Calculate with your own rates for the EFB price sheets

Build the Mittellohn, keep your own material and plant rates, compose the recipes that carry them and calculate every position from resources, so each unit price opens down to the hours and quantities behind it.

6 βήματα12 λεπ.Γενικός εργολάβοςΕιδικευμένος υπεργολάβοςΣυμβουλευτική κόστους / επιμέτρησης

Πώς λειτουργεί, βήμα προς βήμα

6 βήματα σε όλη την πλατφόρμα - τι κάνετε σε κάθε βήμα και γιατί έχει σημασία.

1

Load the wage with its social costs

Τιμές Εργατικού Δυναμικού

Enter the agreed base hourly wage for a grade, then add what the employer carries on top of it: social insurance, holiday and public holiday pay, continued pay when someone is sick, pension, the training levy, and the site allowances and travel money this job pays.

Γιατί: The bare wage is not what an hour costs you, and the gap is regularly a third or more. Every labour line in the tender is understated by whatever you leave out here, and the error only shows up once the job is running.

ΕισέρχεταιWage agreementBase wage per gradeΕξέρχεταιLoaded hourly costLabour burden in percent
2

Blend the crew into one Mittellohn

Τιμές Εργατικού Δυναμικού

List the crew that actually does the work, the foreman, the skilled workers and the labourers, each with a head count and its loaded rate, and let the page blend them into the single average hourly rate the calculation runs on. Save it as a template so the next tender starts from it.

Γιατί: Work is priced in crew hours, not in one person's wage. One Mittellohn behind every position keeps the labour figure consistent across the whole bill, and it is the first line a Vergabestelle looks for when it asks for the EFB price sheets.

ΕισέρχεταιLoaded rate per gradeCrew compositionΕξέρχεταιMittellohn per hourSaved rate template
3

Keep material and plant rates as your own master data

Κατάλογος πόρων

Put your own resources into the catalog next to the imported reference ones: material prices from the quotes your suppliers actually gave you, and an hourly cost for each machine you own or hire, each with its unit and its price.

Γιατί: Your own prices are what separates a calculation from a guess, because they are the prices you will really pay. When steel or diesel moves you correct one rate, and every recipe and position standing on it moves with it instead of being retyped line by line.

ΕισέρχεταιSupplier quotesOwned and hired plant costsΕξέρχεταιPriced material resourcesPriced equipment resources
4

Compose the recipe for one unit of work

Σύνθετα άρθρα

Build an assembly for one unit of finished work, say a square metre of wall formwork: the crew hours per unit at the Mittellohn, the material with its waste allowance, and the machine hours the work needs. The component lines add up to the rate.

Γιατί: The recipe is where your own output figures meet your own prices. Written down once it prices the same work the same way on every tender, and it is what lets you explain a rate a year later instead of defending a number nobody can reconstruct.

ΕισέρχεταιMittellohn per hourMaterial and equipment ratesHours per unitΕξέρχεταιAssembly with component linesComposite unit rate
5

Calculate the positions from the recipes

Πίνακας Ποσοτήτων

Open the bill for this project and price its positions from the assemblies rather than typing a rate into the cell. Each position then carries its own labour, material and plant lines, and the grid can show that split beside the unit price.

Γιατί: A unit price assembled from resources survives a question. When the client asks how you got to the figure you open the position and show the hours and the quantities, instead of promising to look into it and hoping the answer is close.

ΕισέρχεταιBill positions and quantitiesAssembliesΕξέρχεταιPriced positionsResource lines per position
6

Open the price down to its resources

Σύνοψη Πόρων

Read the resource statement for the whole estimate: the total labour hours and their cost, and the quantity and cost of every material, machine and subcontract line behind the offer. Export it when you need the figures outside the platform.

Γιατί: This is the breakdown the EFB price sheets 221 and 223 expect a bidder to file with a public tender. Because it is read straight off the priced positions, producing it is a look and an export rather than a weekend spent rebuilding the calculation in a spreadsheet.

ΕισέρχεταιPriced positionsResource linesΕξέρχεταιLabour, material and plant statementFigures for the EFB price sheets