Fall / Kommersiellt och kontrakt
Kommersiellt och kontrakt

Betala en underentreprenör utan att ärva deras skatteproblem

Registrera varje underentreprenörs skattestatus och de intyg de bär, låt förfallodatumen komma till dig i stället för att sökas upp, dra av på den bas som systemet anger, och betala saldot med registret redan bakom det.

5 steg16 minGeneralentreprenörSpecialunderentreprenörProjekt- / byggledningsföretagÄgare / förvaltare (FM)

Så fungerar det, steg för steg

5 steg genom plattformen - vad du gör i varje och varför det spelar roll.

1

Record what the sub's standing actually is, not what you assume

Källskatt

Register each subcontractor against the withholding scheme with the band their evidence supports, the reference of the signed form and the date it was given. The band is what decides the rate, so it is the field to get right rather than a note in the file.

Varför: The scheme's default band is the one that deducts. That is the part people are caught by: an unrecorded sub is not an open question the system will ask you about later, they are already at the full rate. Recording the standing while somebody is onboarding them costs a minute. Establishing it on payment day costs the payment.

IndataThe subcontractor and the scheme that appliesThe signed form on file, and its dateResultatThe band their evidence supportsThe rate that will be deducted
2

Put the certificates on the register with the day they lapse

Underentreprenörsregister

Record what each subcontractor carries and when it runs out. General liability, workers compensation, auto and umbrella are separate policies with separate dates, and so are payment, performance and bid bonds, so they are recorded separately rather than as one tick for insurance.

Skärmbild, steg 2: Put the certificates on the register with the day they lapse (Underentreprenörsregister, Betala en underentreprenör utan att ärva deras skatteproblem)
Underentreprenörsregister: Put the certificates on the register with the day they lapse

Varför: A certificate never fails loudly. It lapses on a date, and the first person to notice is usually the one who needed it: the adjuster after an incident, or whoever is signing the pay run. Filing one date per policy is what turns that from a discovery into a reminder.

IndataInsurance certificates, bonds, licencesThe expiry date each one carriesResultatCover recorded per subcontractorWho is covered today, at a glance
3

Let the dates come to you instead of being looked for

Tidsfrister

Watch the recorded dates with a warning window wide enough to chase a renewal, so a policy about to run out appears next to everything else the job owes a date, rather than in a folder somebody has to remember to open.

Skärmbild, steg 3: Let the dates come to you instead of being looked for (Tidsfrister, Betala en underentreprenör utan att ärva deras skatteproblem)
Tidsfrister: Let the dates come to you instead of being looked for

Varför: An expired certificate is not a closed item, it is the most urgent open one, and a list that treats it as finished is worse than no list. The point of the window is to move the work from the twenty-fifth of the month to a day when a phone call is still enough.

IndataRecorded expiry datesHow much warning you wantResultatWhat lapses before the next pay runWhat has already lapsed
4

Deduct on the base the scheme names, not on the invoice total

Källskatt

Take the gross for the period, set aside whatever the scheme leaves out of the base, apply the band the sub's standing puts them in, and record the deduction against the payment. When it is remitted, keep the reference on the same record.

Varför: Two things get confused here and both cost money. The base is not the invoice total, and different schemes leave different parts out of it. And this is not retainage: what is deducted goes to the authority, the subcontractor reclaims it through their own return, and it does not come back from you. Telling a sub you are holding it is the fastest way to a dispute over money you no longer have.

IndataThe gross payment for the periodWhat within it is not part of the baseResultatThe taxable base and the amount deductedRemittance recorded with its reference
5

Pay the balance with the record already behind it

Ekonomi

Release the payment showing the gross, the deduction and the net as separate figures rather than as one adjusted number, so the sub can see what was taken and reclaim it without asking you to reconstruct it.

Skärmbild, steg 5: Pay the balance with the record already behind it (Ekonomi, Betala en underentreprenör utan att ärva deras skatteproblem)
Ekonomi: Pay the balance with the record already behind it

Varför: The question always comes back, and it comes back months later from somebody's accountant rather than from the person you dealt with. A payment that carries its own arithmetic is answered by opening it. A net figure with no working behind it is answered by a morning of somebody's time, every time it is asked.

IndataSubs cleared for paymentThe deduction for the periodResultatNet paid, with the deduction shownA record that answers the question later
Moduler

Moduler i denna playbook

4 / 190 plattformsmoduler

The market this case is written for

USA

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CSI MasterFormat
  • UniFormat II
  • AIA A201

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Mer inom Kommersiellt och kontrakt

Kommersiellt och kontrakt

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 steg11 minÖppna