案例 / 计划与控制
计划与控制

按 Hijri 历和公历同时管理合同日期

设定周日到周四的工作周和会移动的节假日,按合同所用的历法记录合同工期,规划斋月缩短的工时,登记每一个以 Hijri 日期计的到期日,并在双方都能核对的日期上结算延误。

7 个步骤14 分钟总承包商项目/施工管理公司开发商/业主专业分包商

运作方式,逐步说明

贯穿平台的 7 个步骤 - 每一步做什么,以及为什么重要。

1

Set the working week the site actually keeps

4D 进度

Set the project calendar to the Saudi working week, Sunday through Thursday with Friday and Saturday as the weekend, and record the normal working day at the Labour Law maximum of eight hours, or forty eight hours in the week, whichever standard the contract of employment adopts.

原因: A programme built on a Monday to Friday default is wrong twice a week, every week, and the error compounds silently into every float calculation and every completion date the programme produces. It also puts planned work on Fridays, which is the day it will not happen, so the first progress report reads as a delay that never occurred.

输入Project and its countryWorking hours agreed成果Work calendar setSunday to Thursday week
2

Put the holidays that move next to the ones that do not

高级进度计划

Load the public holidays for the programme years ahead. Founding Day on 22 February and National Day on 23 September are fixed Gregorian dates. Eid al-Fitr and Eid al-Adha are Hijri and shift about eleven days earlier each Gregorian year, and the exact days off are confirmed close to the time, so plan the window and confirm the days rather than the other way round.

原因: A concrete pour or a shutdown planned into an Eid week is not a scheduling inconvenience, it is a crew that is not in the country. Because the Eids move, a programme copied from a job that ran two years earlier puts them in the wrong place, and the mistake is invisible until the week arrives.

输入Work calendarProgramme year成果Fixed national daysMoving Eid periods
3

Record the period in the calendar the contract uses

合同

Read the contract for how the period of performance is expressed, in Hijri months, in Gregorian months or in days, note which it is on the contract record, and compute the completion date from the commencement date on that basis. Show the same date in the other calendar beside it, marked as the conversion rather than as the term.

原因: This is where the disputes come from. Eighteen Hijri months and eighteen Gregorian months are more than a fortnight apart, and on a contract with liquidated damages a fortnight is a number. Naming the calendar the contract chose, once, means the completion date is computed rather than negotiated, and the conversion stays visible as a convenience for the reader instead of quietly becoming the obligation.

输入Signed contractCommencement date成果Contract calendar namedCompletion date in both
4

Plan Ramadan at the hours the law allows

资源与人员

Set the crews to the Ramadan working day and replan the month's output on it. Article 98 of the Labour Law reduces actual working hours during Ramadan for Muslim workers to six a day, or thirty six a week, against the normal eight and forty eight, and most sites apply the reduced day to everyone rather than run two rotas.

原因: A quarter of the working hours disappears for a month, and it is a statutory reduction rather than a productivity dip, so it belongs in the plan rather than in the excuses. A programme that carries eight hour days through Ramadan is not optimistic, it is arithmetically impossible, and the recovery plan written in the following month is paying for a decision made a year earlier.

输入Crews and shiftsRamadan window成果Reduced hours appliedOutput replanned
5

Register every expiry with the calendar it is written in

截止日期

Put the guarantees, the insurances, the classification and commercial registration certificates, the municipal permits and the residence permits of the staff on one register, each with its expiry and a note saying whether that expiry was written in Hijri or in Gregorian, and set the reminder far enough ahead to renew rather than to react.

原因: Almost every instrument on that list has teeth and none of them warn you. A residence permit that lapses stops a man working, a lapsed guarantee can cost the contract, and a bank guarantee written for twelve Hijri months expires eleven days before the anniversary somebody has in their diary. The register is not paperwork, it is the only place the two calendars are reconciled once instead of forty times.

输入Guarantees, licences, permitsResidence and permit dates成果One expiry registerCalendar noted on each
6

Measure a delay against the calendar that was agreed

索赔证据

When an extension of time is claimed, count the delay in working days on the project calendar, with the weekends, the national days and the Eid closures the calendar already holds, and attach the diary entries and correspondence that show what happened on each of them.

原因: A claim counted in calendar days and answered in working days is two parties disagreeing about arithmetic while believing they disagree about the facts. Counting on the calendar both signed up to removes that argument entirely and leaves the real one, which is whether the event was the employer's risk.

输入Site records and diariesAgreed work calendar成果Delay measured in working daysEvidence pack
7

Report dates the client reads the same way you do

报告

Publish the period report with the contract completion date, the forecast completion and the remaining float, each shown in the calendar the contract uses, and the conversion given alongside where the audience needs it.

原因: A monthly report is where a date error gets ratified. Print the completion date in one calendar for a year and both parties stop checking it, and the correction, when it comes, arrives with a claim attached. Showing the contract calendar first and the conversion second keeps the obligation and the convenience clearly apart.

输入Progress this periodContract and programme dates成果Report both sides can readForecast completion
模块

此方案使用的模块

190 个平台模块中的 7

The market this case is written for

沙特阿拉伯

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • Saudi Building Code
  • Government Tenders and Procurement Law

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

更多 计划与控制 案例

计划与控制

建立项目并完成移交

带领一个项目从最初的建立一路走到交付。创建项目、为工程定价、编制进度计划、在现场跟踪进度,最后干净利落地收尾。全生命周期共五步。

5 个步骤20 分钟打开
计划与控制

建立基线并跟踪进度

编制施工计划,冻结基线作为衡量依据,反馈现场的实际进度,并读取偏差,使延误尽早暴露。

4 个步骤12 分钟打开
计划与控制

挣值分析与预测

了解项目相对计划和预算的真实进度:更新总进度计划,读取CPI和SPI,对最终成本和竣工日期给出可信的预测数字。

3 个步骤13 分钟打开