Afgør hvilke tegninger der er regulated designs, kontrollér at hver practitioner er registreret til den klasse arbejde de erklærer, saml de construction issued designs og deres compliance declarations, indgiv dem før byggearbejdet begynder, fang den pladsændring der skaber et nyt regulated design, og afslut med den erklæring occupation certificate afhænger af.

7 trin18 minHovedentreprenørProjekterings- / ingeniørfirmaUdvikler / bygherreProjekt- / byggeledelsesfirma

Sådan fungerer det, trin for trin

7 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Decide which designs are regulated designs

Gennemgå godkendelse

Work through the design register and mark which documents are regulated designs, the ones covering building elements the regulation names, such as fire safety systems, waterproofing, and the internal and external load bearing components, together with the performance solutions that support them. Name the practitioner who will declare each one.

Skærmbillede, trin 1: Decide which designs are regulated designs (Gennemgå godkendelse, Indgiv regulated designs under Design and Building Practitioners Act)
Gennemgå godkendelse: Decide which designs are regulated designs

Hvorfor: The list decides the whole workflow, and it is drawn once at the start when it is cheap. A document identified as regulated three months into construction needs a declaration from a practitioner who may not have been engaged on that basis, at a price nobody budgeted, for work that is already built.

InputDesign documents for the jobBuilding class and work typeResultatList of regulated designsPractitioner responsible for each
2

Check the registration covers the class being declared

Kvalifikationer

Record each practitioner's registration, the classes of design work it authorises and its expiry, along with the professional indemnity cover the scheme requires. Check the registration against the class of the design they are being asked to declare, not simply that they hold one.

Skærmbillede, trin 2: Check the registration covers the class being declared (Kvalifikationer, Indgiv regulated designs under Design and Building Practitioners Act)
Kvalifikationer: Check the registration covers the class being declared

Hvorfor: A declaration made by someone whose registration does not authorise that class of work is not a declaration, and the failure is invisible until it is checked. Registration also expires mid project, which turns a valid declaration into a problem on a date nobody was watching.

InputDesign team engagedClasses of design workResultatRegistration checked per classExpiry and insurance dates watched
3

Collect the construction issued designs and their revisions

Indsendelser

Run the regulated designs through the submittal register so each one arrives with its revision, its date and the practitioner who prepared it, and so a design still outstanding is visible as an outstanding item rather than as an absence nobody noticed.

Skærmbillede, trin 3: Collect the construction issued designs and their revisions (Indsendelser, Indgiv regulated designs under Design and Building Practitioners Act)
Indsendelser: Collect the construction issued designs and their revisions

Hvorfor: What is lodged has to be the version that will actually be built from, and a register that tracks revisions is the only thing that keeps those two the same document. A declaration attached to a superseded revision is worse than none, because it reads as compliance while describing a building nobody is constructing.

InputConstruction issued drawingsList of regulated designsResultatDesigns collected with revisionsMissing designs visible
4

Get a declaration for every regulated design

E-signaturer

Collect a design compliance declaration signed by the registered design practitioner for each regulated design. Where a principal design practitioner has been appointed, they make the principal compliance declaration that the designs are covered and the declarations were made by practitioners authorised to make them.

Hvorfor: The declaration is a personal statement by a named practitioner and it carries personal consequences, which is why it is chased rather than given. Collecting them as they are signed, against a list drawn at the start, is the difference between a routine administrative task and a search for six people at the end of a job.

InputDesigns collected with revisionsRegistration checked per classResultatDesign compliance declarationsPrincipal declaration where appointed
5

Lodge them before the work they cover starts

Myndighedsgodkendelser

Lodge the construction issued regulated designs and their declarations through the state planning portal before building work commences, and keep the lodgement receipts against the submission record so the date can be shown rather than remembered.

Skærmbillede, trin 5: Lodge them before the work they cover starts (Myndighedsgodkendelser, Indgiv regulated designs under Design and Building Practitioners Act)
Myndighedsgodkendelser: Lodge them before the work they cover starts

Hvorfor: The obligation is tied to the start of the work rather than to a milestone anybody celebrates, so the deadline arrives while the site is mobilising and everyone is busy with something else. Lodging late is not curable by lodging afterwards, because the record shows when the work started.

InputDesigns and declarationsPlanned start on siteResultatLodged before work startsLodgement receipts on file
6

Treat a change on site as a new regulated design

Kvalitetsstyring

Route every change that touches a regulated design back through the same loop, a varied regulated design, a fresh declaration from a registered practitioner and a lodgement, before the varied work is built. Keep the link between the change and the design it varied.

Skærmbillede, trin 6: Treat a change on site as a new regulated design (Kvalitetsstyring, Indgiv regulated designs under Design and Building Practitioners Act)
Kvalitetsstyring: Treat a change on site as a new regulated design

Hvorfor: This is the step the regime is most often failed on, and it fails quietly. Work built to a marked up sketch is work with no declared design behind it, and nothing on site looks wrong; the gap appears at the end, when the building is finished and the only remedies are expensive.

InputDesign change on siteWhat was lodged beforeResultatVaried design declared againWhat was built matches what was declared
7

Close it out before the occupation certificate is applied for

Afslutning

Check the close-out register holds every regulated design, every declaration and every lodgement receipt, then have the registered building practitioner make the building compliance declaration that the work complies with the designs as declared.

Skærmbillede, trin 7: Close it out before the occupation certificate is applied for (Afslutning, Indgiv regulated designs under Design and Building Practitioners Act)
Afslutning: Close it out before the occupation certificate is applied for

Hvorfor: The compliance declarations have to be in place before an application for an occupation certificate can be made, which means a single missing declaration holds up handover for a finished building. Every day of that is carrying cost on a project that has stopped earning.

InputAll declarations lodgedBuilding work completeResultatBuilding compliance declarationReady to apply for occupation
Moduler

Moduler i denne playbook

7 / 190 platformmoduler

The market this case is written for

Australien

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.