کیسز / تخمینہ سازی اور لاگت
تخمینہ سازی اور لاگت

IS 1200 کے مطابق ناپیں تاکہ بل چیک کیا جا سکے

مقداریں ڈرائنگ سے اس طرح لیں جس طرح انڈین طریقہ پیمائش بتاتا ہے، units کو metric اور تسلیم شدہ رکھیں، اور ایک ایسی پیمائش جاری کریں جسے دوسرا فریق کل پر تنازع کرنے کی بجائے لائن بہ لائن دوبارہ بنا سکے۔

5 مراحل18 منٹخصوصی سب کنٹریکٹرجنرل کنٹریکٹرکاسٹ کنسلٹنسی / QS فرم

یہ کیسے کام کرتا ہے، قدم بہ قدم

5 قدم پوری پلیٹ فارم میں - ہر قدم پر کیا کرنا ہے اور یہ کیوں اہم ہے۔

1

Take the dimensions off the drawing, on the drawing

PDF پیمائشیں

Calibrate the sheet against a stated dimension, then measure lengths, areas and counts directly on it, keeping each measurement attached to the place it was taken from. Work in metres and millimetres throughout.

کیوں: A measurement that lives on the drawing can be re-opened and re-checked at the exact spot it came from. A measurement that lives only in a spreadsheet cell has to be re-taken from scratch by anyone who doubts it, which is how a query about one wall becomes a re-measure of a floor.

اندر جاتا ہےDrawings for the workA known scale or a dimension to set itباہر آتا ہےMeasurements on the drawingEach figure traceable to where it was taken
2

Turn dimensions into quantities the standard way

مقدار پیمائش

Build the quantity register trade by trade, applying the deduction and inclusion rules the method of measurement sets for each: openings in masonry and plaster, the treatment of the working space in excavation, how reinforcement is measured against how it is placed. Keep the deduction on the register rather than folded into a net figure.

کیوں: The deductions are where two honest takeoffs separate, so they are exactly what a checker wants to see. A register that shows gross, deduction and net can be agreed in one pass; one that shows only net invites a full re-measure to find out why it is short.

اندر جاتا ہےRaw dimensions from the drawingباہر آتا ہےQuantities on the standard methodDeductions applied and visible
3

Post the quantities onto the bill items they belong to

مقدار کا بل (BOQ)

Move the measured quantities onto the bill, matching each to the item whose description covers the work actually measured, and splitting a measurement across two items rather than stretching one description to cover both.

کیوں: An item description and a method of measurement are a pair: the description says what the rate includes and the method says how the quantity was arrived at. Posting a quantity under a description that does not cover it breaks the pair quietly, and the error surfaces at valuation as a rate that seems wrong.

اندر جاتا ہےThe quantity registerباہر آتا ہےBill items with their quantities
4

Check the units before anybody prices them

تصدیق

Validate the bill and read what comes back about units. The India pack ships a rule that asks for a unit the method of measurement recognises, and metric only, so an imperial leftover or an invented unit is reported rather than priced.

کیوں: A wrong unit does not look wrong. It looks like a rate that is out by a factor, and it is usually blamed on the rate. Catching it as a unit finding names the actual defect and fixes one line instead of re-arguing a trade.

اندر جاتا ہےThe measured billباہر آتا ہےUnits the method does not recognise
5

Issue the measurement in a form the other side can re-do

رپورٹس

Produce the measurement sheet showing item, dimensions, deductions, unit and quantity, and send that rather than a single total per trade.

کیوں: Agreement is reached at the line that differs, and only a sheet that shows lines has one. Sending a total asks the other party to trust you, which on a running account nobody does twice.

اندر جاتا ہےThe checked measurementباہر آتا ہےA measurement sheet the other side can reproduce
ماڈیولز

اس سیناریو کے ماڈیولز

5 / 190 پلیٹ فارم ماڈیولز

The market this case is written for

بھارت

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CPWD DSR
  • IS 456
  • RERA

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

تخمینہ سازی اور لاگت میں مزید

تخمینہ سازی اور لاگت

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 مراحل8 منٹکھولیں
تخمینہ سازی اور لاگت

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 مراحل12 منٹکھولیں
تخمینہ سازی اور لاگت

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 مراحل11 منٹکھولیں