Cases / Kalkulation og omkostninger
Kalkulation og omkostninger

Kalkuler med dine egne satser til EFB-prisblade

Byg Mittellohn, hold dine egne materiale- og materielsatser, sammensæt de recepter, der bærer dem, og kalkuler hver position ud fra ressourcer, så hver enhedspris kan åbnes ned til de timer og mængder, der ligger bag.

6 trin12 minHovedentreprenørFagentreprenørOmkostnings- / mængderådgivning

Sådan fungerer det, trin for trin

6 trin gennem platformen - hvad du gør i hvert, og hvorfor det betyder noget.

1

Load the wage with its social costs

Lønsatser

Enter the agreed base hourly wage for a grade, then add what the employer carries on top of it: social insurance, holiday and public holiday pay, continued pay when someone is sick, pension, the training levy, and the site allowances and travel money this job pays.

Skærmbillede, trin 1: Load the wage with its social costs (Lønsatser, Kalkuler med dine egne satser til EFB-prisblade)
Lønsatser: Load the wage with its social costs

Hvorfor: The bare wage is not what an hour costs you, and the gap is regularly a third or more. Every labour line in the tender is understated by whatever you leave out here, and the error only shows up once the job is running.

InputWage agreementBase wage per gradeResultatLoaded hourly costLabour burden in percent
2

Blend the crew into one Mittellohn

Lønsatser

List the crew that actually does the work, the foreman, the skilled workers and the labourers, each with a head count and its loaded rate, and let the page blend them into the single average hourly rate the calculation runs on. Save it as a template so the next tender starts from it.

Skærmbillede, trin 2: Blend the crew into one Mittellohn (Lønsatser, Kalkuler med dine egne satser til EFB-prisblade)
Lønsatser: Blend the crew into one Mittellohn

Hvorfor: Work is priced in crew hours, not in one person's wage. One Mittellohn behind every position keeps the labour figure consistent across the whole bill, and it is the first line a Vergabestelle looks for when it asks for the EFB price sheets.

InputLoaded rate per gradeCrew compositionResultatMittellohn per hourSaved rate template
3

Keep material and plant rates as your own master data

Ressourcekatalog

Put your own resources into the catalog next to the imported reference ones: material prices from the quotes your suppliers actually gave you, and an hourly cost for each machine you own or hire, each with its unit and its price.

Skærmbillede, trin 3: Keep material and plant rates as your own master data (Ressourcekatalog, Kalkuler med dine egne satser til EFB-prisblade)
Ressourcekatalog: Keep material and plant rates as your own master data

Hvorfor: Your own prices are what separates a calculation from a guess, because they are the prices you will really pay. When steel or diesel moves you correct one rate, and every recipe and position standing on it moves with it instead of being retyped line by line.

InputSupplier quotesOwned and hired plant costsResultatPriced material resourcesPriced equipment resources
4

Compose the recipe for one unit of work

Sammensatte poster

Build an assembly for one unit of finished work, say a square metre of wall formwork: the crew hours per unit at the Mittellohn, the material with its waste allowance, and the machine hours the work needs. The component lines add up to the rate.

Skærmbillede, trin 4: Compose the recipe for one unit of work (Sammensatte poster, Kalkuler med dine egne satser til EFB-prisblade)
Sammensatte poster: Compose the recipe for one unit of work

Hvorfor: The recipe is where your own output figures meet your own prices. Written down once it prices the same work the same way on every tender, and it is what lets you explain a rate a year later instead of defending a number nobody can reconstruct.

InputMittellohn per hourMaterial and equipment ratesHours per unitResultatAssembly with component linesComposite unit rate
5

Calculate the positions from the recipes

Tilbudsliste

Open the bill for this project and price its positions from the assemblies rather than typing a rate into the cell. Each position then carries its own labour, material and plant lines, and the grid can show that split beside the unit price.

Hvorfor: A unit price assembled from resources survives a question. When the client asks how you got to the figure you open the position and show the hours and the quantities, instead of promising to look into it and hoping the answer is close.

InputBill positions and quantitiesAssembliesResultatPriced positionsResource lines per position
6

Open the price down to its resources

Ressourceoversigt

Read the resource statement for the whole estimate: the total labour hours and their cost, and the quantity and cost of every material, machine and subcontract line behind the offer. Export it when you need the figures outside the platform.

Skærmbillede, trin 6: Open the price down to its resources (Ressourceoversigt, Kalkuler med dine egne satser til EFB-prisblade)
Ressourceoversigt: Open the price down to its resources

Hvorfor: This is the breakdown the EFB price sheets 221 and 223 expect a bidder to file with a public tender. Because it is read straight off the priced positions, producing it is a look and an export rather than a weekend spent rebuilding the calculation in a spreadsheet.

InputPriced positionsResource linesResultatLabour, material and plant statementFigures for the EFB price sheets
Moduler

Moduler i denne playbook

5 / 190 platformmoduler

The market this case is written for

Tyskland

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Mere inden for Kalkulation og omkostninger

Kalkulation og omkostninger

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 trin12 minÅbn
Kalkulation og omkostninger

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 trin11 minÅbn