ケース / 品質と安全
品質と安全

Design and Building Practitioners Act のもとで regulated designs を提出する

どの図面が regulated designs に当たるかを判断し、各 practitioner が申告する work の区分について登録されていることを確認し、construction issued designs とその適合宣言を集め、work の開始前にそれらを提出し、新しい regulated design を生じさせる現場変更を捕捉し、occupation certificate が依拠する宣言で締めくくる。

7ステップ18 分総合建設会社設計事務所 / エンジニアリング会社デベロッパー / 発注者プロジェクト / 施工管理会社

仕組みをステップごとに

プラットフォーム全体で7ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Decide which designs are regulated designs

当局のレビュー

Work through the design register and mark which documents are regulated designs, the ones covering building elements the regulation names, such as fire safety systems, waterproofing, and the internal and external load bearing components, together with the performance solutions that support them. Name the practitioner who will declare each one.

理由: The list decides the whole workflow, and it is drawn once at the start when it is cheap. A document identified as regulated three months into construction needs a declaration from a practitioner who may not have been engaged on that basis, at a price nobody budgeted, for work that is already built.

入力Design documents for the jobBuilding class and work type出力List of regulated designsPractitioner responsible for each
2

Check the registration covers the class being declared

資格

Record each practitioner's registration, the classes of design work it authorises and its expiry, along with the professional indemnity cover the scheme requires. Check the registration against the class of the design they are being asked to declare, not simply that they hold one.

理由: A declaration made by someone whose registration does not authorise that class of work is not a declaration, and the failure is invisible until it is checked. Registration also expires mid project, which turns a valid declaration into a problem on a date nobody was watching.

入力Design team engagedClasses of design work出力Registration checked per classExpiry and insurance dates watched
3

Collect the construction issued designs and their revisions

提出書類

Run the regulated designs through the submittal register so each one arrives with its revision, its date and the practitioner who prepared it, and so a design still outstanding is visible as an outstanding item rather than as an absence nobody noticed.

理由: What is lodged has to be the version that will actually be built from, and a register that tracks revisions is the only thing that keeps those two the same document. A declaration attached to a superseded revision is worse than none, because it reads as compliance while describing a building nobody is constructing.

入力Construction issued drawingsList of regulated designs出力Designs collected with revisionsMissing designs visible
4

Get a declaration for every regulated design

電子署名

Collect a design compliance declaration signed by the registered design practitioner for each regulated design. Where a principal design practitioner has been appointed, they make the principal compliance declaration that the designs are covered and the declarations were made by practitioners authorised to make them.

理由: The declaration is a personal statement by a named practitioner and it carries personal consequences, which is why it is chased rather than given. Collecting them as they are signed, against a list drawn at the start, is the difference between a routine administrative task and a search for six people at the end of a job.

入力Designs collected with revisionsRegistration checked per class出力Design compliance declarationsPrincipal declaration where appointed
5

Lodge them before the work they cover starts

当局への提出

Lodge the construction issued regulated designs and their declarations through the state planning portal before building work commences, and keep the lodgement receipts against the submission record so the date can be shown rather than remembered.

理由: The obligation is tied to the start of the work rather than to a milestone anybody celebrates, so the deadline arrives while the site is mobilising and everyone is busy with something else. Lodging late is not curable by lodging afterwards, because the record shows when the work started.

入力Designs and declarationsPlanned start on site出力Lodged before work startsLodgement receipts on file
6

Treat a change on site as a new regulated design

品質管理

Route every change that touches a regulated design back through the same loop, a varied regulated design, a fresh declaration from a registered practitioner and a lodgement, before the varied work is built. Keep the link between the change and the design it varied.

理由: This is the step the regime is most often failed on, and it fails quietly. Work built to a marked up sketch is work with no declared design behind it, and nothing on site looks wrong; the gap appears at the end, when the building is finished and the only remedies are expensive.

入力Design change on siteWhat was lodged before出力Varied design declared againWhat was built matches what was declared
7

Close it out before the occupation certificate is applied for

完了

Check the close-out register holds every regulated design, every declaration and every lodgement receipt, then have the registered building practitioner make the building compliance declaration that the work complies with the designs as declared.

理由: The compliance declarations have to be in place before an application for an occupation certificate can be made, which means a single missing declaration holds up handover for a finished building. Every day of that is carrying cost on a project that has stopped earning.

入力All declarations lodgedBuilding work complete出力Building compliance declarationReady to apply for occupation
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 7

The market this case is written for

オーストラリア

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

品質と安全の他のケース

品質と安全

工事を検査し不適合を解決する

受入基準に照らして工事を検査し、不合格になった時点で不適合を起票し、是正を進めさせ、再検査を行い、不具合が確かに修正されたことを記録に残す。

3ステップ10 分開く
品質と安全

ツールボックストークと安全確認

そのシフトで実際に発生するリスクについて作業班に説明し、出席者を記録し、合意した管理策が実際に機能しているか巡回で確認する。

2ステップ8 分開く
品質と安全

材料提出書類の承認を得る

購入予定の製品をデータとともに設計者へ提示し、仕様と照合してチェックを受け、承認された時点で初めて発注へ進める。

3ステップ9 分開く