Cas / Qualité & sécurité
Qualité & sécurité

Déposer les regulated designs sous le Design and Building Practitioners Act

Décidez quels dessins sont des regulated designs, vérifiez que chaque practitioner est enregistré pour la classe de travaux qu'il déclare, réunissez les construction issued designs et leurs déclarations de conformité, déposez-les avant que les travaux ne commencent, repérez la modification de site qui crée un nouveau regulated design, et clôturez avec la déclaration dont dépend l'occupation certificate.

7 étapes18 minEntreprise généraleBureau de conception / d'ingénieriePromoteur / maître d'ouvrageBureau de gestion de projet / de construction

Comment ça marche, étape par étape

7 étapes à travers la plateforme - ce que vous faites à chacune et pourquoi c’est important.

1

Decide which designs are regulated designs

Examen de l'autorité

Work through the design register and mark which documents are regulated designs, the ones covering building elements the regulation names, such as fire safety systems, waterproofing, and the internal and external load bearing components, together with the performance solutions that support them. Name the practitioner who will declare each one.

Pourquoi: The list decides the whole workflow, and it is drawn once at the start when it is cheap. A document identified as regulated three months into construction needs a declaration from a practitioner who may not have been engaged on that basis, at a price nobody budgeted, for work that is already built.

EntréeDesign documents for the jobBuilding class and work typeRésultatList of regulated designsPractitioner responsible for each
2

Check the registration covers the class being declared

Habilitations

Record each practitioner's registration, the classes of design work it authorises and its expiry, along with the professional indemnity cover the scheme requires. Check the registration against the class of the design they are being asked to declare, not simply that they hold one.

Pourquoi: A declaration made by someone whose registration does not authorise that class of work is not a declaration, and the failure is invisible until it is checked. Registration also expires mid project, which turns a valid declaration into a problem on a date nobody was watching.

EntréeDesign team engagedClasses of design workRésultatRegistration checked per classExpiry and insurance dates watched
3

Collect the construction issued designs and their revisions

Soumissions

Run the regulated designs through the submittal register so each one arrives with its revision, its date and the practitioner who prepared it, and so a design still outstanding is visible as an outstanding item rather than as an absence nobody noticed.

Pourquoi: What is lodged has to be the version that will actually be built from, and a register that tracks revisions is the only thing that keeps those two the same document. A declaration attached to a superseded revision is worse than none, because it reads as compliance while describing a building nobody is constructing.

EntréeConstruction issued drawingsList of regulated designsRésultatDesigns collected with revisionsMissing designs visible
4

Get a declaration for every regulated design

Signatures électroniques

Collect a design compliance declaration signed by the registered design practitioner for each regulated design. Where a principal design practitioner has been appointed, they make the principal compliance declaration that the designs are covered and the declarations were made by practitioners authorised to make them.

Pourquoi: The declaration is a personal statement by a named practitioner and it carries personal consequences, which is why it is chased rather than given. Collecting them as they are signed, against a list drawn at the start, is the difference between a routine administrative task and a search for six people at the end of a job.

EntréeDesigns collected with revisionsRegistration checked per classRésultatDesign compliance declarationsPrincipal declaration where appointed
5

Lodge them before the work they cover starts

Soumissions à l'autorité

Lodge the construction issued regulated designs and their declarations through the state planning portal before building work commences, and keep the lodgement receipts against the submission record so the date can be shown rather than remembered.

Pourquoi: The obligation is tied to the start of the work rather than to a milestone anybody celebrates, so the deadline arrives while the site is mobilising and everyone is busy with something else. Lodging late is not curable by lodging afterwards, because the record shows when the work started.

EntréeDesigns and declarationsPlanned start on siteRésultatLodged before work startsLodgement receipts on file
6

Treat a change on site as a new regulated design

Gestion qualité

Route every change that touches a regulated design back through the same loop, a varied regulated design, a fresh declaration from a registered practitioner and a lodgement, before the varied work is built. Keep the link between the change and the design it varied.

Pourquoi: This is the step the regime is most often failed on, and it fails quietly. Work built to a marked up sketch is work with no declared design behind it, and nothing on site looks wrong; the gap appears at the end, when the building is finished and the only remedies are expensive.

EntréeDesign change on siteWhat was lodged beforeRésultatVaried design declared againWhat was built matches what was declared
7

Close it out before the occupation certificate is applied for

Clôture

Check the close-out register holds every regulated design, every declaration and every lodgement receipt, then have the registered building practitioner make the building compliance declaration that the work complies with the designs as declared.

Pourquoi: The compliance declarations have to be in place before an application for an occupation certificate can be made, which means a single missing declaration holds up handover for a finished building. Every day of that is carrying cost on a project that has stopped earning.

EntréeAll declarations lodgedBuilding work completeRésultatBuilding compliance declarationReady to apply for occupation
Modules

Modules de ce playbook

7 / 190 modules de la plateforme

Le marché pour lequel ce cas est écrit

Australie

Tout dans ce cas suit la façon dont les travaux sont métrés, chiffrés et payés sur ce marché. Les formulaires, la décomposition des coûts et les règles de paiement sont ceux qui y sont utilisés, pas une version générique.

Normes qu’il suit

  • AS 4000
  • Security of Payment Act

Vous n’avez rien de tout cela à paramétrer à la main. Au premier démarrage, la plateforme demande sur quel marché vous travaillez. Choisissez celui-ci et elle règle la langue de l’interface, charge la base de coûts correspondante, enregistre la classification des coûts et ajoute un projet d’exemple que vous pouvez ouvrir tout de suite.

Les contrôles propres à ce marché sont eux aussi fournis avec la plateforme. Une fois activés, un devis auquel il manque quelque chose que le marché attend est signalé pendant que vous y travaillez, et non après l’envoi de l’offre.