按Design and Building Practitioners Act提交regulated designs

判定哪些图纸属于regulated designs,核实每位practitioner是否为其所申报的工作类别注册,收集construction issued designs及其合规声明,在建筑工作开始前提交,捕捉现场创造出新regulated design的变更,并以occupation certificate所依赖的声明收尾。

7 个步骤18 分钟总承包商设计/工程顾问公司开发商/业主项目/施工管理公司

运作方式,逐步说明

贯穿平台的 7 个步骤 - 每一步做什么,以及为什么重要。

1

Decide which designs are regulated designs

审核主管部门

Work through the design register and mark which documents are regulated designs, the ones covering building elements the regulation names, such as fire safety systems, waterproofing, and the internal and external load bearing components, together with the performance solutions that support them. Name the practitioner who will declare each one.

原因: The list decides the whole workflow, and it is drawn once at the start when it is cheap. A document identified as regulated three months into construction needs a declaration from a practitioner who may not have been engaged on that basis, at a price nobody budgeted, for work that is already built.

输入Design documents for the jobBuilding class and work type成果List of regulated designsPractitioner responsible for each
2

Check the registration covers the class being declared

资质

Record each practitioner's registration, the classes of design work it authorises and its expiry, along with the professional indemnity cover the scheme requires. Check the registration against the class of the design they are being asked to declare, not simply that they hold one.

原因: A declaration made by someone whose registration does not authorise that class of work is not a declaration, and the failure is invisible until it is checked. Registration also expires mid project, which turns a valid declaration into a problem on a date nobody was watching.

输入Design team engagedClasses of design work成果Registration checked per classExpiry and insurance dates watched
3

Collect the construction issued designs and their revisions

提交物

Run the regulated designs through the submittal register so each one arrives with its revision, its date and the practitioner who prepared it, and so a design still outstanding is visible as an outstanding item rather than as an absence nobody noticed.

原因: What is lodged has to be the version that will actually be built from, and a register that tracks revisions is the only thing that keeps those two the same document. A declaration attached to a superseded revision is worse than none, because it reads as compliance while describing a building nobody is constructing.

输入Construction issued drawingsList of regulated designs成果Designs collected with revisionsMissing designs visible
4

Get a declaration for every regulated design

电子签名

Collect a design compliance declaration signed by the registered design practitioner for each regulated design. Where a principal design practitioner has been appointed, they make the principal compliance declaration that the designs are covered and the declarations were made by practitioners authorised to make them.

原因: The declaration is a personal statement by a named practitioner and it carries personal consequences, which is why it is chased rather than given. Collecting them as they are signed, against a list drawn at the start, is the difference between a routine administrative task and a search for six people at the end of a job.

输入Designs collected with revisionsRegistration checked per class成果Design compliance declarationsPrincipal declaration where appointed
5

Lodge them before the work they cover starts

主管部门提交

Lodge the construction issued regulated designs and their declarations through the state planning portal before building work commences, and keep the lodgement receipts against the submission record so the date can be shown rather than remembered.

原因: The obligation is tied to the start of the work rather than to a milestone anybody celebrates, so the deadline arrives while the site is mobilising and everyone is busy with something else. Lodging late is not curable by lodging afterwards, because the record shows when the work started.

输入Designs and declarationsPlanned start on site成果Lodged before work startsLodgement receipts on file
6

Treat a change on site as a new regulated design

质量管理

Route every change that touches a regulated design back through the same loop, a varied regulated design, a fresh declaration from a registered practitioner and a lodgement, before the varied work is built. Keep the link between the change and the design it varied.

原因: This is the step the regime is most often failed on, and it fails quietly. Work built to a marked up sketch is work with no declared design behind it, and nothing on site looks wrong; the gap appears at the end, when the building is finished and the only remedies are expensive.

输入Design change on siteWhat was lodged before成果Varied design declared againWhat was built matches what was declared
7

Close it out before the occupation certificate is applied for

收尾

Check the close-out register holds every regulated design, every declaration and every lodgement receipt, then have the registered building practitioner make the building compliance declaration that the work complies with the designs as declared.

原因: The compliance declarations have to be in place before an application for an occupation certificate can be made, which means a single missing declaration holds up handover for a finished building. Every day of that is carrying cost on a project that has stopped earning.

输入All declarations lodgedBuilding work complete成果Building compliance declarationReady to apply for occupation
模块

此方案使用的模块

190 个平台模块中的 7

The market this case is written for

澳大利亚

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • AS 4000
  • Security of Payment Act

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

更多 质量与安全 案例

质量与安全

检查工程并关闭不符合项

依据验收标准检查工程,一旦不合格立即提出不符合项,推动整改并复检,使记录能证明缺陷已确实修复。

3 个步骤10 分钟打开
质量与安全

安全讲话与安全检查

向班组说明本班次实际存在的隐患,记录出勤人员,然后在巡查中验证约定的管控措施是否真正落实。

2 个步骤8 分钟打开
质量与安全

获取材料报审批准

将拟采购的产品连同技术资料提交设计方审核,对照技术规格进行核查,获批后再放行下单。

3 个步骤9 分钟打开