Записвайте всеки недостатък (Mangel) със снимка и местоположение, изчистете списъка преди Abnahme, подпишете протокол, който точно посочва какво е запазено с резерва, и следете дефектите спрямо давностния срок, който договорът реално ви дава.

6 стъпки11 минГлавен изпълнителФирма за проектен / строителен мениджмънтИнвеститор / възложител

Как работи, стъпка по стъпка

6 стъпки през платформата - какво правите на всяка и защо е важно.

1

Walk the building and log every Mangel

Списък с дефекти

Walk the building trade by trade well before the acceptance date and put every defect straight into the list: what is wrong, the room or axis it sits in, a photo, and the trade that owns the fix.

Защо: A defect written on a slip of paper and typed up three weeks later is a defect the trade disputes. Location plus photo, captured while you are standing in front of it, is what turns a complaint into something enforceable.

ВходPre-acceptance walkTrades on siteРезултатLogged MaengelPhoto and location
2

Drive the list to zero or to agreed exceptions

Инспекции

Re-inspect every item the trade reports as done, close the ones that genuinely pass and reopen the ones that do not, and mark the few that will stay open as exceptions both sides have agreed to carry into the protocol.

Защо: The acceptance appointment is the worst possible place to discover an open list. Every item closed and proven beforehand is one that cannot be reserved against you, held against your payment, or used to refuse acceptance outright.

ВходOpen MaengelReported fixesРезултатVerified closuresAgreed exceptions
3

Hold the formal Abnahme and write the protocol

Предаване и приключване

Run the acceptance walk with the client and record the Abnahmeprotokoll: the date, who was present, what was accepted, which defects are reserved, and any contract penalty the client wants to keep. Both sides sign it.

Защо: This one document decides more than any other on the project: risk passes, the final payment falls due, the burden of proof turns to the client, and the Verjaehrung starts on its date. A defect not reserved in it, and a contract penalty not reserved with it, is one nobody can raise afterwards.

ВходCleared Maengel listAcceptance appointmentРезултатSigned AbnahmeprotokollReserved defects
4

Read the limitation period off the contract

Договори

Open the contract, establish whether VOB/B was validly agreed or the job runs as a plain BGB Werkvertrag, and record the limitation period that follows: four years for building works under VOB/B, five under the BGB, counted from the Abnahme date in the protocol.

Защо: The two regimes are a full year apart, and assuming the wrong one either hands the client a year you never owed or writes off a claim that was still alive. Reading it off the contract once, at the Abnahme, is what makes every deadline after it trustworthy.

ВходSigned contractAbnahme dateРезултатContract regimeVerjaehrungsfrist set
5

Track the defects through the liability period

Гаранции и отговорност за дефекти

Register the reserved defects and everything reported after handover against the party obliged to fix it, each with the warranty that covers it and the date its period runs out.

Защо: A defect phoned in to a caretaker and written into nobody's list is a defect the owner quietly ends up paying to fix. One register is what keeps every claim attached to the party that owes it for as long as the period runs.

ВходReserved defectsDefects reported laterРезултатTracked claimsPeriod end date
6

Send the Maengelruege while the period is open

Крайни срокове

Work the deadline register: the day each limitation period ends, the date a notified defect must be remedied by, and the counter-deadlines you set the contractor. Issue the Maengelruege in writing, with a deadline to put it right.

Защо: A claim raised one day after the period has run out is worth nothing, however well it was documented. A written notice sent while the period is still open is what preserves the claim, and the remedy deadline you set with it is what turns it into work on site rather than correspondence.

ВходLimitation end datesOpen defect claimsРезултатMaengelruege sentRemedy deadline set
Модули

Модули в този наръчник

6 / 190 модула на платформата

The market this case is written for

Германия

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Още в Предаване и жизнен цикъл

Предаване и жизнен цикъл

Hand over and close out

Finish the job cleanly: work the punch list to zero, confirm every inspection passed and no…

5 стъпки14 минОтвори
Предаване и жизнен цикъл

As-built and O and M handover

Pull the as-built record together, prove the quality file has no gaps, then issue an operat…

3 стъпки12 минОтвори
Предаване и жизнен цикъл

Run a handover acceptance inspection

Walk the finished works with the client, record what passes and what does not against the a…

3 стъпки11 минОтвори