Hakediş kontrol edilebilsin diye IS 1200'e göre ölçün

Miktarları Hint ölçüm yönteminin belirttiği şekilde çizimden alın, birimleri metrik ve tanınan birimlerde tutun ve karşı tarafın toplamda itiraz etmek yerine satır satır tekrarlayabileceği bir ölçüm yayımlayın.

5 adım18 dkUzman taşeronAna yükleniciMaliyet danışmanlığı / QS

Nasıl çalışır, adım adım

Platform genelinde 5 adım - her birinde ne yapacağınız ve neden önemli olduğu.

1

Take the dimensions off the drawing, on the drawing

PDF Ölçümler

Calibrate the sheet against a stated dimension, then measure lengths, areas and counts directly on it, keeping each measurement attached to the place it was taken from. Work in metres and millimetres throughout.

Neden: A measurement that lives on the drawing can be re-opened and re-checked at the exact spot it came from. A measurement that lives only in a spreadsheet cell has to be re-taken from scratch by anyone who doubts it, which is how a query about one wall becomes a re-measure of a floor.

GirdiDrawings for the workA known scale or a dimension to set itÇıktıMeasurements on the drawingEach figure traceable to where it was taken
2

Turn dimensions into quantities the standard way

Metraj

Build the quantity register trade by trade, applying the deduction and inclusion rules the method of measurement sets for each: openings in masonry and plaster, the treatment of the working space in excavation, how reinforcement is measured against how it is placed. Keep the deduction on the register rather than folded into a net figure.

Ekran görüntüsü, adım 2: Turn dimensions into quantities the standard way (Metraj, Hakediş kontrol edilebilsin diye IS 1200'e göre ölçün)
Metraj: Turn dimensions into quantities the standard way

Neden: The deductions are where two honest takeoffs separate, so they are exactly what a checker wants to see. A register that shows gross, deduction and net can be agreed in one pass; one that shows only net invites a full re-measure to find out why it is short.

GirdiRaw dimensions from the drawingÇıktıQuantities on the standard methodDeductions applied and visible
3

Post the quantities onto the bill items they belong to

Keşif Özeti

Move the measured quantities onto the bill, matching each to the item whose description covers the work actually measured, and splitting a measurement across two items rather than stretching one description to cover both.

Ekran görüntüsü, adım 3: Post the quantities onto the bill items they belong to (Keşif Özeti, Hakediş kontrol edilebilsin diye IS 1200'e göre ölçün)
Keşif Özeti: Post the quantities onto the bill items they belong to

Neden: An item description and a method of measurement are a pair: the description says what the rate includes and the method says how the quantity was arrived at. Posting a quantity under a description that does not cover it breaks the pair quietly, and the error surfaces at valuation as a rate that seems wrong.

GirdiThe quantity registerÇıktıBill items with their quantities
4

Check the units before anybody prices them

Doğrulama

Validate the bill and read what comes back about units. The India pack ships a rule that asks for a unit the method of measurement recognises, and metric only, so an imperial leftover or an invented unit is reported rather than priced.

Ekran görüntüsü, adım 4: Check the units before anybody prices them (Doğrulama, Hakediş kontrol edilebilsin diye IS 1200'e göre ölçün)
Doğrulama: Check the units before anybody prices them

Neden: A wrong unit does not look wrong. It looks like a rate that is out by a factor, and it is usually blamed on the rate. Catching it as a unit finding names the actual defect and fixes one line instead of re-arguing a trade.

GirdiThe measured billÇıktıUnits the method does not recognise
5

Issue the measurement in a form the other side can re-do

Raporlar

Produce the measurement sheet showing item, dimensions, deductions, unit and quantity, and send that rather than a single total per trade.

Ekran görüntüsü, adım 5: Issue the measurement in a form the other side can re-do (Raporlar, Hakediş kontrol edilebilsin diye IS 1200'e göre ölçün)
Raporlar: Issue the measurement in a form the other side can re-do

Neden: Agreement is reached at the line that differs, and only a sheet that shows lines has one. Sending a total asks the other party to trust you, which on a running account nobody does twice.

GirdiThe checked measurementÇıktıA measurement sheet the other side can reproduce
Modüller

Bu senaryodaki modüller

5 / 190 platform modülü

The market this case is written for

Hindistan

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CPWD DSR
  • IS 456
  • RERA

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Keşif ve maliyet kategorisinde daha fazlası

Keşif ve maliyet

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 adım12 dkAç
Keşif ve maliyet

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 adım11 dkAç