Казуси / Търгове и доставки
Търгове и доставки

Спечелете търг по GAEB - от LV до Angebot

Прочетете тръжния файл на клиента по GAEB X83 директно в сметка, вместо да го препечатвате, остойностете всяка позиция, проверете общата сума и върнете офертата като GAEB X84 Angebotsabgabe.

7 стъпки12 минГлавен изпълнителСпециализиран подизпълнител

Как работи, стъпка по стъпка

7 стъпки през платформата - какво правите на всяка и защо е важно.

1

File the tender documents as received

Документи

Save the GAEB X83 and the rest of the Vergabeunterlagen into the project files exactly as the client sent them, with the date they arrived and the Angebotsfrist recorded alongside.

Екранна снимка, стъпка 1: File the tender documents as received (Документи, Спечелете търг по GAEB - от LV до Angebot)
Документи: File the tender documents as received

Защо: Tenders get corrected and reissued during the bidding period. Keeping the file you actually priced on record is what lets you show, weeks later, which version your offer answers.

ВходGAEB X83 fileTender documentsРезултатFiled tender setDeadline on record
2

Import the X83 as a new LV

GAEB обмен

Open the Import tab, drop the X83 in, check the preview of the parsed positions, then import them into a new bill named after the tender. The Ordnungszahl, the unit, the quantity and the long text of every position arrive unchanged.

Защо: This is the step that removes the retyping. Keying several hundred positions by hand is exactly where a transposed quantity or a dropped position turns into a loss you only notice on site.

ВходGAEB X83 fileTarget projectРезултатBill with LV positionsOZ and units preserved
3

Settle the rate basis you price from

Ценоразпис

In the cost database, decide which rates this offer is built on, whether that is your own recorded costs or a maintained catalog, and add the items the LV asks for that you do not carry a price for yet.

Екранна снимка, стъпка 3: Settle the rate basis you price from (Ценоразпис, Спечелете търг по GAEB - от LV до Angebot)
Ценоразпис: Settle the rate basis you price from

Защо: A rate whose origin you can name is a rate you can defend if the client asks you to explain it. Fixing the basis up front also stops the same work being priced two different ways inside one offer.

ВходLV positionsOwn cost recordsРезултатRate basisMissing rates flagged
4

Price every position and read the Langtext

Количествена сметка

Work down the bill and put a unit price on every position, reading the long text as you go so a duty buried in a description is priced rather than discovered later. The bill totals each position and rolls up the Angebotssumme as you type.

Екранна снимка, стъпка 4: Price every position and read the Langtext (Количествена сметка, Спечелете търг по GAEB - от LV до Angebot)
Количествена сметка: Price every position and read the Langtext

Защо: The long text is where the risk sits: a wording that quietly hands you the substrate, the disposal or the working hours. Catching it while you price costs minutes, catching it on site costs the margin.

ВходImported LV positionsRate basisРезултатUnit pricesAngebotssumme
5

Check the offer before it leaves the house

Валидация

Run validation over the priced bill and clear what it finds: a position still standing at zero, a quantity or unit that drifted away from the LV, a structure rule the return file has to honour. Then check the Angebotssumme for plausibility against a job of this size.

Екранна снимка, стъпка 5: Check the offer before it leaves the house (Валидация, Спечелете търг по GAEB - от LV до Angebot)
Валидация: Check the offer before it leaves the house

Защо: One unpriced position can take the whole offer out of the evaluation, and a total that is out by a decimal place is worse than losing the job. These five minutes are the cheapest insurance in the entire tender.

ВходPriced billOriginal LVРезултатValidation reportFindings cleared
6

Export the Angebotsabgabe as X84

GAEB обмен

Switch to the Export tab, pick the priced bill and choose the X84 format. What you get back is the Angebotsabgabe: your Bieter details, a unit price and a total on each position, and the offer totals, all on the same Ordnungszahl you were sent.

Защо: X84 is the exchange phase the client's software expects an offer to arrive in. Returning the numbering they issued means your prices load straight into their Preisspiegel instead of being retyped or set aside.

ВходValidated priced billBidder detailsРезултатGAEB X84 HauptangebotOffer totals
7

Submit the Angebot and log what went out

Предавания

Assemble the X84 with the signed tender forms and any Nebenangebot the tender allows into one submission, issue it before the Angebotsfrist, and keep the record of what went out, to whom and when.

Екранна снимка, стъпка 7: Submit the Angebot and log what went out (Предавания, Спечелете търг по GAEB - от LV до Angebot)
Предавания: Submit the Angebot and log what went out

Защо: A strong price inside an incomplete or late submission is not a price, it is an exclusion. The dated record of what you sent is also the starting point for any Nachtrag discussion once you win.

ВходGAEB X84 HauptangebotSigned tender formsРезултатSubmitted AngebotSubmission record
Модули

Модули в този наръчник

6 / 190 модула на платформата

The market this case is written for

Германия

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Още в Търгове и доставки

Търгове и доставки

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 стъпки12 минОтвори
Търгове и доставки

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 стъпки10 минОтвори
Търгове и доставки

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 стъпки12 минОтвори