Případy / Výběrová řízení a nákup
Výběrová řízení a nákup

Vyhrát soutěž GAEB, od LV po Angebot

Načtěte klientovu soutěž GAEB X83 přímo do výkazu výměr místo přepisování, nacěňte každou položku, zkontrolujte součet, a vraťte nabídku jako GAEB X84 Angebotsabgabe.

7 kroků12 minGenerální dodavatelSpecializovaný subdodavatel

Jak to funguje, krok za krokem

7 kroků napříč platformou - co na každém uděláte a proč na tom záleží.

1

File the tender documents as received

Dokumenty

Save the GAEB X83 and the rest of the Vergabeunterlagen into the project files exactly as the client sent them, with the date they arrived and the Angebotsfrist recorded alongside.

Snímek obrazovky, krok 1: File the tender documents as received (Dokumenty, Vyhrát soutěž GAEB, od LV po Angebot)
Dokumenty: File the tender documents as received

Proč: Tenders get corrected and reissued during the bidding period. Keeping the file you actually priced on record is what lets you show, weeks later, which version your offer answers.

VstupGAEB X83 fileTender documentsVýstupFiled tender setDeadline on record
2

Import the X83 as a new LV

GAEB výměna

Open the Import tab, drop the X83 in, check the preview of the parsed positions, then import them into a new bill named after the tender. The Ordnungszahl, the unit, the quantity and the long text of every position arrive unchanged.

Proč: This is the step that removes the retyping. Keying several hundred positions by hand is exactly where a transposed quantity or a dropped position turns into a loss you only notice on site.

VstupGAEB X83 fileTarget projectVýstupBill with LV positionsOZ and units preserved
3

Settle the rate basis you price from

Databáze cen

In the cost database, decide which rates this offer is built on, whether that is your own recorded costs or a maintained catalog, and add the items the LV asks for that you do not carry a price for yet.

Snímek obrazovky, krok 3: Settle the rate basis you price from (Databáze cen, Vyhrát soutěž GAEB, od LV po Angebot)
Databáze cen: Settle the rate basis you price from

Proč: A rate whose origin you can name is a rate you can defend if the client asks you to explain it. Fixing the basis up front also stops the same work being priced two different ways inside one offer.

VstupLV positionsOwn cost recordsVýstupRate basisMissing rates flagged
4

Price every position and read the Langtext

Rozpočet

Work down the bill and put a unit price on every position, reading the long text as you go so a duty buried in a description is priced rather than discovered later. The bill totals each position and rolls up the Angebotssumme as you type.

Snímek obrazovky, krok 4: Price every position and read the Langtext (Rozpočet, Vyhrát soutěž GAEB, od LV po Angebot)
Rozpočet: Price every position and read the Langtext

Proč: The long text is where the risk sits: a wording that quietly hands you the substrate, the disposal or the working hours. Catching it while you price costs minutes, catching it on site costs the margin.

VstupImported LV positionsRate basisVýstupUnit pricesAngebotssumme
5

Check the offer before it leaves the house

Validace

Run validation over the priced bill and clear what it finds: a position still standing at zero, a quantity or unit that drifted away from the LV, a structure rule the return file has to honour. Then check the Angebotssumme for plausibility against a job of this size.

Snímek obrazovky, krok 5: Check the offer before it leaves the house (Validace, Vyhrát soutěž GAEB, od LV po Angebot)
Validace: Check the offer before it leaves the house

Proč: One unpriced position can take the whole offer out of the evaluation, and a total that is out by a decimal place is worse than losing the job. These five minutes are the cheapest insurance in the entire tender.

VstupPriced billOriginal LVVýstupValidation reportFindings cleared
6

Export the Angebotsabgabe as X84

GAEB výměna

Switch to the Export tab, pick the priced bill and choose the X84 format. What you get back is the Angebotsabgabe: your Bieter details, a unit price and a total on each position, and the offer totals, all on the same Ordnungszahl you were sent.

Proč: X84 is the exchange phase the client's software expects an offer to arrive in. Returning the numbering they issued means your prices load straight into their Preisspiegel instead of being retyped or set aside.

VstupValidated priced billBidder detailsVýstupGAEB X84 HauptangebotOffer totals
7

Submit the Angebot and log what went out

Předání

Assemble the X84 with the signed tender forms and any Nebenangebot the tender allows into one submission, issue it before the Angebotsfrist, and keep the record of what went out, to whom and when.

Snímek obrazovky, krok 7: Submit the Angebot and log what went out (Předání, Vyhrát soutěž GAEB, od LV po Angebot)
Předání: Submit the Angebot and log what went out

Proč: A strong price inside an incomplete or late submission is not a price, it is an exclusion. The dated record of what you sent is also the starting point for any Nachtrag discussion once you win.

VstupGAEB X84 HauptangebotSigned tender formsVýstupSubmitted AngebotSubmission record
Moduly

Moduly v tomto playbooku

6 / 190 modulů platformy

The market this case is written for

Německo

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Více v kategorii Výběrová řízení a nákup

Výběrová řízení a nákup

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 kroků12 minOtevřít
Výběrová řízení a nákup

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 kroků10 minOtevřít
Výběrová řízení a nákup

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 kroků12 minOtevřít