Mga Kaso / Tendering at procurement
Tendering at procurement

Suriin ang RBQ subclass at presyuhan ang GST at QST nang magkatabi

Itala ang lisensyang RBQ ng isang subcontractor sa Quebec kasama ang subclass na talagang taglay nito, siguraduhing sakop ng subclass na iyon ang saklaw bago mag-award, at presyuhan ang trabaho kung saan ang GST at QST ay dalawang magkatabing linya na kinuha sa parehong batayan bago ang buwis.

5 hakbang16 minGeneral ContractorEspesyalistang SubcontractorCost Consultancy / QS Practice

Paano ito gumagana, hakbang-hakbang

5 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Record the licence with its subclass, not just its number

Direktoryo ng mga Sub-kontraktor

Add the RBQ licence to the subcontractor's record with the class and subclass it carries and the date it expires, and file the certificate itself beside it rather than a note saying it was seen.

Screenshot, hakbang 1: Record the licence with its subclass, not just its number (Direktoryo ng mga Sub-kontraktor, Suriin ang RBQ subclass at presyuhan ang GST at QST nang magkatabi)
Direktoryo ng mga Sub-kontraktor: Record the licence with its subclass, not just its number

Bakit: A register that says only that a firm is licensed has answered the easy half of the question. The subclass is what states the work the licence actually permits, and without it on the record nobody can tell later whether the right question was ever asked.

PapasokLicence certificate from the subcontractorScope of the packageLumalabasLicence on record with its subclassExpiry date on file
2

Read the subclass against the scope before you award

Direktoryo ng mga Sub-kontraktor

Before the award, read the subclass on the licence against the work the package actually contains. Where the scope crosses into work the subclass does not cover, either split the package or ask the firm for the licence that covers it, and record which you did.

Screenshot, hakbang 2: Read the subclass against the scope before you award (Direktoryo ng mga Sub-kontraktor, Suriin ang RBQ subclass at presyuhan ang GST at QST nang magkatabi)
Direktoryo ng mga Sub-kontraktor: Read the subclass against the scope before you award

Bakit: This is the check that a process built for another market does not make: it confirms a licence exists and stops there. In Quebec the licence usually exists and is the wrong one more often than it is missing, and the party who finds out is the owner of the project, at the worst possible moment.

PapasokLicence subclass on recordWork the package containsLumalabasScope covered by the licence heldPackage split where it is not
3

Build the bill as a Quebec estimator would write it

Bill of Quantities (BOQ)

Write the item descriptions in French, keep the quantities metric and the prices in Canadian dollars at a Montreal level, and structure the bill by the divisions your client and their consultants already read.

Screenshot, hakbang 3: Build the bill as a Quebec estimator would write it (Bill of Quantities (BOQ), Suriin ang RBQ subclass at presyuhan ang GST at QST nang magkatabi)
Bill of Quantities (BOQ): Build the bill as a Quebec estimator would write it

Bakit: The client, the architect and the engineer read the bill in French and check it against documents written in French. A bill that arrives translated back out of another language reads as a bid prepared somewhere else, and the first thing that gets questioned after that is the price.

PapasokMeasured quantitiesMontreal cost ratesLumalabasBill written in FrenchMetric quantities priced in CAD
4

Put the two taxes side by side, not one on top of the other

Mga Markup

Add GST at 5 percent and QST at 9.975 percent as two separate lines, both taken on the same pre-tax subtotal, and show the base each one was computed on rather than only the combined figure.

Bakit: The two taxes are parallel, not stacked, and 14.975 percent is the sum of two rates on one base rather than one rate applied to the other's result. Compounding them adds half a percent of the contract to your price, which loses a competitive bid, or leaves it out of a cost plan, which loses money on the job. Showing the base is what lets the client verify it in a glance instead of a phone call.

PapasokPre-tax subtotalCurrent GST and QST ratesLumalabasTwo tax lines on one baseThe base each was taken on
5

Read the tax and the licences back before the bid goes out

Mga Ulat

Before the bid leaves, read back the two things this case turns on: the pre-tax total with the two tax lines and the base each was taken on, and which firms hold a licence whose subclass covers the scope they were priced for.

Screenshot, hakbang 5: Read the tax and the licences back before the bid goes out (Mga Ulat, Suriin ang RBQ subclass at presyuhan ang GST at QST nang magkatabi)
Mga Ulat: Read the tax and the licences back before the bid goes out

Bakit: A Quebec client checks both of those first, and both are far cheaper to correct while the bid is still yours. A tax computed the way Revenu Quebec computes it, and a licence that covers the work it was priced for, are what turn a week of evaluation correspondence into no correspondence at all.

PapasokPriced bill and tax linesSubcontractor licence detailsLumalabasA tax build-up that reconcilesLicensed scopes confirmed covered
Mga Module

Mga Module sa Playbook na Ito

4 / 190 na module ng platform

The market this case is written for

Canada

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Higit pa sa Tendering at procurement

Tendering at procurement

Run a tender from a BOQ

Take a priced bill of quantities out to market: package it, invite the subcontractors, leve…

5 hakbang12 minBukas
Tendering at procurement

Procure materials from the BOQ

Buy the quantities you already priced: raise a requisition off the bill, place the order wi…

4 hakbang10 minBukas
Tendering at procurement

Compare bids and award

Take a folder of returned tenders that never quite match, strip them back to the same scope…

3 hakbang12 minBukas