केस / आकलन और लागत
आकलन और लागत

precio descompuesto से एक partida बनाएं

संसाधनों की कीमत एक बार तय करें, precios auxiliares बनाएं जिनसे आपका काम वास्तव में बना है, बताए गए rendimientos पर उनसे partida बनाएं, और यूनिट दर को टाइप करने के बजाय गणना होने दें।

5 चरण20 मिनटलागत परामर्श / QS फर्ममुख्य ठेकेदारविशेषज्ञ उपठेकेदार

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 5 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Price the resources once

संसाधन कैटलॉग

Put the mano de obra, materiales and maquinaria into the catalog as priced resources, each with the unit it is bought or paid in and a resource type that says which of the three it is. An hour of oficial de primera, a tonne of cement, a day of retroexcavadora.

स्क्रीनशॉट, चरण 1: Price the resources once (संसाधन कैटलॉग, precio descompuesto से एक partida बनाएं)
संसाधन कैटलॉग: Price the resources once

क्यों: Every partida in the presupuesto will lean on these same few dozen rates. Priced once, a change to the steel price moves every partida that contains steel in one edit. Priced inside each partida, the same change is a search through four hundred lines and you will miss some.

इनपुटSupplier quotes and labour costsUnits of measureपरिणामPriced resource ratesLabour, material and plant separated
2

Build the precios auxiliares first

संयुक्त दर विश्लेषण

Anything made on site before it goes into the work is an auxiliar: the mortero, the hormigon amasado en obra, the encofrado you assemble and reuse. Build each one as its own assembly, in its own unit, from the resources you just priced.

स्क्रीनशॉट, चरण 2: Build the precios auxiliares first (संयुक्त दर विश्लेषण, precio descompuesto से एक partida बनाएं)
संयुक्त दर विश्लेषण: Build the precios auxiliares first

क्यों: The mortero appears in the brickwork, the rendering and the paving, and it is one mix. Modelled once as an auxiliar it stays one number in three partidas. Retyped into each of them it is three numbers that drift apart the first time the sand price moves, and nobody notices which one is stale.

इनपुटPriced resource ratesMix quantities per unitपरिणामPrecio auxiliar with a computed rate
3

Compose the partida at stated rendimientos

संयुक्त दर विश्लेषण

Build the partida as an assembly in the unit the bill measures it in, and give every component the quantity of that resource one unit of work consumes. Add the costes indirectos and the medios auxiliares as their own components so a reader can see them rather than infer them from a coefficient.

स्क्रीनशॉट, चरण 3: Compose the partida at stated rendimientos (संयुक्त दर विश्लेषण, precio descompuesto से एक partida बनाएं)
संयुक्त दर विश्लेषण: Compose the partida at stated rendimientos

क्यों: The rendimiento is the number the argument is actually about. Written down, a client who thinks one point three hours per square metre is generous can say so and you can answer with a postcalc. Buried in a lump rate, the same disagreement comes out as a claim that you are expensive, and there is nothing to point at.

इनपुटPrecios auxiliares pricedRendimientos per unit of workपरिणामPartida assembly with a built-up rateReadable priced breakdown
4

Put the calculated rate on the bill

मात्रा विवरण

Apply the assembly to the position in the bill so the unit rate is the total of the descomposicion rather than a number somebody keyed in. Do the same for the partidas that share a recipe and differ only in thickness or diameter.

क्यों: A typed rate and its breakdown stop agreeing the moment either changes, and the bill is the one everybody reads. Linking them means the presupuesto you print and the calculation you defend are the same arithmetic, which is the whole reason for building the descomposicion in the first place.

इनपुटPartida assembly and its rateBill positions to priceपरिणामPriced bill positionsRate linked to its breakdown
5

Keep it as your own base de precios

लागत डेटाबेस

Move the descompuestos you are happy with into the cost database as your own base de precios, with the codes you want to search by. The next presupuesto starts from these instead of from a published base you have to correct in the same three places every time.

स्क्रीनशॉट, चरण 5: Keep it as your own base de precios (लागत डेटाबेस, precio descompuesto से एक partida बनाएं)
लागत डेटाबेस: Keep it as your own base de precios

क्यों: A published base de precios is a good starting point and a poor finishing one: its rendimientos are regional averages and its prices are last year's. The version corrected by your own jobs is worth more than either, and it only accumulates if somebody puts it somewhere other than in the last project folder.

इनपुटFinished descompuesto ratesपरिणामYour own cost databaseRates ready for the next estimate
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 4 मॉड्यूल

The market this case is written for

स्पेन

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • FIEBDC-3 (BC3)
  • LCSP

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

आकलन और लागत में और देखें

आकलन और लागत

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 चरण8 मिनटखोलें
आकलन और लागत

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 चरण12 मिनटखोलें
आकलन और लागत

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 चरण11 मिनटखोलें