Kalkuleeri EFB hinnalehtede jaoks oma hindadega

Koosta Mittellohn, hoia oma materjali- ja masinahindu, pane kokku retseptid, mis neid kannavad, ning kalkuleeri iga positsioon ressurssidest, nii et iga ühikuhind avaneb selle taga olevate tundide ja kogusteni.

6 sammu12 minPeatöövõtjaErialaalltöövõtjaKulunõustamine / QS

Kuidas see töötab, samm-sammult

6 sammu läbi platvormi - mida teete igas ja miks see loeb.

1

Load the wage with its social costs

Tööjõuhinnad

Enter the agreed base hourly wage for a grade, then add what the employer carries on top of it: social insurance, holiday and public holiday pay, continued pay when someone is sick, pension, the training levy, and the site allowances and travel money this job pays.

Ekraanipilt, samm 1: Load the wage with its social costs (Tööjõuhinnad, Kalkuleeri EFB hinnalehtede jaoks oma hindadega)
Tööjõuhinnad: Load the wage with its social costs

Miks: The bare wage is not what an hour costs you, and the gap is regularly a third or more. Every labour line in the tender is understated by whatever you leave out here, and the error only shows up once the job is running.

SisendWage agreementBase wage per gradeVäljundLoaded hourly costLabour burden in percent
2

Blend the crew into one Mittellohn

Tööjõuhinnad

List the crew that actually does the work, the foreman, the skilled workers and the labourers, each with a head count and its loaded rate, and let the page blend them into the single average hourly rate the calculation runs on. Save it as a template so the next tender starts from it.

Ekraanipilt, samm 2: Blend the crew into one Mittellohn (Tööjõuhinnad, Kalkuleeri EFB hinnalehtede jaoks oma hindadega)
Tööjõuhinnad: Blend the crew into one Mittellohn

Miks: Work is priced in crew hours, not in one person's wage. One Mittellohn behind every position keeps the labour figure consistent across the whole bill, and it is the first line a Vergabestelle looks for when it asks for the EFB price sheets.

SisendLoaded rate per gradeCrew compositionVäljundMittellohn per hourSaved rate template
3

Keep material and plant rates as your own master data

Ressursikataloog

Put your own resources into the catalog next to the imported reference ones: material prices from the quotes your suppliers actually gave you, and an hourly cost for each machine you own or hire, each with its unit and its price.

Ekraanipilt, samm 3: Keep material and plant rates as your own master data (Ressursikataloog, Kalkuleeri EFB hinnalehtede jaoks oma hindadega)
Ressursikataloog: Keep material and plant rates as your own master data

Miks: Your own prices are what separates a calculation from a guess, because they are the prices you will really pay. When steel or diesel moves you correct one rate, and every recipe and position standing on it moves with it instead of being retyped line by line.

SisendSupplier quotesOwned and hired plant costsVäljundPriced material resourcesPriced equipment resources
4

Compose the recipe for one unit of work

Koostised

Build an assembly for one unit of finished work, say a square metre of wall formwork: the crew hours per unit at the Mittellohn, the material with its waste allowance, and the machine hours the work needs. The component lines add up to the rate.

Ekraanipilt, samm 4: Compose the recipe for one unit of work (Koostised, Kalkuleeri EFB hinnalehtede jaoks oma hindadega)
Koostised: Compose the recipe for one unit of work

Miks: The recipe is where your own output figures meet your own prices. Written down once it prices the same work the same way on every tender, and it is what lets you explain a rate a year later instead of defending a number nobody can reconstruct.

SisendMittellohn per hourMaterial and equipment ratesHours per unitVäljundAssembly with component linesComposite unit rate
5

Calculate the positions from the recipes

Mahutabel

Open the bill for this project and price its positions from the assemblies rather than typing a rate into the cell. Each position then carries its own labour, material and plant lines, and the grid can show that split beside the unit price.

Miks: A unit price assembled from resources survives a question. When the client asks how you got to the figure you open the position and show the hours and the quantities, instead of promising to look into it and hoping the answer is close.

SisendBill positions and quantitiesAssembliesVäljundPriced positionsResource lines per position
6

Open the price down to its resources

Ressursside kokkuvõte

Read the resource statement for the whole estimate: the total labour hours and their cost, and the quantity and cost of every material, machine and subcontract line behind the offer. Export it when you need the figures outside the platform.

Ekraanipilt, samm 6: Open the price down to its resources (Ressursside kokkuvõte, Kalkuleeri EFB hinnalehtede jaoks oma hindadega)
Ressursside kokkuvõte: Open the price down to its resources

Miks: This is the breakdown the EFB price sheets 221 and 223 expect a bidder to file with a public tender. Because it is read straight off the priced positions, producing it is a look and an export rather than a weekend spent rebuilding the calculation in a spreadsheet.

SisendPriced positionsResource linesVäljundLabour, material and plant statementFigures for the EFB price sheets
Moodulid

Selle tegevusjuhendi moodulid

5 / 190 platvormi moodulit

The market this case is written for

Saksamaa

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Rohkem valdkonnas Kalkuleerimine ja hindamine

Kalkuleerimine ja hindamine

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 sammu12 minAva
Kalkuleerimine ja hindamine

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 sammu11 minAva