Menyelesaikan satu periode berjalan dan mendapatkan tanda tangannya

Beri harga pada kuantitas yang selesai dan tidak disengketakan untuk satu periode, termasuk perubahan yang diterima di dalamnya, bekukan daftar sebagai versi bernama, tulis pernyataan yang dikonfirmasi, dan dapatkan tanda tangan kedua belah pihak pada catatannya.

5 langkah18 mntKontraktor umumPengembang / klienKonsultansi biaya / QSBiro manajemen proyek / konstruksi

Cara kerjanya, langkah demi langkah

5 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Price only what is complete and undisputed

Daftar Kuantitas

Work the bill for the period: price the quantities that are complete, add the changes that were accepted inside it, and deliberately leave out anything still in dispute. Note what you left out and why.

Tangkapan layar, langkah 1: Price only what is complete and undisputed (Daftar Kuantitas, Menyelesaikan satu periode berjalan dan mendapatkan tanda tangannya)
Daftar Kuantitas: Price only what is complete and undisputed

Mengapa: The point of settling in process is to take the settled part off the table permanently, and one contested item is enough to keep a whole period open. Confirming ninety percent now and carrying ten percent forward is worth far more than agreeing everything eventually.

MasukanQuantities completed in the periodChanges accepted in the periodHasilValue of the periodDisputed items left out
2

Take a named version at the close of the period

Daftar Kuantitas

Save a version of the bill at the moment the period closes and name it for the period, so the state you are about to have signed can be retrieved exactly as it was.

Mengapa: The bill carries on moving after this, and that is correct. What the named version buys you is the ability to answer, in a year, which numbers the signatures were given against - without asking anybody to remember, and without freezing a document the project still needs to work on.

MasukanThe period pricedHasilNamed version of the billThe exact numbers, retrievable
3

Write the statement the two parties will sign

Dokumen

File the period statement in the project documents: the span it covers, the confirmed quantities and value, the changes included, the items deliberately excluded, and the name of the bill version it was taken from.

Tangkapan layar, langkah 3: Write the statement the two parties will sign (Dokumen, Menyelesaikan satu periode berjalan dan mendapatkan tanda tangannya)
Dokumen: Write the statement the two parties will sign

Mengapa: A signature is only as good as the document under it. A statement that names its own span and its own exclusions cannot later be read as covering more or less than it did, which is the single most common way an in-process settlement stops holding.

MasukanThe named versionWhat was left outHasilConfirmed period statement
4

Get both signatures against the same document

Tanda Tangan Elektronik

Open a signing session over the statement, name the signatory on each side, and let each of them sign. Every signature is recorded against that document reference with the time it was given.

Tangkapan layar, langkah 4: Get both signatures against the same document (Tanda Tangan Elektronik, Menyelesaikan satu periode berjalan dan mendapatkan tanda tangannya)
Tanda Tangan Elektronik: Get both signatures against the same document

Mengapa: Two signatures on one document is the whole mechanism. Two separate approvals in two separate systems is what produces the classic dispute where each side is certain it agreed to something slightly different, and neither can show what.

MasukanThe period statementBoth parties' signatoriesHasilSigning session on the recordWho signed, and when
5

Keep the settled periods together for the final account

Laporan

Report the settled periods as a running set: what has been confirmed and signed to date, and what is still carried forward as open. Bring that set to the final account as your starting position.

Tangkapan layar, langkah 5: Keep the settled periods together for the final account (Laporan, Menyelesaikan satu periode berjalan dan mendapatkan tanda tangannya)
Laporan: Keep the settled periods together for the final account

Mengapa: A final account assembled from documents both parties already signed is a short meeting about the open items. A final account started from the whole bill invites a review of everything, including the parts that were settled fairly two years ago and that nobody now remembers agreeing.

MasukanSigned period statementsHasilRunning settled positionWhat is still open
Modul

Modul dalam playbook ini

4 / 190 modul platform

The market this case is written for

Tiongkok

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.