M-29 양식으로 자재를 정산하기

그 달에 실제로 완료된 작업에 대한 품셈 소요량을 가져와 자재창고가 실제로 불출한 양과 대조하고, 허용된 손실과 실제 초과를 구분하고, 초과분마다 서면 소명을 받고, 누계 항목으로 그 달을 마감한다.

7단계14 분종합건설사전문건설사

작동 방식, 단계별로

플랫폼 전반에 걸친 7단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Take the norm consumption for the work you are reporting

품셈

For each position in the report, take the material consumption the norm fixes per unit of measure, and note which material the norm actually names, because anything substituted on site has to be converted to the normed material before it can be compared at all.

이유: The first section of M-29 is the normative requirement, and it is derived rather than stated: the quantity of work multiplied by the norm per unit. Taking it from the norm instead of from last month's figure is the whole reason the comparison means anything.

입력Positions in the reportNorm consumption per unit결과Normative requirementSubstituted materials converted
2

Separate the losses the norm allows from real overrun

할증률

Set the allowance for trimming, offcuts, breakage and transport loss for each material, so the difference between what was purchased and what was built into the work reads as a known figure rather than as an unexplained gap.

스크린샷, 2단계: Separate the losses the norm allows from real overrun (할증률, M-29 양식으로 자재를 정산하기)
할증률: Separate the losses the norm allows from real overrun

이유: Part of the difference between norm and actual is not overrun: it is loss the norm already contemplates or that the delivered form of the material imposes. Mixing the two makes every position look like a problem, and a report in which everything is a problem stops being read.

입력Materials in scopeDelivery and cutting form결과Allowed loss per materialPurchase quantity explained
3

Fix the volume of work the month actually completed

진척

Record the quantity of each type of work completed in the reporting month, measured in the same units and by the same rule the smeta uses, because this quantity is what the whole normative requirement is calculated from.

스크린샷, 3단계: Fix the volume of work the month actually completed (진척, M-29 양식으로 자재를 정산하기)
진척: Fix the volume of work the month actually completed

이유: M-29 compares consumption against the norm for the work done, not for the work planned. An overstated volume hides a material overrun completely, which is exactly why the same measurement has to feed both the KS-2 act and this report rather than being produced twice.

입력Measurement on siteUnits the smeta uses결과Volume completed this monthSame figure as the acceptance act
4

Record what was really issued and consumed

현장 재고

Book the deliveries in, the issues out against each work position and the returns, then close the month with a physical stock check, so consumption means what left the store for that work rather than what was bought during the month.

스크린샷, 4단계: Record what was really issued and consumed (현장 재고, M-29 양식으로 자재를 정산하기)
현장 재고: Record what was really issued and consumed

이유: Purchased is not consumed. Material standing on site at the end of the month belongs to the next report, and treating a delivery as consumption produces an alarming overrun in one month and an impossible saving in the following one, which is how the report loses its credibility.

입력Deliveries booked inIssues to each position결과Actual consumptionClosing stock counted
5

Compare actual against norm position by position

사후 원가계산

Set the actual consumption against the normative requirement for each material and each position: the post-calculation reads the material money the estimate allowed against what the store issued for the quantity installed, line by line, and the stock ledger behind it gives the physical difference per material. Sort the result by money rather than by percentage.

스크린샷, 5단계: Compare actual against norm position by position (사후 원가계산, M-29 양식으로 자재를 정산하기)
사후 원가계산: Compare actual against norm position by position

이유: The second section of M-29 is exactly this comparison, and its value lies in being read by position. One concrete or reinforcement line can carry more overrun in roubles than every other position together, while a cheap material with a dramatic percentage swing costs almost nothing and pulls the whole discussion away from where the money went.

입력Normative requirementActual consumption결과Variance per positionVariance in money
6

Get every overrun explained and signed for

승인 경로

Route each overrun above the agreed threshold to the person who has to explain it, with the reason written down, and on to the person who has to accept or refuse that explanation. Keep the refused ones visible rather than closing them.

스크린샷, 6단계: Get every overrun explained and signed for (승인 경로, M-29 양식으로 자재를 정산하기)
승인 경로: Get every overrun explained and signed for

이유: An overrun on M-29 is not written off by the site that caused it. The form is drawn up by the site manager, checked by the production and technical department and approved by the chief engineer, and that approval is what turns a number into either an accepted cost or a matter for recovery. Without a route, the explanation is a corridor conversation that nobody can produce six months later.

입력Overruns above thresholdWritten reason from the site결과Accepted explanationsRejected and referred on
7

Close the month with the cumulative position

보고서

Issue the report with both sections, the normative requirement and the comparison against actual, with the explanations attached, and show the position from the start of the job next to the position for the month.

스크린샷, 7단계: Close the month with the cumulative position (보고서, M-29 양식으로 자재를 정산하기)
보고서: Close the month with the cumulative position

이유: A single month is noise, the cumulative line is the finding. A position running three percent over every month for six months is invisible monthly and unmistakable cumulatively, and that cumulative figure is also what reconciles against the material cost the estimate budgeted in the first place.

입력Variance with explanationsPosition from previous months결과Signed report for the monthCumulative position
모듈

이 플레이북의 모듈

플랫폼 190개 모듈 중 7개

The market this case is written for

러시아

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

현장 및 작업 카테고리의 더 보기

현장 및 작업

현장 일일 업무 진행

하루를 제대로 마무리합니다. 작업일지를 기록하고, 노무 및 장비 시간을 등록하고, 사진을 업로드하고, 안전 관찰 사항을 기록하여 그날의 기록이 나중에 근거로 활용될…

4단계9 분열기
현장 및 작업

RFI 답변하기

현장에서 나온 질문을 추적 가능한 요청으로 전환하고, 답변 책임자에게 전달하여, 회신 내용을 기록으로 남깁니다.

3단계9 분열기
현장 및 작업

실비정산(데이워크) 및 시간자재 기록

지시된 추가 작업을 지급받는 클레임으로 전환합니다: 발생 즉시 노무, 장비, 자재를 기록하고, 당일 시트에 서명을 받은 뒤 계약에 따라 제출합니다.

3단계9 분열기