rates and long texts, which is what a Spanish desktop estimating tool needs to open it as a working budget instead of a list of numbers.

स्क्रीनशॉट, चरण 2: Export to FIEBDC-3 (BOQ, FIEBDC-3 में स्पेन को एक बिल भेजें)
BOQ: Export to FIEBDC-3

क्यों: BC3 is what that market actually exchanges budgets in, and for Spanish public work it is not optional. Sending a spreadsheet instead means somebody at the other end retypes your bill, and a retyped bill of four hundred positions always loses a few.

इनपुटStructured priced billFIEBDC-3 exportपरिणामBC3 budget fileHierarchy, rates and texts
3

Check the charset in the header

BOQ

Open the file and read the charset the header declares. It is written Windows-1252 by default, which is what the desktop tools in that market expect, and it switches to UTF-8 only when a character in your texts cannot be represented. Either way the header states which one was used.

क्यों: A mis-declared charset is the classic BC3 failure. The file opens, the numbers are all correct, and every accented character in the descriptions comes out as rubbish. It gets spotted late, usually by the client reading your descriptions, and it makes an otherwise careful submission look sloppy.

इनपुटBC3 filePosition textsपरिणामCharset named in the headerText that survives the trip
4

Prove the round trip

BOQ

Read the file you have just written straight back in through the BC3 importer and compare it against what you exported. Codes, chapters, quantities, units, rates and long texts should all come back the same.

क्यों: An export nobody has ever read back is a guess. Putting it through your own reader takes a minute and is the difference between believing the file is sound and knowing it, which matters most on the submission where you do not get a second go.

इनपुटExported BC3 fileBC3 importerपरिणामRe-imported billConfirmed match
मॉड्यूल

इस प्लेबुक के मॉड्यूल

Bill of Quantities

प्लेटफ़ॉर्म के 190 में से 1 मॉड्यूल

The market this case is written for

स्पेन

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

वाणिज्यिक और अनुबंध में और देखें

वाणिज्यिक और अनुबंध

Turn a change into a paid variation

Capture a scope change while it is fresh, price it as a contract variation on your agreed r…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Payment application and reconciliation

Value the work put in place this period against the contract, raise the application with th…

3 चरण12 मिनटखोलें