एक GAEB टेंडर जीतें, LV से Angebot तक

क्लाइंट के GAEB X83 टेंडर को दोबारा टाइप करने के बजाय सीधे एक बिल में पढ़ें, हर पोजीशन की कीमत तय करें, कुल जांचें, और ऑफर को GAEB X84 Angebotsabgabe के रूप में वापस सौंपें।

7 चरण12 मिनटमुख्य ठेकेदारविशेषज्ञ उपठेकेदार

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 7 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

File the tender documents as received

दस्तावेज़

Save the GAEB X83 and the rest of the Vergabeunterlagen into the project files exactly as the client sent them, with the date they arrived and the Angebotsfrist recorded alongside.

स्क्रीनशॉट, चरण 1: File the tender documents as received (दस्तावेज़, एक GAEB टेंडर जीतें, LV से Angebot तक)
दस्तावेज़: File the tender documents as received

क्यों: Tenders get corrected and reissued during the bidding period. Keeping the file you actually priced on record is what lets you show, weeks later, which version your offer answers.

इनपुटGAEB X83 fileTender documentsपरिणामFiled tender setDeadline on record
2

Import the X83 as a new LV

GAEB एक्सचेंज

Open the Import tab, drop the X83 in, check the preview of the parsed positions, then import them into a new bill named after the tender. The Ordnungszahl, the unit, the quantity and the long text of every position arrive unchanged.

क्यों: This is the step that removes the retyping. Keying several hundred positions by hand is exactly where a transposed quantity or a dropped position turns into a loss you only notice on site.

इनपुटGAEB X83 fileTarget projectपरिणामBill with LV positionsOZ and units preserved
3

Settle the rate basis you price from

लागत डेटाबेस

In the cost database, decide which rates this offer is built on, whether that is your own recorded costs or a maintained catalog, and add the items the LV asks for that you do not carry a price for yet.

स्क्रीनशॉट, चरण 3: Settle the rate basis you price from (लागत डेटाबेस, एक GAEB टेंडर जीतें, LV से Angebot तक)
लागत डेटाबेस: Settle the rate basis you price from

क्यों: A rate whose origin you can name is a rate you can defend if the client asks you to explain it. Fixing the basis up front also stops the same work being priced two different ways inside one offer.

इनपुटLV positionsOwn cost recordsपरिणामRate basisMissing rates flagged
4

Price every position and read the Langtext

मात्रा विवरण

Work down the bill and put a unit price on every position, reading the long text as you go so a duty buried in a description is priced rather than discovered later. The bill totals each position and rolls up the Angebotssumme as you type.

स्क्रीनशॉट, चरण 4: Price every position and read the Langtext (मात्रा विवरण, एक GAEB टेंडर जीतें, LV से Angebot तक)
मात्रा विवरण: Price every position and read the Langtext

क्यों: The long text is where the risk sits: a wording that quietly hands you the substrate, the disposal or the working hours. Catching it while you price costs minutes, catching it on site costs the margin.

इनपुटImported LV positionsRate basisपरिणामUnit pricesAngebotssumme
5

Check the offer before it leaves the house

सत्यापन

Run validation over the priced bill and clear what it finds: a position still standing at zero, a quantity or unit that drifted away from the LV, a structure rule the return file has to honour. Then check the Angebotssumme for plausibility against a job of this size.

स्क्रीनशॉट, चरण 5: Check the offer before it leaves the house (सत्यापन, एक GAEB टेंडर जीतें, LV से Angebot तक)
सत्यापन: Check the offer before it leaves the house

क्यों: One unpriced position can take the whole offer out of the evaluation, and a total that is out by a decimal place is worse than losing the job. These five minutes are the cheapest insurance in the entire tender.

इनपुटPriced billOriginal LVपरिणामValidation reportFindings cleared
6

Export the Angebotsabgabe as X84

GAEB एक्सचेंज

Switch to the Export tab, pick the priced bill and choose the X84 format. What you get back is the Angebotsabgabe: your Bieter details, a unit price and a total on each position, and the offer totals, all on the same Ordnungszahl you were sent.

क्यों: X84 is the exchange phase the client's software expects an offer to arrive in. Returning the numbering they issued means your prices load straight into their Preisspiegel instead of being retyped or set aside.

इनपुटValidated priced billBidder detailsपरिणामGAEB X84 HauptangebotOffer totals
7

Submit the Angebot and log what went out

प्रेषण

Assemble the X84 with the signed tender forms and any Nebenangebot the tender allows into one submission, issue it before the Angebotsfrist, and keep the record of what went out, to whom and when.

स्क्रीनशॉट, चरण 7: Submit the Angebot and log what went out (प्रेषण, एक GAEB टेंडर जीतें, LV से Angebot तक)
प्रेषण: Submit the Angebot and log what went out

क्यों: A strong price inside an incomplete or late submission is not a price, it is an exclusion. The dated record of what you sent is also the starting point for any Nachtrag discussion once you win.

इनपुटGAEB X84 HauptangebotSigned tender formsपरिणामSubmitted AngebotSubmission record
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 6 मॉड्यूल

The market this case is written for

जर्मनी

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

निविदा और खरीद में और देखें

निविदा और खरीद

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 चरण12 मिनटखोलें
निविदा और खरीद

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 चरण10 मिनटखोलें
निविदा और खरीद

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 चरण12 मिनटखोलें