केस / वाणिज्यिक और अनुबंध
वाणिज्यिक और अनुबंध

एक भुगतान विवाद को adjudication के लिए भेजें

यह तय करें कि क्या सूचित किया गया और क्या नहीं, समकालीन रिकॉर्ड को एक ऐसे पैकेज में इकट्ठा करें जिसे दोनों पक्ष पुनः प्रस्तुत कर सकें, नोटिस वहां भेजें जहां अनुबंध कहता है, रेफरल को उसके साथ जाने वाली हर चीज़ के साथ दाखिल करें, और निर्णय को वापस काम में लाएं।

5 चरण15 मिनटमुख्य ठेकेदारविशेषज्ञ उपठेकेदारलागत परामर्श / QS फर्म

यह कैसे काम करता है, चरण दर चरण

प्लेटफ़ॉर्म भर में 5 चरण - हर एक में आप क्या करते हैं और यह क्यों मायने रखता है।

1

Establish what was notified and what was not

भुगतान घड़ी

Read the clock for the application in dispute: the dates, the notices actually served, the ones that were missed or served out of time, and the sum the module derives as notified. Take the derivation as it is printed rather than paraphrasing it into a sentence.

क्यों: Most British payment disputes are decided on the sequence rather than on the valuation. Whether a payment notice was served, whether a pay less notice stated its basis and whether either was in time will usually settle the sum before anybody looks at the work, so this is the cheapest thing to get right and the most expensive to get wrong.

इनपुटPayment application and noticesStatutory datesपरिणामNotified sum, with its derivationNotices missed or out of time
2

Assemble one pack both sides can reproduce

दावा साक्ष्य

Build the evidence pack from the source records: the notices, the correspondence, the RFIs, the approvals, the variation records and any delay analysis. The ordering is deterministic and the pack carries a content digest, so feeding the same records in a different order produces the same bundle.

स्क्रीनशॉट, चरण 2: Assemble one pack both sides can reproduce (दावा साक्ष्य, एक भुगतान विवाद को adjudication के लिए भेजें)
दावा साक्ष्य: Assemble one pack both sides can reproduce

क्यों: An adjudicator reads a great deal of paper in a short time, and an ordered pack is read differently from a folder of attachments. A digest also means the other side cannot end up holding a slightly different bundle from the one the adjudicator has, which is a dispute nobody needs inside a dispute.

इनपुटNotices, letters and RFIsDiary and progress recordsपरिणामEvidence packSources in a fixed order
3

Serve the notice where the contract says to serve it

पत्राचार

Issue the notice of adjudication through the correspondence register: to the right party, at the address the contract gives for service, stating the nature of the dispute, what is claimed and the redress sought. The register keeps the date and the method of service with it.

स्क्रीनशॉट, चरण 3: Serve the notice where the contract says to serve it (पत्राचार, एक भुगतान विवाद को adjudication के लिए भेजें)
पत्राचार: Serve the notice where the contract says to serve it

क्यों: Service is where an otherwise good referral dies. A notice sent to the wrong entity inside a group, or to an email address the contract does not recognise, can be challenged on jurisdiction before anybody looks at the merits, and the seven days to the referral do not pause while that gets sorted out.

इनपुटEvidence packContract service provisionsपरिणामNotice of adjudication servedDate and method of service on record
4

File the referral and everything that follows it

दस्तावेज़

Put the referral and its annexes into the project files as one versioned, dated set alongside the notice. The response, the reply and the decision go into the same place as they arrive rather than into whoever happened to receive them.

स्क्रीनशॉट, चरण 4: File the referral and everything that follows it (दस्तावेज़, एक भुगतान विवाद को adjudication के लिए भेजें)
दस्तावेज़: File the referral and everything that follows it

क्यों: An adjudication produces a lot of documents in twenty eight days, across several people, usually while the job is still running. Keeping them in the project rather than in one mailbox is what lets the next stage, whether that is enforcement, a second adjudication or a settlement, start from the record instead of from a reconstruction.

इनपुटReferral document and annexesNotice of adjudication servedपरिणामOne filed set of the disputeResponses filed as they arrive
5

Put the decision back into the job

रिपोर्ट

Record the decision and what it changed: the sum payable, the date it is payable by, and any effect on the programme. An adjudicator's decision binds the parties until the dispute is finally determined, so it is the number the job works to from that day.

स्क्रीनशॉट, चरण 5: Put the decision back into the job (रिपोर्ट, एक भुगतान विवाद को adjudication के लिए भेजें)
रिपोर्ट: Put the decision back into the job

क्यों: The commonest failure after an adjudication is that the decision stays with the commercial team while the valuations carry on exactly as before. Reporting the outcome into the project is what makes the decision operate, and it also leaves the next job an honest record of what a dispute of this kind cost in time and attention.

इनपुटDecision and its dateSum payableपरिणामOutcome reported to the projectValuations follow the decision
मॉड्यूल

इस प्लेबुक के मॉड्यूल

प्लेटफ़ॉर्म के 190 में से 5 मॉड्यूल

The market this case is written for

यूनाइटेड किंगडम

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • RICS NRM 1/2
  • JCT
  • CIS

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

वाणिज्यिक और अनुबंध में और देखें

वाणिज्यिक और अनुबंध

Turn a change into a paid variation

Capture a scope change while it is fresh, price it as a contract variation on your agreed r…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 चरण11 मिनटखोलें
वाणिज्यिक और अनुबंध

Payment application and reconciliation

Value the work put in place this period against the contract, raise the application with th…

3 चरण12 मिनटखोलें