Kasus / Estimasi dan biaya
Estimasi dan biaya

Menghitung dengan tarif Anda sendiri untuk lembar harga EFB

Bangun Mittellohn, simpan tarif material dan peralatan Anda sendiri, susun resep yang membawanya, dan hitung setiap posisi dari sumber daya, sehingga setiap harga satuan bisa dibuka hingga ke jam kerja dan kuantitas di baliknya.

6 langkah12 mntKontraktor umumSubkontraktor spesialisKonsultansi biaya / QS

Cara kerjanya, langkah demi langkah

6 langkah di seluruh platform - apa yang Anda lakukan di setiap langkah dan mengapa itu penting.

1

Load the wage with its social costs

Tarif Tenaga Kerja

Enter the agreed base hourly wage for a grade, then add what the employer carries on top of it: social insurance, holiday and public holiday pay, continued pay when someone is sick, pension, the training levy, and the site allowances and travel money this job pays.

Tangkapan layar, langkah 1: Load the wage with its social costs (Tarif Tenaga Kerja, Menghitung dengan tarif Anda sendiri untuk lembar harga EFB)
Tarif Tenaga Kerja: Load the wage with its social costs

Mengapa: The bare wage is not what an hour costs you, and the gap is regularly a third or more. Every labour line in the tender is understated by whatever you leave out here, and the error only shows up once the job is running.

MasukanWage agreementBase wage per gradeHasilLoaded hourly costLabour burden in percent
2

Blend the crew into one Mittellohn

Tarif Tenaga Kerja

List the crew that actually does the work, the foreman, the skilled workers and the labourers, each with a head count and its loaded rate, and let the page blend them into the single average hourly rate the calculation runs on. Save it as a template so the next tender starts from it.

Tangkapan layar, langkah 2: Blend the crew into one Mittellohn (Tarif Tenaga Kerja, Menghitung dengan tarif Anda sendiri untuk lembar harga EFB)
Tarif Tenaga Kerja: Blend the crew into one Mittellohn

Mengapa: Work is priced in crew hours, not in one person's wage. One Mittellohn behind every position keeps the labour figure consistent across the whole bill, and it is the first line a Vergabestelle looks for when it asks for the EFB price sheets.

MasukanLoaded rate per gradeCrew compositionHasilMittellohn per hourSaved rate template
3

Keep material and plant rates as your own master data

Katalog Sumber Daya

Put your own resources into the catalog next to the imported reference ones: material prices from the quotes your suppliers actually gave you, and an hourly cost for each machine you own or hire, each with its unit and its price.

Tangkapan layar, langkah 3: Keep material and plant rates as your own master data (Katalog Sumber Daya, Menghitung dengan tarif Anda sendiri untuk lembar harga EFB)
Katalog Sumber Daya: Keep material and plant rates as your own master data

Mengapa: Your own prices are what separates a calculation from a guess, because they are the prices you will really pay. When steel or diesel moves you correct one rate, and every recipe and position standing on it moves with it instead of being retyped line by line.

MasukanSupplier quotesOwned and hired plant costsHasilPriced material resourcesPriced equipment resources
4

Compose the recipe for one unit of work

Rakitan

Build an assembly for one unit of finished work, say a square metre of wall formwork: the crew hours per unit at the Mittellohn, the material with its waste allowance, and the machine hours the work needs. The component lines add up to the rate.

Tangkapan layar, langkah 4: Compose the recipe for one unit of work (Rakitan, Menghitung dengan tarif Anda sendiri untuk lembar harga EFB)
Rakitan: Compose the recipe for one unit of work

Mengapa: The recipe is where your own output figures meet your own prices. Written down once it prices the same work the same way on every tender, and it is what lets you explain a rate a year later instead of defending a number nobody can reconstruct.

MasukanMittellohn per hourMaterial and equipment ratesHours per unitHasilAssembly with component linesComposite unit rate
5

Calculate the positions from the recipes

Daftar Kuantitas

Open the bill for this project and price its positions from the assemblies rather than typing a rate into the cell. Each position then carries its own labour, material and plant lines, and the grid can show that split beside the unit price.

Mengapa: A unit price assembled from resources survives a question. When the client asks how you got to the figure you open the position and show the hours and the quantities, instead of promising to look into it and hoping the answer is close.

MasukanBill positions and quantitiesAssembliesHasilPriced positionsResource lines per position
6

Open the price down to its resources

Ringkasan Sumber Daya

Read the resource statement for the whole estimate: the total labour hours and their cost, and the quantity and cost of every material, machine and subcontract line behind the offer. Export it when you need the figures outside the platform.

Tangkapan layar, langkah 6: Open the price down to its resources (Ringkasan Sumber Daya, Menghitung dengan tarif Anda sendiri untuk lembar harga EFB)
Ringkasan Sumber Daya: Open the price down to its resources

Mengapa: This is the breakdown the EFB price sheets 221 and 223 expect a bidder to file with a public tender. Because it is read straight off the priced positions, producing it is a look and an export rather than a weekend spent rebuilding the calculation in a spreadsheet.

MasukanPriced positionsResource linesHasilLabour, material and plant statementFigures for the EFB price sheets
Modul

Modul dalam playbook ini

5 / 190 modul platform

The market this case is written for

Jerman

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Lainnya di Estimasi dan biaya

Estimasi dan biaya

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 langkah12 mntBuka
Estimasi dan biaya

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…