Casos prácticos / Presupuestación y costos
Presupuestación y costos

Construir una partida a partir de su precio descompuesto

Precia los insumos una sola vez, arma los precios auxiliares de tu trabajo, compón la partida con ellos a los rendimientos indicados, y deja que el precio unitario se calcule solo en vez de teclearlo.

5 pasos20 minConsultoría de costos / QSContratista generalSubcontratista especializado

Cómo funciona, paso a paso

5 pasos a lo largo de la plataforma - qué haces en cada uno y por qué importa.

1

Price the resources once

Catálogo de recursos

Put the mano de obra, materiales and maquinaria into the catalog as priced resources, each with the unit it is bought or paid in and a resource type that says which of the three it is. An hour of oficial de primera, a tonne of cement, a day of retroexcavadora.

Por que: Every partida in the presupuesto will lean on these same few dozen rates. Priced once, a change to the steel price moves every partida that contains steel in one edit. Priced inside each partida, the same change is a search through four hundred lines and you will miss some.

EntradaSupplier quotes and labour costsUnits of measureResultadoPriced resource ratesLabour, material and plant separated
2

Build the precios auxiliares first

Partidas compuestas

Anything made on site before it goes into the work is an auxiliar: the mortero, the hormigon amasado en obra, the encofrado you assemble and reuse. Build each one as its own assembly, in its own unit, from the resources you just priced.

Por que: The mortero appears in the brickwork, the rendering and the paving, and it is one mix. Modelled once as an auxiliar it stays one number in three partidas. Retyped into each of them it is three numbers that drift apart the first time the sand price moves, and nobody notices which one is stale.

EntradaPriced resource ratesMix quantities per unitResultadoPrecio auxiliar with a computed rate
3

Compose the partida at stated rendimientos

Partidas compuestas

Build the partida as an assembly in the unit the bill measures it in, and give every component the quantity of that resource one unit of work consumes. Add the costes indirectos and the medios auxiliares as their own components so a reader can see them rather than infer them from a coefficient.

Por que: The rendimiento is the number the argument is actually about. Written down, a client who thinks one point three hours per square metre is generous can say so and you can answer with a postcalc. Buried in a lump rate, the same disagreement comes out as a claim that you are expensive, and there is nothing to point at.

EntradaPrecios auxiliares pricedRendimientos per unit of workResultadoPartida assembly with a built-up rateReadable priced breakdown
4

Put the calculated rate on the bill

Presupuesto

Apply the assembly to the position in the bill so the unit rate is the total of the descomposicion rather than a number somebody keyed in. Do the same for the partidas that share a recipe and differ only in thickness or diameter.

Por que: A typed rate and its breakdown stop agreeing the moment either changes, and the bill is the one everybody reads. Linking them means the presupuesto you print and the calculation you defend are the same arithmetic, which is the whole reason for building the descomposicion in the first place.

EntradaPartida assembly and its rateBill positions to priceResultadoPriced bill positionsRate linked to its breakdown
5

Keep it as your own base de precios

Base de datos de costos

Move the descompuestos you are happy with into the cost database as your own base de precios, with the codes you want to search by. The next presupuesto starts from these instead of from a published base you have to correct in the same three places every time.

Por que: A published base de precios is a good starting point and a poor finishing one: its rendimientos are regional averages and its prices are last year's. The version corrected by your own jobs is worth more than either, and it only accumulates if somebody puts it somewhere other than in the last project folder.

EntradaFinished descompuesto ratesResultadoYour own cost databaseRates ready for the next estimate
Módulos

Módulos de este playbook

4 / 190 módulos de la plataforma

The market this case is written for

España

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Más en Presupuestación y costos

Presupuestación y costos

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 pasos12 minAbrir
Presupuestación y costos

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 pasos11 minAbrir