Případy / Kvalita a bezpečnost
Kvalita a bezpečnost

Podávat regulated designs podle Design and Building Practitioners Act

Rozhodněte, které výkresy jsou regulated designs, ověřte, že je každý practitioner registrován pro třídu práce, kterou deklaruje, shromážděte construction issued designs a jejich compliance declarations, podejte je dřív, než stavební práce začnou, zachyťte změnu na stavbě, která vytváří nový regulated design, a uzavřete deklarací, na níž závisí occupation certificate.

7 kroků18 minGenerální dodavatelProjekční / inženýrská kancelářDeveloper / klientProjektová / stavební manažerská firma

Jak to funguje, krok za krokem

7 kroků napříč platformou - co na každém uděláte a proč na tom záleží.

1

Decide which designs are regulated designs

Kontrola úřadu

Work through the design register and mark which documents are regulated designs, the ones covering building elements the regulation names, such as fire safety systems, waterproofing, and the internal and external load bearing components, together with the performance solutions that support them. Name the practitioner who will declare each one.

Snímek obrazovky, krok 1: Decide which designs are regulated designs (Kontrola úřadu, Podávat regulated designs podle Design and Building Practitioners Act)
Kontrola úřadu: Decide which designs are regulated designs

Proč: The list decides the whole workflow, and it is drawn once at the start when it is cheap. A document identified as regulated three months into construction needs a declaration from a practitioner who may not have been engaged on that basis, at a price nobody budgeted, for work that is already built.

VstupDesign documents for the jobBuilding class and work typeVýstupList of regulated designsPractitioner responsible for each
2

Check the registration covers the class being declared

Oprávnění

Record each practitioner's registration, the classes of design work it authorises and its expiry, along with the professional indemnity cover the scheme requires. Check the registration against the class of the design they are being asked to declare, not simply that they hold one.

Snímek obrazovky, krok 2: Check the registration covers the class being declared (Oprávnění, Podávat regulated designs podle Design and Building Practitioners Act)
Oprávnění: Check the registration covers the class being declared

Proč: A declaration made by someone whose registration does not authorise that class of work is not a declaration, and the failure is invisible until it is checked. Registration also expires mid project, which turns a valid declaration into a problem on a date nobody was watching.

VstupDesign team engagedClasses of design workVýstupRegistration checked per classExpiry and insurance dates watched
3

Collect the construction issued designs and their revisions

Podání

Run the regulated designs through the submittal register so each one arrives with its revision, its date and the practitioner who prepared it, and so a design still outstanding is visible as an outstanding item rather than as an absence nobody noticed.

Snímek obrazovky, krok 3: Collect the construction issued designs and their revisions (Podání, Podávat regulated designs podle Design and Building Practitioners Act)
Podání: Collect the construction issued designs and their revisions

Proč: What is lodged has to be the version that will actually be built from, and a register that tracks revisions is the only thing that keeps those two the same document. A declaration attached to a superseded revision is worse than none, because it reads as compliance while describing a building nobody is constructing.

VstupConstruction issued drawingsList of regulated designsVýstupDesigns collected with revisionsMissing designs visible
4

Get a declaration for every regulated design

Elektronické podpisy

Collect a design compliance declaration signed by the registered design practitioner for each regulated design. Where a principal design practitioner has been appointed, they make the principal compliance declaration that the designs are covered and the declarations were made by practitioners authorised to make them.

Proč: The declaration is a personal statement by a named practitioner and it carries personal consequences, which is why it is chased rather than given. Collecting them as they are signed, against a list drawn at the start, is the difference between a routine administrative task and a search for six people at the end of a job.

VstupDesigns collected with revisionsRegistration checked per classVýstupDesign compliance declarationsPrincipal declaration where appointed
5

Lodge them before the work they cover starts

Předložení úřadům

Lodge the construction issued regulated designs and their declarations through the state planning portal before building work commences, and keep the lodgement receipts against the submission record so the date can be shown rather than remembered.

Snímek obrazovky, krok 5: Lodge them before the work they cover starts (Předložení úřadům, Podávat regulated designs podle Design and Building Practitioners Act)
Předložení úřadům: Lodge them before the work they cover starts

Proč: The obligation is tied to the start of the work rather than to a milestone anybody celebrates, so the deadline arrives while the site is mobilising and everyone is busy with something else. Lodging late is not curable by lodging afterwards, because the record shows when the work started.

VstupDesigns and declarationsPlanned start on siteVýstupLodged before work startsLodgement receipts on file
6

Treat a change on site as a new regulated design

Řízení kvality

Route every change that touches a regulated design back through the same loop, a varied regulated design, a fresh declaration from a registered practitioner and a lodgement, before the varied work is built. Keep the link between the change and the design it varied.

Snímek obrazovky, krok 6: Treat a change on site as a new regulated design (Řízení kvality, Podávat regulated designs podle Design and Building Practitioners Act)
Řízení kvality: Treat a change on site as a new regulated design

Proč: This is the step the regime is most often failed on, and it fails quietly. Work built to a marked up sketch is work with no declared design behind it, and nothing on site looks wrong; the gap appears at the end, when the building is finished and the only remedies are expensive.

VstupDesign change on siteWhat was lodged beforeVýstupVaried design declared againWhat was built matches what was declared
7

Close it out before the occupation certificate is applied for

Uzavření

Check the close-out register holds every regulated design, every declaration and every lodgement receipt, then have the registered building practitioner make the building compliance declaration that the work complies with the designs as declared.

Snímek obrazovky, krok 7: Close it out before the occupation certificate is applied for (Uzavření, Podávat regulated designs podle Design and Building Practitioners Act)
Uzavření: Close it out before the occupation certificate is applied for

Proč: The compliance declarations have to be in place before an application for an occupation certificate can be made, which means a single missing declaration holds up handover for a finished building. Every day of that is carrying cost on a project that has stopped earning.

VstupAll declarations lodgedBuilding work completeVýstupBuilding compliance declarationReady to apply for occupation
Moduly

Moduly v tomto playbooku

7 / 190 modulů platformy

The market this case is written for

Austrálie

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Více v kategorii Kvalita a bezpečnost

Kvalita a bezpečnost

Kontrola díla a uzavření neshody

Zkontrolujte dílo proti jeho přejímacím kritériím, ve chvíli, kdy neprojde, založte neshodu,…

3 kroků10 minOtevřít