Hand over a COBie facility export

Turn the asset register into the COBie UK 2.4 workbook an FM system can actually import: fill the fields the sheets are built from, fix what the export would expose, produce the workbook and issue it with the close-out package.

4 مرحله9 دقیقهپیمانکار عمومیمالک / بهرهبردار (FM)مشاوره BIM / دیجیتال

چگونه کار می‌کند، گام به گام

4 گام در سراسر پلتفرم - کاری که در هر گام انجام می‌دهید و چرا اهمیت دارد.

1

Complete the register the workbook is built from

داراییهای ساختمان (FM)

Work through the tracked assets and fill the fields COBie reads: make, model and serial, the operational status and warranty date, the storey the item sits on and the parent system it belongs to.

چرا: The workbook is a projection of the register, not a document you write separately, so the sheets are only as complete as the rows behind them. A blank storey does not leave one empty cell, it removes a whole Floor row the receiving system was expecting to hang the asset on.

ورودیTracked assetsCanonical model dataخروجیComplete asset registerAssets under a parent system
2

Check the gaps the export will expose

داراییهای ساختمان (FM)

Before you export, read the register the way the workbook will: search and filter down to the assets with no serial, no warranty date and no parent system, and either fix them or put them back to whoever installed the plant.

چرا: The export falls back to n/a rather than failing, so a workbook full of holes still downloads cleanly and still looks finished. Nobody finds out until the operator tries to raise a work order against a pump with no serial and no system, by which time the fitters have long gone.

ورودیComplete asset registerOperator data requirementsخروجیList of thin recordsFixes back to the delivery team
3

Build the COBie 2.4 workbook

داراییهای ساختمان (FM)

Export the register as a COBie UK 2.4 workbook. It arrives as one spreadsheet with seven sheets, Contact, Facility, Floor, Space, Type, Component and System, each projected straight from the canonical model and the asset data sitting on it.

چرا: A workbook generated from the model matches the building; a workbook typed into a template matches whatever the typist had in front of them that week. Exporting per model as each one is signed off also keeps the register current, instead of leaving the whole job to the fortnight before handover.

ورودیChecked asset registerModel to exportخروجیCOBie 2.4 workbookSeven populated sheets
4

Issue it to the operator

بستن پروژه

Bind the workbook into the close-out package alongside the as-built drawings, the O and M manuals and the warranties, and issue the lot as one structured set with its manifest.

چرا: A COBie file arriving on its own gets loaded by nobody, because the FM team cannot tell which state of the building it describes. Wrapped in the close-out package, dated and listed on the manifest, it is a deliverable the operator can accept, import and be held to.

ورودیCOBie 2.4 workbookClose-out checklistخروجیIssued handover packageOperator acceptance
ماژول‌ها

ماژول‌های این سناریو

2 / 184 ماژول پلتفرم

بیشتر در تحویل و چرخه عمر

تحویل و چرخه عمر

تحویل و اختتام پروژه

پروژه را تمیز تمام کنید: پانچلیست را به صفر برسانید، تأیید کنید هر بازرسی قبول شده و هیچ عدم…

5 مرحله14 دقیقهباز کردن
تحویل و چرخه عمر

تحویل as-built و O&M

سوابق as-built را گردآوری کنید، ثابت کنید پرونده کیفیت خلأیی ندارد، سپس بسته بهرهبرداری و نگ…

3 مرحله12 دقیقهباز کردن
تحویل و چرخه عمر

اجرای یک بازرسی پذیرش تحویل

کارهای تمامشده را همراه با کارفرما بازدید کنید، آنچه قبول و آنچه در برابر معیارهای پذیرش رد…

3 مرحله11 دقیقهباز کردن