Cases / Kwaliteit & veiligheid
Kwaliteit & veiligheid

Een controle die u steeds handmatig doet automatiseren

Neem de controle die u elke week handmatig uitvoert, bouw hem eenmalig als pipeline vanuit een kant-en-klare sjabloon, controleer hem zodat niets stilletjes nergens naartoe wijst, en zet hem in de bibliotheek zodat hij elke keer op dezelfde manier draait.

4 stappen14 minHoofdaannemerKostenadvies- / QS-bureauBIM- / digitaliseringsadvies

Zo werkt het, stap voor stap

4 stappen door het platform - wat je bij elke stap doet en waarom het ertoe doet.

1

Start from a template

Pipelines

Open the pipeline builder and take the ready-made graph closest to the check you do by hand: flag positions still at zero, list the costliest items, guard a budget ceiling, or gate an export behind validation. It lands on the canvas already wired and already runnable.

Schermafbeelding, stap 1: Start from a template (Pipelines, Een controle die u steeds handmatig doet automatiseren)
Pipelines: Start from a template

Waarom: An empty canvas is where most automation ideas die, because the first hour goes on working out which port feeds which. Starting from a graph that runs on the first click means you begin by reading logic that works, and change it, rather than guessing at logic that does not.

InvoerThe check you do by handTemplate galleryResultaatA graph that already runsNamed pipeline
2

Point it at your own data

Pipelines

Swap the template's source for your own bill, catalog or validation findings, then set the numbers that matter on this job: the ceiling the budget guard trips at, the figure a threshold gate compares against. Add a computed column, a group and total, a rename or a fan-out where the shape does not quite fit, and a non-empty guard so an empty source stops the run instead of passing it.

Schermafbeelding, stap 2: Point it at your own data (Pipelines, Een controle die u steeds handmatig doet automatiseren)
Pipelines: Point it at your own data

Waarom: A template carries the logic, never your project's numbers. A ceiling left at the demo figure passes everything you feed it, which is worse than having no guard at all, because the run goes green and everyone believes a check was done.

InvoerTemplate graphYour bill or catalogResultaatGraph bound to real dataThresholds set for this job
3

Lint it, then run it

Pipelines

Read the issue count before you press run. It flags any step whose required input has no incoming wire, and any node sitting on the canvas as an island with no wire at all. Clear those, run the pipeline, then read what each step actually did rather than just the final total.

Waarom: A step wired to nothing does not fail. It simply never runs, and the pipeline reports success while doing less than the canvas makes it look like it does. That is the failure worth hunting, because a green run is precisely what stops anyone looking again.

InvoerWired graphRequired inputs per nodeResultaatIssue count at zeroA run with findings
4

Act on what it found

Validatie

Take the findings through into validation, fix the positions they point at, and save the workflow so it shows up in the picker next month instead of being rebuilt from memory.

Schermafbeelding, stap 4: Act on what it found (Validatie, Een controle die u steeds handmatig doet automatiseren)
Validatie: Act on what it found

Waarom: Automation only pays back on the second run. A check that lives in one person's head gets skipped the week they are on leave, and on a long job that is reliably the week it would have caught something expensive.

InvoerPipeline findingsThe positions they point atResultaatCorrected positionsA check that now runs itself
Modules

Modules in dit playbook

2 / 190 platformmodules

Meer in Kwaliteit & veiligheid

Kwaliteit & veiligheid

Toolbox talk and safety check

Brief the crew on the hazards this shift actually carries, capture who was there, then prov…

2 stappen8 minOpenen
Kwaliteit & veiligheid

Get a material submittal approved

Put the product you plan to buy in front of the designer with its data behind it, get it ch…

3 stappen9 minOpenen