Chase every overdue date in one place

Pull every due date the platform tracks into a single register, see what is genuinely late rather than what feels late, let the sweep tell the owners, and turn the worst one into a task somebody owns.

3 个步骤9 分钟总承包商项目/施工管理公司开发商/业主

运作方式,逐步说明

贯穿平台的 3 个步骤 - 每一步做什么,以及为什么重要。

1

See what is actually late

截止日期

Open the deadline register and switch it to overdue. It gathers the dates each module already tracks, correspondence response deadlines, corrective actions off non-conformance reports, open punch items, and groups them by module with the days late on each, so you read one list instead of opening three.

原因: A project rarely slips in one obvious place. It slips a few days here and a week there, in registers nobody reads together, and by the time it is visible in the programme the reasons are two months old. One list turns a vague feeling that things are drifting into a count you can do something about this morning.

输入Due dates across modulesOverdue filter成果One overdue registerDays late on each item
2

Let the sweep tell the owners

截止日期

The overdue sweep runs across the same register and pushes a reminder to whoever owns each late item. Once an item has sat past the grace window it escalates to the project managers, once and only once, and the register shows you what it moved.

原因: Very little slips because somebody decided to ignore it. It slips because nobody told them it was theirs. Escalating on a grace window rather than on day one is what keeps the escalation worth reading, because a manager copied into everything reads none of it.

输入Overdue itemsOwners and managers成果Owners toldEscalations past the grace window
3

Turn the worst one into a tracked action

任务

Take the item sitting at the top of the overdue list and raise a task against it with a named owner and a date you actually believe. Work it until the underlying record closes, at which point the entry drops out of the register on its own.

原因: A reminder tells somebody a date has passed. It does not tell them what to do next, and the ones that have gone badly overdue are usually the ones where that is not obvious. The register only shortens when the source record closes, so the task has to point at the real work rather than at the reminder about it.

输入The worst overdue itemA named owner成果Task with an owner and a dateRegister entry cleared
模块

此方案使用的模块

184 个平台模块中的 2

更多 现场与作业 案例

现场与作业

收尾现场一天的工作

妥善收尾一天的工作:记录日志、登记人工和机械工时、上传照片并记录安全观察,让这一天以可依赖的证据形式留存下来。

4 个步骤9 分钟打开
现场与作业

答复一份RFI

将现场提出的问题转化为可跟踪的请求,推动到负责给出答复的一方,并将回复归档,使其成为项目记录的一部分。

3 个步骤9 分钟打开
现场与作业

记录计工计料与时间材料

把已下达指令的额外工作转化为能获得赔付的索赔:施工发生的同时记录人工、机械和材料,当天就取得签认,再依据合同提交。

3 个步骤9 分钟打开