Тохиолдлууд / Төсөв ба өртөг
Төсөв ба өртөг

IS 1200-д нийцүүлж хэмжиж, нэхэмжлэхийг шалгах боломжтой болгох

Зурагнаас тоо хэмжээг Энэтхэгийн хэмжилтийн аргаар аваад, нэгжийг метрийн, хүлээн зөвшөөрөгдсөн байлгаж, нөгөө тал нийт дүнгээр маргахын оронд мөр бүрээр давтан гаргаж болохуйц хэмжилтийг гаргана.

5 алхам18 минМэргэшсэн дэд гүйцэтгэгчЕрөнхий гүйцэтгэгчӨртгийн зөвлөгөө / QS

Хэрхэн ажилладаг, алхам алхмаар

Платформ даяар 5 алхам - алхам бүрт юу хийх, яагаад чухал болохыг.

1

Take the dimensions off the drawing, on the drawing

PDF хэмжилт

Calibrate the sheet against a stated dimension, then measure lengths, areas and counts directly on it, keeping each measurement attached to the place it was taken from. Work in metres and millimetres throughout.

Яагаад: A measurement that lives on the drawing can be re-opened and re-checked at the exact spot it came from. A measurement that lives only in a spreadsheet cell has to be re-taken from scratch by anyone who doubts it, which is how a query about one wall becomes a re-measure of a floor.

ОролтDrawings for the workA known scale or a dimension to set itҮр дүнMeasurements on the drawingEach figure traceable to where it was taken
2

Turn dimensions into quantities the standard way

Тоо хэмжээ авах

Build the quantity register trade by trade, applying the deduction and inclusion rules the method of measurement sets for each: openings in masonry and plaster, the treatment of the working space in excavation, how reinforcement is measured against how it is placed. Keep the deduction on the register rather than folded into a net figure.

Дэлгэцийн зураг, 2-р алхам: Turn dimensions into quantities the standard way (Тоо хэмжээ авах, IS 1200-д нийцүүлж хэмжиж, нэхэмжлэхийг шалгах боломжтой болгох)
Тоо хэмжээ авах: Turn dimensions into quantities the standard way

Яагаад: The deductions are where two honest takeoffs separate, so they are exactly what a checker wants to see. A register that shows gross, deduction and net can be agreed in one pass; one that shows only net invites a full re-measure to find out why it is short.

ОролтRaw dimensions from the drawingҮр дүнQuantities on the standard methodDeductions applied and visible
3

Post the quantities onto the bill items they belong to

Ажил материалын жагсаалт

Move the measured quantities onto the bill, matching each to the item whose description covers the work actually measured, and splitting a measurement across two items rather than stretching one description to cover both.

Дэлгэцийн зураг, 3-р алхам: Post the quantities onto the bill items they belong to (Ажил материалын жагсаалт, IS 1200-д нийцүүлж хэмжиж, нэхэмжлэхийг шалгах боломжтой болгох)
Ажил материалын жагсаалт: Post the quantities onto the bill items they belong to

Яагаад: An item description and a method of measurement are a pair: the description says what the rate includes and the method says how the quantity was arrived at. Posting a quantity under a description that does not cover it breaks the pair quietly, and the error surfaces at valuation as a rate that seems wrong.

ОролтThe quantity registerҮр дүнBill items with their quantities
4

Check the units before anybody prices them

Шалгалт

Validate the bill and read what comes back about units. The India pack ships a rule that asks for a unit the method of measurement recognises, and metric only, so an imperial leftover or an invented unit is reported rather than priced.

Дэлгэцийн зураг, 4-р алхам: Check the units before anybody prices them (Шалгалт, IS 1200-д нийцүүлж хэмжиж, нэхэмжлэхийг шалгах боломжтой болгох)
Шалгалт: Check the units before anybody prices them

Яагаад: A wrong unit does not look wrong. It looks like a rate that is out by a factor, and it is usually blamed on the rate. Catching it as a unit finding names the actual defect and fixes one line instead of re-arguing a trade.

ОролтThe measured billҮр дүнUnits the method does not recognise
5

Issue the measurement in a form the other side can re-do

Тайлан

Produce the measurement sheet showing item, dimensions, deductions, unit and quantity, and send that rather than a single total per trade.

Дэлгэцийн зураг, 5-р алхам: Issue the measurement in a form the other side can re-do (Тайлан, IS 1200-д нийцүүлж хэмжиж, нэхэмжлэхийг шалгах боломжтой болгох)
Тайлан: Issue the measurement in a form the other side can re-do

Яагаад: Agreement is reached at the line that differs, and only a sheet that shows lines has one. Sending a total asks the other party to trust you, which on a running account nobody does twice.

ОролтThe checked measurementҮр дүнA measurement sheet the other side can reproduce
Модулиуд

Энэ тоглолтын модулиуд

Платформын 190 модулиас 5

The market this case is written for

Энэтхэг

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CPWD DSR
  • IS 456
  • RERA

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Төсөв ба өртөг дахь бусад

Төсөв ба өртөг

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 алхам8 минНээх
Төсөв ба өртөг

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 алхам12 минНээх
Төсөв ба өртөг

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 алхам11 минНээх