Cases / Oplevering & levenscyclus
Oplevering & levenscyclus

Maengel, Abnahme en de Verjaehrung-klok

Log elk Mangel met foto en locatie, ruim de lijst op voor de Abnahme, onderteken een protocol dat precies zegt wat is voorbehouden, en volg de gebreken op de verjaringstermijn die het contract u werkelijk geeft.

6 stappen11 minHoofdaannemerProject- / bouwmanagementbureauOntwikkelaar / opdrachtgever

Zo werkt het, stap voor stap

6 stappen door het platform - wat je bij elke stap doet en waarom het ertoe doet.

1

Walk the building and log every Mangel

Opnamelijst

Walk the building trade by trade well before the acceptance date and put every defect straight into the list: what is wrong, the room or axis it sits in, a photo, and the trade that owns the fix.

Waarom: A defect written on a slip of paper and typed up three weeks later is a defect the trade disputes. Location plus photo, captured while you are standing in front of it, is what turns a complaint into something enforceable.

InvoerPre-acceptance walkTrades on siteResultaatLogged MaengelPhoto and location
2

Drive the list to zero or to agreed exceptions

Inspecties

Re-inspect every item the trade reports as done, close the ones that genuinely pass and reopen the ones that do not, and mark the few that will stay open as exceptions both sides have agreed to carry into the protocol.

Waarom: The acceptance appointment is the worst possible place to discover an open list. Every item closed and proven beforehand is one that cannot be reserved against you, held against your payment, or used to refuse acceptance outright.

InvoerOpen MaengelReported fixesResultaatVerified closuresAgreed exceptions
3

Hold the formal Abnahme and write the protocol

Oplevering & afronding

Run the acceptance walk with the client and record the Abnahmeprotokoll: the date, who was present, what was accepted, which defects are reserved, and any contract penalty the client wants to keep. Both sides sign it.

Waarom: This one document decides more than any other on the project: risk passes, the final payment falls due, the burden of proof turns to the client, and the Verjaehrung starts on its date. A defect not reserved in it, and a contract penalty not reserved with it, is one nobody can raise afterwards.

InvoerCleared Maengel listAcceptance appointmentResultaatSigned AbnahmeprotokollReserved defects
4

Read the limitation period off the contract

Contracten

Open the contract, establish whether VOB/B was validly agreed or the job runs as a plain BGB Werkvertrag, and record the limitation period that follows: four years for building works under VOB/B, five under the BGB, counted from the Abnahme date in the protocol.

Waarom: The two regimes are a full year apart, and assuming the wrong one either hands the client a year you never owed or writes off a claim that was still alive. Reading it off the contract once, at the Abnahme, is what makes every deadline after it trustworthy.

InvoerSigned contractAbnahme dateResultaatContract regimeVerjaehrungsfrist set
5

Track the defects through the liability period

Garanties & onderhoudstermijn

Register the reserved defects and everything reported after handover against the party obliged to fix it, each with the warranty that covers it and the date its period runs out.

Waarom: A defect phoned in to a caretaker and written into nobody's list is a defect the owner quietly ends up paying to fix. One register is what keeps every claim attached to the party that owes it for as long as the period runs.

InvoerReserved defectsDefects reported laterResultaatTracked claimsPeriod end date
6

Send the Maengelruege while the period is open

Deadlines

Work the deadline register: the day each limitation period ends, the date a notified defect must be remedied by, and the counter-deadlines you set the contractor. Issue the Maengelruege in writing, with a deadline to put it right.

Waarom: A claim raised one day after the period has run out is worth nothing, however well it was documented. A written notice sent while the period is still open is what preserves the claim, and the remedy deadline you set with it is what turns it into work on site rather than correspondence.

InvoerLimitation end datesOpen defect claimsResultaatMaengelruege sentRemedy deadline set
Modules

Modules in dit playbook

6 / 190 platformmodules

The market this case is written for

Duitsland

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Meer in Oplevering & levenscyclus

Oplevering & levenscyclus

Hand over and close out

Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…

5 stappen14 minOpenen
Oplevering & levenscyclus

As-built and O and M handover

Pull the as-built record together, prove the quality file has no gaps, then issue an operat…

3 stappen12 minOpenen