Cases / Handover & lifecycle
Handover & lifecycle

Check the asset data drop before handover

Make sure the model hands over usable asset data: read what the BIM carries, check it against the information requirements, and load only the assets that pass into the register.

3 steps8 minBIM / digital consultancyOwner / operator (FM)

How it works, step by step

3 steps across the platform - what you do at each one, and why it matters.

1

Read the asset data the model carries

BIM

Open the model and list the assets it holds with the data attached to each, from make and model to serial, warranty and the maintainable-item flags the operator needs.

Why: You cannot check data you have not looked at. Reading straight from the model is what shows whether the designer's promise of a data-rich handover survived into the file you were actually given.

InFederated modelAsset information requirementsOutAsset property listData completeness view
2

Check it against the requirements

QMS

Run each asset's properties against the required set, flag the blanks and the wrong formats, and log the failures back to whoever owns the model to fix before handover, not after.

Why: Handover is the last moment you have leverage to get the data fixed for free. A defect list raised now is corrected by the delivery team; the same gap found next month is your problem to chase and fund.

InAsset property listRequired property setOutPass and fail listData defect log
3

Load the passing assets into the register

Assets

Bring the assets that passed the check into the register with their data intact, and hold back the ones that failed until they are corrected, so the register never inherits a known-bad record.

Why: The register is what the whole FM operation runs off, so a bad record there spreads into every work order and report. Loading only the passing data keeps the single source of truth actually trustworthy.

InPass and fail listApproved asset recordsOutPopulated asset registerTraceable data source
Modules

Modules in this playbook

3 / 190 platform modules

More in Handover & lifecycle

Handover & lifecycle

Hand over and close out

Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…

5 steps14 minOpen
Handover & lifecycle

As-built and O and M handover

Pull the as-built record together, prove the quality file has no gaps, then issue an operat…

3 steps12 minOpen