Kasus / Komersial dan kontrak
Komersial dan kontrak

Menerbitkan XRechnung yang sesuai ketentuan

Ubah pekerjaan yang selesai untuk satu periode menjadi faktur elektronik yang benar-benar akan diterima klien publik Jerman: lengkapi data pembeli dan penjual yang disyaratkan standar, bereskan setiap aturan yang dikutip pemeriksaan, ekspor XML XRechnung, dan catat ke mana Anda mengirimkannya.

7 langkah11 mntKontraktor umumSubkontraktor spesialisKonsultansi biaya / QS

Cara kerjanya, langkah demi langkah

7 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Take this period's positions off the bill

Daftar Kuantitas

Open the priced bill and work out what this interim actually bills: the positions finished on site in this period, measured rather than estimated, and the amount that falls on them.

Tangkapan layar, langkah 1: Take this period's positions off the bill (Daftar Kuantitas, Menerbitkan XRechnung yang sesuai ketentuan)
Daftar Kuantitas: Take this period's positions off the bill

Mengapa: An interim invoice is a payment on account for work genuinely done. A position billed ahead of the Leistungsstand is the one the client's surveyor strikes out, and the rest of the invoice waits while that single line is argued.

MasukanPriced bill positionsSite measurementHasilAmount to billBilling period
2

Raise the receivable invoice

Keuangan

On the receivable side of the Invoices tab, raise the interim invoice with its number, invoice date, due date and one line per block of work it bills, and pick the client from the contacts rather than typing a name into a free text field.

Tangkapan layar, langkah 2: Raise the receivable invoice (Keuangan, Menerbitkan XRechnung yang sesuai ketentuan)
Keuangan: Raise the receivable invoice

Mengapa: The electronic invoice is built from this record and nothing else, so a line missing here is a line missing in the XML. Picking the linked contact is what lets the buyer address be read instead of retyped on every invoice you send that client.

MasukanAmount to billClient contactHasilReceivable invoiceInvoice lines
3

Complete the buyer on the contact

Kontak

Open the client contact the invoice bills and fill in the buyer party the standard wants: legal name, street, postcode, town and the two-letter country code. The electronic invoice reads the buyer from here, not from the invoice.

Mengapa: An invoice whose buyer has no postal address is rejected outright, and for XRechnung the town and the postcode are each a fatal finding of their own. Filling them once on the contact fixes every invoice you will ever send that client.

MasukanClient contactBuyer postal addressHasilComplete buyer partyReusable master data
4

Fill the seller side once

Pengaturan

Under Settings, E-invoice, set your own side once: legal name and address, VAT identifier or tax number, a named contact with telephone and email, the IBAN the client pays into, and the payment terms you invoice on.

Tangkapan layar, langkah 4: Fill the seller side once (Pengaturan, Menerbitkan XRechnung yang sesuai ketentuan)
Pengaturan: Fill the seller side once

Mengapa: XRechnung asks for more than the European standard does, and the named seller contact with a phone number and an email is exactly where it goes further. Set it here and it is right on every invoice afterwards, instead of being chased once a month.

MasukanCompany registration dataBank accountHasilSeller identityPayment terms
5

Run the check until it is green

Keuangan

Open the electronic invoice dialog on that invoice, pick the XRechnung profile, and read what comes back. Blocking findings quote the rule identifier that will reject you, BR-DE-15 for a missing Leitweg-ID among them. Fix each one and run it again.

Tangkapan layar, langkah 5: Run the check until it is green (Keuangan, Menerbitkan XRechnung yang sesuai ketentuan)
Keuangan: Run the check until it is green

Mengapa: This is the same rule set the receiving portal runs, quoted in the same words. Reading BR-DE-15 here costs you a minute. Reading it in a rejection notice three weeks later costs you the whole payment period and a second run at the invoice.

MasukanDraft electronic invoiceLeitweg-ID from the clientHasilRule findingsGreen check
6

Export the XRechnung XML

Keuangan

The download only unlocks once the check is clean. Take the XML: that file is the invoice. A hybrid PDF carrying the same data inside it is there for readers who want a page to look at, and it is not what the receiver parses.

Mengapa: A public buyer's system reads the XML and ignores whatever you attached for human eyes. Sending a PDF and calling it an electronic invoice is the most common way a small firm finds out what the mandate actually asked for.

MasukanGreen checkApproved invoiceHasilXRechnung XMLOptional hybrid PDF
7

Record where it went

Persetujuan e-Faktur

Log the send: the registration you issued under, the document itself, and the transmission id the portal or the access point gave back. The Leitweg-ID it was routed on is what the record keeps.

Tangkapan layar, langkah 7: Record where it went (Persetujuan e-Faktur, Menerbitkan XRechnung yang sesuai ketentuan)
Persetujuan e-Faktur: Record where it went

Mengapa: Germany routes an invoice rather than clearing it, so no authority stamps yours. The transmission id is the only proof you sent it on the day you say you did, and it is what you quote when the client's accounts department cannot find it.

MasukanXRechnung XMLPortal receiptHasilTransmission idSend on record
Modul

Modul dalam playbook ini

5 / 190 modul platform

The market this case is written for

Jerman

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Lainnya di Komersial dan kontrak

Komersial dan kontrak

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 langkah11 mntBuka