долбоорлоо сметасын бекитилген бюджет ичинде кармоо

квадрат метрине баасы менен инвестициялык сметаны белгилеңиз, ал эмнени болжойт экенин жазып коюңуз, долбоорлоо сметасын ошол эле көлөмгө баалаңыз, жана аны ар бир текшерүү пунктунда бекитилген версия менен салыштырыңыз.

5 кадам20 мүнЗаказчик / девелоперНарк консалтинги / QSДолбоорлоо / инжиниринг компаниясыДолбоор / курулуш менеджмент компаниясы

Бул кантип иштейт, кадам-кадам менен

5 кадам платформа боюнча - ар бир кадамда эмне кылуу керек жана ал эмне үчүн маанилүү.

1

Set the investment estimate as a rate, not just a total

Концептуалдык смета

Build the feasibility number from the building type, the gross floor area and the quality level, and read off the rate per square metre it implies as well as the total.

Эмне үчүн: A total is a fact about a building nobody has designed yet, and a design team cannot work to it. A rate per square metre is a constraint they can test every decision against, which is the whole mechanism of cost-capped design, and it stays comparable when the area moves.

КиретBuilding type and quality levelGross floor areaЧыгатInvestment estimateRate per square metre
2

Write down what the approved number assumes

Сметанын негизи

Record the basis: the scope covered, the standard of finish, the price level and date, what is excluded, and where the rates came from. Keep it with the estimate rather than in the covering email.

Эмне үчүн: Every argument at the next gate is about whether the design changed or the estimate was wrong, and only the basis can answer it. Without one, a stage that comes in over is always explained as a scope change, and there is nothing on either side that can contradict that.

КиретThe approved numberWhat it assumedЧыгатWritten basis of estimateExclusions on the record
3

Price the design estimate and name the version

Материалдардын тизмеси (BOQ)

Price the design item by item against the same scope the basis describes, and save a named version of the bill at the moment it goes for approval so the approved state can be retrieved exactly.

Эмне үчүн: The version that was approved is the only meaningful thing to measure later movements against, and it is unrecoverable a month afterwards unless somebody named it at the time. Naming it costs a moment and turns the next comparison from an argument into a report.

КиретDesign as it standsThe stated basisЧыгатDesign estimate priced by itemNamed version at the gate
4

Compare against the approved version at every gate

Материалдардын тизмеси (BOQ)

Set the current bill against the version approved at the previous stage and read the difference by section: which items were added, which quantities grew, which rates moved. Work the rate per square metre out again on the current area and put it beside the one you started with.

Эмне үчүн: Nothing here declares a limit or returns a verdict, and that is the honest shape of it: the product shows you where the money went and the cap is held by people. What makes that workable is running the comparison at each gate rather than once at the end, because a section that has grown by six percent is a design conversation while a total that has grown by twenty is a re-approval.

КиретThe bill as it stands nowThe approved versionЧыгатWhich sections movedThe rate per square metre now
5

Report the position with the movement explained

Отчеттор

Report the stage total, the rate per square metre, the difference against the approved figure and the sections it came from, with a line on each saying whether it was a scope change, a design decision or a price movement.

Эмне үчүн: An approving body asked to consider a number will ask where it came from, and a report that answers that in advance gets a decision instead of a deferral. Naming the cause per section is also what tells the design team where the savings have to come from, which is the only useful output of the exercise.

КиретThe gate comparisonЧыгатStage report for approvalWhere savings have to come from
Модулдар

Ушул сценарийдин модулдары

Платформанын 190 модулунун 4

The market this case is written for

Кытай

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • GB 50500
  • GB 50854

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Смета жана нарк эсептөө бөлүмүндө дагы

Смета жана нарк эсептөө

Check an estimate before you send it

Put a priced bill through the validation rules, clear every warning and error, then export…

3 кадам8 мүнАчуу
Смета жана нарк эсептөө

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 кадам12 мүнАчуу
Смета жана нарк эсептөө

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 кадам11 мүнАчуу