Juhtumid / Kalkuleerimine ja hindamine
Kalkuleerimine ja hindamine

Koosta partida selle precio descompuesto põhjal

Hinnasta ressursid üks kord, koosta precios auxiliares, millest sinu töö tegelikult koosneb, pane partida nendest kokku määratud rendimientos'e juures ning lase ühikuhinnal arvutuda, mitte käsitsi sisestada.

5 sammu20 minKulunõustamine / QSPeatöövõtjaErialaalltöövõtja

Kuidas see töötab, samm-sammult

5 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

Price the resources once

Ressursikataloog

Put the mano de obra, materiales and maquinaria into the catalog as priced resources, each with the unit it is bought or paid in and a resource type that says which of the three it is. An hour of oficial de primera, a tonne of cement, a day of retroexcavadora.

Miks: Every partida in the presupuesto will lean on these same few dozen rates. Priced once, a change to the steel price moves every partida that contains steel in one edit. Priced inside each partida, the same change is a search through four hundred lines and you will miss some.

SisendSupplier quotes and labour costsUnits of measureVäljundPriced resource ratesLabour, material and plant separated
2

Build the precios auxiliares first

Koostised

Anything made on site before it goes into the work is an auxiliar: the mortero, the hormigon amasado en obra, the encofrado you assemble and reuse. Build each one as its own assembly, in its own unit, from the resources you just priced.

Miks: The mortero appears in the brickwork, the rendering and the paving, and it is one mix. Modelled once as an auxiliar it stays one number in three partidas. Retyped into each of them it is three numbers that drift apart the first time the sand price moves, and nobody notices which one is stale.

SisendPriced resource ratesMix quantities per unitVäljundPrecio auxiliar with a computed rate
3

Compose the partida at stated rendimientos

Koostised

Build the partida as an assembly in the unit the bill measures it in, and give every component the quantity of that resource one unit of work consumes. Add the costes indirectos and the medios auxiliares as their own components so a reader can see them rather than infer them from a coefficient.

Miks: The rendimiento is the number the argument is actually about. Written down, a client who thinks one point three hours per square metre is generous can say so and you can answer with a postcalc. Buried in a lump rate, the same disagreement comes out as a claim that you are expensive, and there is nothing to point at.

SisendPrecios auxiliares pricedRendimientos per unit of workVäljundPartida assembly with a built-up rateReadable priced breakdown
4

Put the calculated rate on the bill

Mahutabel

Apply the assembly to the position in the bill so the unit rate is the total of the descomposicion rather than a number somebody keyed in. Do the same for the partidas that share a recipe and differ only in thickness or diameter.

Miks: A typed rate and its breakdown stop agreeing the moment either changes, and the bill is the one everybody reads. Linking them means the presupuesto you print and the calculation you defend are the same arithmetic, which is the whole reason for building the descomposicion in the first place.

SisendPartida assembly and its rateBill positions to priceVäljundPriced bill positionsRate linked to its breakdown
5

Keep it as your own base de precios

Kuluandmebaas

Move the descompuestos you are happy with into the cost database as your own base de precios, with the codes you want to search by. The next presupuesto starts from these instead of from a published base you have to correct in the same three places every time.

Miks: A published base de precios is a good starting point and a poor finishing one: its rendimientos are regional averages and its prices are last year's. The version corrected by your own jobs is worth more than either, and it only accumulates if somebody puts it somewhere other than in the last project folder.

SisendFinished descompuesto ratesVäljundYour own cost databaseRates ready for the next estimate
Moodulid

Selle tegevusjuhendi moodulid

4 / 190 platvormi moodulit

The market this case is written for

Hispaania

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Rohkem valdkonnas Kalkuleerimine ja hindamine

Kalkuleerimine ja hindamine

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 sammu12 minAva
Kalkuleerimine ja hindamine

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 sammu11 minAva