Zone the works, set a takt beat, level the crews to hold it, and publish the line of balance to the trades.
4 steps across the platform - what you do at each one, and why it matters.
Split the building into zones or floors and define the activities that repeat in each one.
Why: Repetitive work only flows when the zones are even and the sequence is the same everywhere. This is the groundwork for a takt plan.
Set one takt time for the zone and watch each trade move zone to zone as a train across the plan.
Why: A steady takt beat stops trades tripping over each other, and it makes a slip obvious the day it happens, not a month later.
Size and level the crews so every trade can finish its zone inside the takt time, with no peak it cannot man.
Why: If one crew cannot hold the beat, the whole train stalls behind it. Levelling early is cheaper than chasing labour on site.
Publish the takt plan and hand each trade its zones and dates.
Why: A takt plan only works when every foreman knows their beat. Publishing it sets the shared rhythm the whole job runs to.
4 / 184 platform modules
Take a job from the very first setup right through to handover. Create it, price the work,…
Plan the programme, freeze a baseline to measure against, feed real progress back from site…
See where the job truly stands against the plan and the budget: bring the programme current…