ڈرائنگ کو کوڈڈ بل آئٹم میں ناپیں

ڈرائنگ پر ناپیں، مقدار کو ایک بل آئٹم پر لائیں، آئٹم کو اس کا GB 50500 کوڈ اور یہ کیا احاطہ کرتا ہے اس کی تفصیل دیں، اور بل بھیجنے سے پہلے کوڈز کی توثیق کریں۔

5 مراحل18 منٹجنرل کنٹریکٹرکاسٹ کنسلٹنسی / QS فرمخصوصی سب کنٹریکٹر

یہ کیسے کام کرتا ہے، قدم بہ قدم

5 قدم پوری پلیٹ فارم میں - ہر قدم پر کیا کرنا ہے اور یہ کیوں اہم ہے۔

1

Measure on the drawing, not off it

PDF پیمائشیں

Open the sheet, set the scale against a dimension printed on the drawing, and measure the areas, lengths and counts you need. The measurements stay on the sheet where they were taken.

کیوں: A measurement you can point at on the drawing is checkable by somebody else in a minute. The same number in a spreadsheet cell is only as good as the memory of whoever put it there, and on a revision it has to be redone from scratch because nobody can see what it covered.

اندر جاتا ہےDrawing setScale and reference dimensionباہر آتا ہےMeasurements on the sheetWhat was measured, visible
2

Gather the measurements into quantities

مقدار پیمائش

Group the measurements into the quantities the bill will actually carry, in the units the measurement rules give for each kind of work, and check the totals against anything you already know about the building.

کیوں: The unit is part of the measurement rule, not a formatting choice, and a quantity carried in the wrong one produces a rate that is wrong by a factor rather than by a margin. It is also the last cheap moment to notice that a floor is missing from the take-off.

اندر جاتا ہےMeasurements from the sheetsباہر آتا ہےQuantities grouped by workUnits the bill will use
3

Land the quantity on a coded bill item

مقدار کا بل (BOQ)

Put the quantity on a bill item under the right section and give the item its code. The national schedule gives nine digits; a project bill extends that with a three-digit sequence of its own, so a code of either length is what the bill ends up carrying.

کیوں: The code is the item's identity for the rest of the job. It is what lets a settlement bill be compared against a tender bill after both have been renumbered, and it is what lets two bidders' prices for the same work be set against each other at all.

اندر جاتا ہےThe measured quantityGB 50500 item scheduleباہر آتا ہےBill item with its code
4

Write the characteristics the rate has to cover

مقدار کا بل (BOQ)

Beside the code, write out what the item actually covers: grade, mix, thickness, finish, method, and anything about access or sequence that changes the price. It is free text, so it can say whatever the item needs it to say.

کیوں: The characteristics are what the code cannot carry, and they differ for every kind of work: what you must state for concrete is nothing like what you must state for windows. An item described in three words gets priced three different ways by three bidders, and the difference becomes yours to absorb at settlement.

اندر جاتا ہےSpecification and drawing notesباہر آتا ہےItem characteristics written downWhat the rate has to cover
5

Validate the codes, and know what the check does not do

تصدیق

Run validation on the bill. For a project in China the GB 50500 rules are selected for you: they find items carrying no code at all, and codes that are not a well-formed nine or twelve digits. If your bill form also has a code column of its own, make sure the code being checked is the one on the item rather than a second copy typed elsewhere.

کیوں: This checks the shape of the code, not whether that code exists in the national schedule, so a well-formed number nobody ever published passes. Read a clean run as having cleared the typing errors, and read the codes yourself for the ones that matter.

اندر جاتا ہےThe coded billباہر آتا ہےItems with no codeCodes of the wrong shape
ماڈیولز

اس سیناریو کے ماڈیولز

4 / 190 پلیٹ فارم ماڈیولز

The market this case is written for

چین

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

تخمینہ سازی اور لاگت میں مزید

تخمینہ سازی اور لاگت

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 مراحل8 منٹکھولیں
تخمینہ سازی اور لاگت

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 مراحل12 منٹکھولیں
تخمینہ سازی اور لاگت

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 مراحل11 منٹکھولیں