Measure a bill of quantities to NRM2

Sukatin mula sa mga plano, i-roll up ang mga dami bago magsulat ng rate, isulat ang bawat item sa paraang hinihingi ng mga patakaran at i-klasipika ito sa mga elemento ng NRM, panatilihing hiwalay sa mga rate ang provisional at prime cost sums, presyuhan ang preliminaries bilang sarili nitong seksyon, at pagtibayin ang buong lote bago ito ilabas.

6 hakbang20 minCost Consultancy / QS PracticeGeneral ContractorProject / Construction Management Firm

Paano ito gumagana, hakbang-hakbang

6 hakbang sa buong platform - ano ang gagawin mo sa bawat isa at bakit mahalaga ito.

1

Measure off the drawings at the right scale

Sukat ng PDF

Open the tender drawings on the measurement canvas, set the scale from a dimension you trust, and measure the areas, lengths and counts each work section needs. Every measurement stays attached to the sheet and the revision it was taken from.

Bakit: NRM 2 measures net quantities of finished work, so the thing that decides whether a quantity survives a challenge is which drawing it came off and which revision that was. A measurement with no sheet behind it cannot be rechecked when the drawing is reissued, and on a live job the drawing is always reissued.

PapasokTender drawingsDrawing registerLumalabasMeasured quantitiesMeasurements tied to a drawing sheet
2

Roll the quantities up before you write a rate

Panukat ng Dami

Open the measured quantities register. It gathers the take-off measurements and the quantities already sitting on the bill into one rollup, grouped by unit, trade or source, with running totals that never mix units.

Screenshot, hakbang 2: Roll the quantities up before you write a rate (Panukat ng Dami, Measure a bill of quantities to NRM2)
Panukat ng Dami: Roll the quantities up before you write a rate

Bakit: A rollup by unit is the cheapest error check in measurement. A wall area that came out an order of magnitude wrong is invisible in a list of two hundred measurements and obvious in a total, and looking costs nothing while the rates are still off.

PapasokMeasured quantitiesBill line quantitiesLumalabasQuantity rollup by unitOutliers flagged for a recheck
3

Write each item the way the rules ask and classify it

Bill of Quantities (BOQ)

Write each bill item as NRM 2 asks for it, a description that identifies the work, the unit of measurement and the measured quantity, and price it from the cost catalogue or from your own rates. Then classify the items: pick NRM as the standard and the picker offers the cost groups, from facilitating works and substructure through superstructure, internal finishes and services to external works.

Screenshot, hakbang 3: Write each item the way the rules ask and classify it (Bill of Quantities (BOQ), Measure a bill of quantities to NRM2)
Bill of Quantities (BOQ): Write each item the way the rules ask and classify it

Bakit: Classification is what makes one bill comparable with another bill and with the cost plan the job started from. A bill organised in whatever order the measurer happened to work in prices perfectly well and benchmarks against nothing, and putting the items into the same groups the estimate used is what lets somebody answer why this job came in above the last one.

PapasokQuantity rollup by unitUnit ratesLumalabasPriced bill of quantitiesItems classified to NRM groups
4

Keep the provisional and prime cost sums out of the rates

Allowances at Contingency

Put the defined and undefined provisional sums and the prime cost sums onto the register as their own entries, each with its amount and what it is meant to cover. As the work is instructed and valued, draw against them and watch the remainder.

Screenshot, hakbang 4: Keep the provisional and prime cost sums out of the rates (Allowances at Contingency, Measure a bill of quantities to NRM2)
Allowances at Contingency: Keep the provisional and prime cost sums out of the rates

Bakit: A provisional sum folded into a rate is a sum nobody can release, and an undefined one that a tenderer has quietly priced as though it were defined is an argument booked in for the first valuation. Held on the register both parties can see them, and the contract sum adjustment at the end becomes arithmetic rather than archaeology.

PapasokPriced bill of quantitiesItems still to be designedLumalabasProvisional sums heldPrime cost sums on the register
5

Price the preliminaries as their own section

Panimulang Gastos

Build the preliminaries out of the site establishment, site staff, temporary works, standing plant and welfare the job actually needs, splitting the time-related items from the fixed ones. The time-related lines follow the programme, so a longer job costs more here without anybody rewriting a rate.

Screenshot, hakbang 5: Price the preliminaries as their own section (Panimulang Gastos, Measure a bill of quantities to NRM2)
Panimulang Gastos: Price the preliminaries as their own section

Bakit: Preliminaries are work section 1 of NRM 2 and they are also the section most often carried as a percentage of everything else. A percentage cannot answer the one question that matters when the programme slips, which is what a further six weeks on site costs, and a properly built prelims section answers it in a minute.

PapasokSite establishment and welfareConstruction programmeLumalabasPriced preliminariesTime-related cost per week
6

Validate the bill before it goes out

Pagsusuri

Run the bill through validation to catch the item left at zero, the quantity that no longer ties to the rollup, the unit that contradicts its own description and the section that got missed. Fix what it finds and run it again until it comes back clean.

Screenshot, hakbang 6: Validate the bill before it goes out (Pagsusuri, Measure a bill of quantities to NRM2)
Pagsusuri: Validate the bill before it goes out

Bakit: A bill goes to several tenderers at once and every one of them prices the same mistake. An item with no quantity comes back priced six different ways, and the levelling that follows is then an argument about your own bill rather than about their offers.

PapasokPriced bill of quantitiesPriced preliminariesLumalabasValidation reportBill cleared for tender
Mga Module

Mga Module sa Playbook na Ito

6 / 190 na module ng platform

The market this case is written for

United Kingdom

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • RICS NRM 1/2
  • JCT
  • CIS

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

Higit pa sa Pag-estimate at pagpepresyo

Pag-estimate at pagpepresyo

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 hakbang12 minBukas
Pag-estimate at pagpepresyo

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 hakbang11 minBukas