ケース / 現場と作業
現場と作業

M-29 様式で材料を照合する

その月に実際に完了した作業に対する歩掛り消費量を取り、資材倉庫が実際に払い出した量と突き合わせ、許容される損耗と実際の超過を切り分け、超過分ごとに書面での説明を得て、累計値でその月を締める。

7ステップ14 分総合建設会社専門工事業者

仕組みをステップごとに

プラットフォーム全体で7ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Take the norm consumption for the work you are reporting

歩掛

For each position in the report, take the material consumption the norm fixes per unit of measure, and note which material the norm actually names, because anything substituted on site has to be converted to the normed material before it can be compared at all.

理由: The first section of M-29 is the normative requirement, and it is derived rather than stated: the quantity of work multiplied by the norm per unit. Taking it from the norm instead of from last month's figure is the whole reason the comparison means anything.

入力Positions in the reportNorm consumption per unit出力Normative requirementSubstituted materials converted
2

Separate the losses the norm allows from real overrun

ロス率

Set the allowance for trimming, offcuts, breakage and transport loss for each material, so the difference between what was purchased and what was built into the work reads as a known figure rather than as an unexplained gap.

スクリーンショット、ステップ 2: Separate the losses the norm allows from real overrun (ロス率, M-29 様式で材料を照合する)
ロス率: Separate the losses the norm allows from real overrun

理由: Part of the difference between norm and actual is not overrun: it is loss the norm already contemplates or that the delivered form of the material imposes. Mixing the two makes every position look like a problem, and a report in which everything is a problem stops being read.

入力Materials in scopeDelivery and cutting form出力Allowed loss per materialPurchase quantity explained
3

Fix the volume of work the month actually completed

進捗

Record the quantity of each type of work completed in the reporting month, measured in the same units and by the same rule the smeta uses, because this quantity is what the whole normative requirement is calculated from.

スクリーンショット、ステップ 3: Fix the volume of work the month actually completed (進捗, M-29 様式で材料を照合する)
進捗: Fix the volume of work the month actually completed

理由: M-29 compares consumption against the norm for the work done, not for the work planned. An overstated volume hides a material overrun completely, which is exactly why the same measurement has to feed both the KS-2 act and this report rather than being produced twice.

入力Measurement on siteUnits the smeta uses出力Volume completed this monthSame figure as the acceptance act
4

Record what was really issued and consumed

現場在庫

Book the deliveries in, the issues out against each work position and the returns, then close the month with a physical stock check, so consumption means what left the store for that work rather than what was bought during the month.

スクリーンショット、ステップ 4: Record what was really issued and consumed (現場在庫, M-29 様式で材料を照合する)
現場在庫: Record what was really issued and consumed

理由: Purchased is not consumed. Material standing on site at the end of the month belongs to the next report, and treating a delivery as consumption produces an alarming overrun in one month and an impossible saving in the following one, which is how the report loses its credibility.

入力Deliveries booked inIssues to each position出力Actual consumptionClosing stock counted
5

Compare actual against norm position by position

実行原価計算

Set the actual consumption against the normative requirement for each material and each position: the post-calculation reads the material money the estimate allowed against what the store issued for the quantity installed, line by line, and the stock ledger behind it gives the physical difference per material. Sort the result by money rather than by percentage.

スクリーンショット、ステップ 5: Compare actual against norm position by position (実行原価計算, M-29 様式で材料を照合する)
実行原価計算: Compare actual against norm position by position

理由: The second section of M-29 is exactly this comparison, and its value lies in being read by position. One concrete or reinforcement line can carry more overrun in roubles than every other position together, while a cheap material with a dramatic percentage swing costs almost nothing and pulls the whole discussion away from where the money went.

入力Normative requirementActual consumption出力Variance per positionVariance in money
6

Get every overrun explained and signed for

承認ルート

Route each overrun above the agreed threshold to the person who has to explain it, with the reason written down, and on to the person who has to accept or refuse that explanation. Keep the refused ones visible rather than closing them.

スクリーンショット、ステップ 6: Get every overrun explained and signed for (承認ルート, M-29 様式で材料を照合する)
承認ルート: Get every overrun explained and signed for

理由: An overrun on M-29 is not written off by the site that caused it. The form is drawn up by the site manager, checked by the production and technical department and approved by the chief engineer, and that approval is what turns a number into either an accepted cost or a matter for recovery. Without a route, the explanation is a corridor conversation that nobody can produce six months later.

入力Overruns above thresholdWritten reason from the site出力Accepted explanationsRejected and referred on
7

Close the month with the cumulative position

レポート

Issue the report with both sections, the normative requirement and the comparison against actual, with the explanations attached, and show the position from the start of the job next to the position for the month.

スクリーンショット、ステップ 7: Close the month with the cumulative position (レポート, M-29 様式で材料を照合する)
レポート: Close the month with the cumulative position

理由: A single month is noise, the cumulative line is the finding. A position running three percent over every month for six months is invisible monthly and unmistakable cumulatively, and that cumulative figure is also what reconciles against the material cost the estimate budgeted in the first place.

入力Variance with explanationsPosition from previous months出力Signed report for the monthCumulative position
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 7 個

The market this case is written for

ロシア

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GESN/FER
  • KS-2 / KS-3

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

現場と作業の他のケース

現場と作業

現場の一日を運用する

一日をきちんと締めくくる。日報を記録し、労務・機械の稼働時間を計上し、写真をアップロードし、安全に関する所見を記録する。そうすることで、その日が根拠にできる証拠として残る。

4ステップ9 分開く
現場と作業

RFIに回答する

現場からの疑問を追跡可能な依頼に変換し、回答の責任者まで確実に届け、記録として残るように回答をファイルします。

3ステップ9 分開く