سناریوها / مناقصه‌گذاری و تدارکات
مناقصه‌گذاری و تدارکات

ارزیابی یک مناقصه دولتی در برابر هزینه برآوردی

هزینه برآوردی‌ای که مناقصه بر مبنای آن فراخوانده شده را ثابت کنید، همان صورت‌وضعیت را برای هر مناقصه‌گر صادر کنید، پیشنهادها را دریافت و باز کنید، آن‌ها را قلم‌به‌قلم در برابر برآورد بخوانید نه فقط بر اساس درصد، و استدلال واگذاری را در سوابق ثبت کنید.

5 مرحله24 دقیقهسازنده / کارفرمادفتر مدیریت پروژه / ساختمشاوره هزینه / QSپیمانکار عمومی

چگونه کار می‌کند، گام به گام

5 گام در سراسر پلتفرم - کاری که در هر گام انجام می‌دهید و چرا اهمیت دارد.

1

Fix the estimated cost the tender is called on

مبنای برآورد

Record the estimated cost as issued, the schedule and edition behind it, the price level, and what it excludes. Freeze it before the notice goes out, so later comparison is against the figure bidders actually saw.

چرا: An estimate that keeps moving after issue cannot be compared with anything. Fixing it is what makes the percentage above or below meaningful, and it is the first thing an audit of the award asks to see.

ورودیThe priced estimateThe sanctioned amountخروجیThe estimated cost, fixed and dated
2

Issue one bill, one set of conditions, one clock

مناقصه‌گذاری

Publish the tender on the frozen bill, stating the tender form, whether rates are quoted item by item or as a single percentage, the earnest money required, the eligibility conditions and the closing date. Issue every clarification to every bidder.

چرا: The comparison at the end is only valid if the offers answer the same question. A clarification sent to one bidder, or a bill quietly corrected after issue, breaks that and is the most common ground on which an award is challenged.

ورودیThe tender billConditions and eligibilityخروجیOne bill issued to everyoneDates and the earnest money required
3

Receive the offers and settle eligibility before price

مدیریت مناقصه

Log every offer with its time of receipt, check the earnest money and the eligibility documents, and settle who is technically qualified before any financial offer is read.

چرا: Two-stage opening exists so that eligibility cannot be decided by knowing the price. Recording the technical decision with its date, before the financial opening, is what makes that separation demonstrable rather than merely intended.

ورودیSealed offersخروجیA register of who bid and whenWho cleared the technical stage
4

Compare at the item, not only at the percentage

کاوشگر هزینه

Put the offers beside the estimated rates and look for items that are far below the estimate on early work and far above on late work, and for rates that no analysis supports. Query those with the bidder and record the answer.

چرا: Front loading is legal, invisible in a total, and expensive. So is a rate so far below the estimate that the item cannot be built for it, because that work is either not done or comes back as a claim. Both are visible only when the bill is compared line by line against a fixed reference.

ورودیQualified offers on the same billThe estimated ratesخروجیItem by item spread against the estimateThe items worth querying
5

Award on the record, with the security in place

قراردادها

Set the contract up on the accepted rates, carry the percentage above or below onto it, and record the performance security, the defect liability period and the price variation position agreed at award.

چرا: Everything the job argues about later, valuation, extras, escalation, release of security, is decided against what the contract says at this moment. Writing it down here is cheap; reconstructing it from the tender file two years later is not.

ورودیThe recommendation and its reasonsخروجیA contract on the accepted ratesPerformance security recorded
ماژول‌ها

ماژول‌های این سناریو

5 / 190 ماژول پلتفرم

The market this case is written for

هند

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CPWD DSR
  • IS 456
  • RERA

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

بیشتر در مناقصه‌گذاری و تدارکات

مناقصه‌گذاری و تدارکات

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 مرحله12 دقیقهباز کردن
مناقصه‌گذاری و تدارکات

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 مرحله10 دقیقهباز کردن
مناقصه‌گذاری و تدارکات

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 مرحله12 دقیقهباز کردن