Peeta kinni CIS alltöövõtjale maksmisel

Kontrolli, kellele maksad, salvesta tema staatus skeemis ja selle taga olev kinnitus, arvuta kinnipidamine enne makse väljumist, selgita, kas pöördmaksustamine kehtib, ning pea arvestust, millest koostatakse igakuine deklaratsioon.

5 sammu12 minPeatöövõtjaErialaalltöövõtja

Kuidas see töötab, samm-sammult

5 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

Know who you are paying before you pay them

Alltöövõtjate kataloog

Open the subcontractor's record and check it is the party you actually contracted with: the trading name, the company registration and the subcontract they are working under. This is the record the deduction is taken against.

Miks: A deduction is taken from a party, not from an invoice, and on a job with three companies inside one group the invoice does not always tell you which one is which. Getting the party right first is what makes everything after it checkable.

SisendSubcontractor detailsSigned subcontractVäljundThe paying party confirmedRecord to deduct against
2

Record the scheme standing and the verification behind it

Maksu kinnipidamine

Install the Construction Industry Scheme for the United Kingdom and record this subcontractor's standing under it: the band they are entitled to, whether gross payment, standard or higher, the verification reference the authority gave, and the dates that verification covers.

Miks: The band is only as good as the verification behind it, and verifications expire. Holding the reference and the dates on the record means the rate applied to a payment can be justified months afterwards, which is precisely when somebody asks about it.

SisendVerified standing with HMRCScheme rate bandsVäljundParty standing recordedBand and its expiry date
3

Work the deduction out before the payment leaves

Maksu kinnipidamine

Preview the deduction against the gross payment. The scheme decides what comes out of the taxable base, so the materials element and the VAT are handled by the scheme rather than by whoever happens to be doing the sum, and a band that depends on a verification is only kept while that verification still holds.

Miks: A party who has lost their verification drops to the scheme's highest band, and the preview reports the drop rather than quietly applying it. A rate that went up because a certificate lapsed is a conversation to have before the remittance, not after the subcontractor has read it and rung the commercial manager.

SisendGross payment amountMaterials and labour splitVäljundNet payment to the subcontractorRate drop reported before it bites
4

Settle whether the reverse charge applies

Maksu kinnipidamine

Determine whether the domestic reverse charge applies to this supply. It covers construction services reported under the scheme between VAT registered businesses, and it stops at the end user, who accounts for VAT the ordinary way.

Miks: The reverse charge moves the VAT from the supplier to the customer, so an invoice raised the old way is wrong on its face and the customer cannot simply pay it and move on. Determining it per supply, and keeping the determination, is what keeps a subcontractor's invoice payable on the day it arrives.

SisendThe supply being invoicedEnd user statusVäljundReverse charge decision on recordInvoice raised the right way
5

Keep the record the monthly return is built from

Aruanded

Report the deductions taken in the period: who they were taken from, the gross, the materials, the amount deducted and the verification each band rested on. That is the substance of the monthly return and of the statement every subcontractor is entitled to receive.

Miks: The return is due every month whether or not the paperwork was kept, and reconstructing a month of deductions from bank payments is how a small error turns into a penalty. A report built from the recorded deductions carries the same facts as the subcontractor's own statement, which is why the two agree without anybody negotiating.

SisendRecorded deductionsPayments in the periodVäljundMonthly deduction reportSubcontractor statements
Moodulid

Selle tegevusjuhendi moodulid

3 / 190 platvormi moodulit

The market this case is written for

Ühendkuningriik

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • RICS NRM 1/2
  • JCT
  • CIS

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Rohkem valdkonnas Äritegevus ja lepingud

Äritegevus ja lepingud

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 sammu11 minAva