Případy / Obchodní a smlouvy
Obchodní a smlouvy

Postavit Nachtrag na důkazech, ne na argumentaci

Podloží je jiné, výkres se změnil, klient objednal víc. Zachyťte změněnou podmínku na stavbě v den, kdy se objeví, nacěňte ji vůči smluvnímu základu, a proveďte Nachtrag od angemeldet až po beauftragt.

7 kroků13 minGenerální dodavatelSpecializovaný subdodavatelNákladové poradenství / rozpočtářství

Jak to funguje, krok za krokem

7 kroků napříč platformou - co na každém uděláte a proč na tom záleží.

1

Write the changed condition into the diary

Stavební deník

On the day the ground turns out different, the revised drawing lands or the client orders something extra, write it into the site diary: what was found and where, which crews and plant were standing there, the weather, and the instruction or drawing revision behind it.

Snímek obrazovky, krok 1: Write the changed condition into the diary (Stavební deník, Postavit Nachtrag na důkazech, ne na argumentaci)
Stavební deník: Write the changed condition into the diary

Proč: A diary entry is dated by the day it was written, not by the day the argument starts. That is the whole difference between a Nachtrag the other side reads and one they take apart line by line.

VstupChanged site conditionRevised drawingClient instructionVýstupDated diary entryWho was on site
2

Photograph it while it is still open

Fotografie projektu

Upload the photographs the same day: the open trench, the layer that was not in the soil report, the obstruction nobody drew. The gallery reads the capture date and GPS position off each file, so every shot carries its own date and place without you typing one.

Proč: Once the excavation is backfilled nobody can photograph it again. A dated, located photograph is the cheapest evidence on the project and the one thing that settles whether the ground really was different.

VstupSite photographsDiary entry it belongs toVýstupDated geotagged photosRecord of the condition
3

Announce the Nachtrag before you build it

Změnové listy

Raise the notice in the variations register as soon as the change is spotted: name the changed or additional work under paragraph 2 VOB/B, name the recipient, and set the date you expect an answer by. The notice goes in before the work is carried out.

Snímek obrazovky, krok 3: Announce the Nachtrag before you build it (Změnové listy, Postavit Nachtrag na důkazech, ne na argumentaci)
Změnové listy: Announce the Nachtrag before you build it

Proč: Announcing first and building second is what keeps the entitlement alive. A Nachtrag announced after the work is finished invites the reply that nobody ordered it, however good the site records are.

VstupDiary entry and photosInstruction or revisionVýstupNachtrag angemeldetRecipient and response date
4

Book the Stundenlohn hours and get them signed

Čas na stavbě

Where the work runs as Stundenlohnarbeiten, book the labour and plant hours against the change and flag the lines as daywork rather than measured work, then get the Stundenlohnzettel countersigned by the site supervision inside the period the contract allows.

Proč: Daywork is recovered against the Nachtrag and measured work against the bill; mix them and you lose both. An unsigned Stundenlohnzettel handed over weeks late is the easiest item on any Nachtrag to strike out.

VstupLabour and plant hoursCost code for the changeAnnounced NachtragVýstupCountersigned StundenlohnzettelApproved daywork hours
5

Price it against the contract basis

Rozpočet

Derive the new position from the nearest position in the contract bill rather than inventing a fresh price, carry the same cost elements the original calculation was built on, and measure the omitted work as carefully as the added.

Snímek obrazovky, krok 5: Price it against the contract basis (Rozpočet, Postavit Nachtrag na důkazech, ne na argumentaci)
Rozpočet: Price it against the contract basis

Proč: A Nachtrag built on the original calculation can be checked in an afternoon. One built on a market rate that has nothing to do with the contract turns the whole negotiation into a fight about the price basis instead of the work.

VstupContract positions and ratesAdded and omitted workVýstupPriced Nachtrag positionTraceable price basis
6

Submit it and follow it to beauftragt

Změnové listy

Turn the announced change into a priced request with its cost and time impact set out, submit it against the notice it answers, and follow it through review to an agreed order that carries the figure into the contract final account.

Snímek obrazovky, krok 6: Submit it and follow it to beauftragt (Změnové listy, Postavit Nachtrag na důkazech, ne na argumentaci)
Změnové listy: Submit it and follow it to beauftragt

Proč: Priced but never formally submitted is work done for free. Tracking every open Nachtrag from angemeldet to beauftragt in one register is what stops a folder of changes agreed in principle reaching the final account unbooked.

VstupPriced NachtragThe notice it answersVýstupSubmitted Nachtrag offerNachtrag beauftragt
7

Check it would survive a challenge

Důkazy nároků

Before the Nachtrag is contested, read its provability score: whether the notice went out in time, whether the other side acknowledged it, whether it ties to a governing instruction and a dated contemporaneous record. Work the weakest gap first, then assemble the evidence thread into one exportable pack.

Snímek obrazovky, krok 7: Check it would survive a challenge (Důkazy nároků, Postavit Nachtrag na důkazech, ne na argumentaci)
Důkazy nároků: Check it would survive a challenge

Proč: This is the step that decides whether a Nachtrag is paid or talked down. Finding the missing acknowledgement while the site is still open costs one email; finding it at the final account costs the whole item.

VstupSubmitted NachtragDiary, photos, signed sheetsVýstupProvability scoreExportable evidence pack
Moduly

Moduly v tomto playbooku

6 / 190 modulů platformy

The market this case is written for

Německo

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • DIN 276
  • GAEB XML
  • VOB/B

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Více v kategorii Obchodní a smlouvy

Obchodní a smlouvy

Run a subcontractor package

Award a trade package to a subcontractor, place it on a subcontract with a schedule of valu…

3 kroků11 minOtevřít