케이스 / 적산 및 원가
적산 및 원가

Measure a bill of quantities to NRM2

도면에서 산출하고, 단가를 쓰기 전에 수량을 집계하고, 규정이 요구하는 방식으로 각 항목을 작성하여 NRM 요소로 분류하고, 예비비와 실비정산비 금액을 단가에서 제외하고, 가설공사를 별도 항목으로 산정하고, 발송 전에 전체 세트를 검증합니다.

6단계20 분원가 컨설팅 / 적산 업체종합건설사PM/CM 업체

작동 방식, 단계별로

플랫폼 전반에 걸친 6단계 - 각 단계에서 무엇을 하는지, 그리고 왜 중요한지.

1

Measure off the drawings at the right scale

PDF 측정

Open the tender drawings on the measurement canvas, set the scale from a dimension you trust, and measure the areas, lengths and counts each work section needs. Every measurement stays attached to the sheet and the revision it was taken from.

이유: NRM 2 measures net quantities of finished work, so the thing that decides whether a quantity survives a challenge is which drawing it came off and which revision that was. A measurement with no sheet behind it cannot be rechecked when the drawing is reissued, and on a live job the drawing is always reissued.

입력Tender drawingsDrawing register결과Measured quantitiesMeasurements tied to a drawing sheet
2

Roll the quantities up before you write a rate

수량 산출

Open the measured quantities register. It gathers the take-off measurements and the quantities already sitting on the bill into one rollup, grouped by unit, trade or source, with running totals that never mix units.

스크린샷, 2단계: Roll the quantities up before you write a rate (수량 산출, Measure a bill of quantities to NRM2)
수량 산출: Roll the quantities up before you write a rate

이유: A rollup by unit is the cheapest error check in measurement. A wall area that came out an order of magnitude wrong is invisible in a list of two hundred measurements and obvious in a total, and looking costs nothing while the rates are still off.

입력Measured quantitiesBill line quantities결과Quantity rollup by unitOutliers flagged for a recheck
3

Write each item the way the rules ask and classify it

내역서

Write each bill item as NRM 2 asks for it, a description that identifies the work, the unit of measurement and the measured quantity, and price it from the cost catalogue or from your own rates. Then classify the items: pick NRM as the standard and the picker offers the cost groups, from facilitating works and substructure through superstructure, internal finishes and services to external works.

스크린샷, 3단계: Write each item the way the rules ask and classify it (내역서, Measure a bill of quantities to NRM2)
내역서: Write each item the way the rules ask and classify it

이유: Classification is what makes one bill comparable with another bill and with the cost plan the job started from. A bill organised in whatever order the measurer happened to work in prices perfectly well and benchmarks against nothing, and putting the items into the same groups the estimate used is what lets somebody answer why this job came in above the last one.

입력Quantity rollup by unitUnit rates결과Priced bill of quantitiesItems classified to NRM groups
4

Keep the provisional and prime cost sums out of the rates

충당금 및 예비비

Put the defined and undefined provisional sums and the prime cost sums onto the register as their own entries, each with its amount and what it is meant to cover. As the work is instructed and valued, draw against them and watch the remainder.

스크린샷, 4단계: Keep the provisional and prime cost sums out of the rates (충당금 및 예비비, Measure a bill of quantities to NRM2)
충당금 및 예비비: Keep the provisional and prime cost sums out of the rates

이유: A provisional sum folded into a rate is a sum nobody can release, and an undefined one that a tenderer has quietly priced as though it were defined is an argument booked in for the first valuation. Held on the register both parties can see them, and the contract sum adjustment at the end becomes arithmetic rather than archaeology.

입력Priced bill of quantitiesItems still to be designed결과Provisional sums heldPrime cost sums on the register
5

Price the preliminaries as their own section

가설·일반경비

Build the preliminaries out of the site establishment, site staff, temporary works, standing plant and welfare the job actually needs, splitting the time-related items from the fixed ones. The time-related lines follow the programme, so a longer job costs more here without anybody rewriting a rate.

스크린샷, 5단계: Price the preliminaries as their own section (가설·일반경비, Measure a bill of quantities to NRM2)
가설·일반경비: Price the preliminaries as their own section

이유: Preliminaries are work section 1 of NRM 2 and they are also the section most often carried as a percentage of everything else. A percentage cannot answer the one question that matters when the programme slips, which is what a further six weeks on site costs, and a properly built prelims section answers it in a minute.

입력Site establishment and welfareConstruction programme결과Priced preliminariesTime-related cost per week
6

Validate the bill before it goes out

검증

Run the bill through validation to catch the item left at zero, the quantity that no longer ties to the rollup, the unit that contradicts its own description and the section that got missed. Fix what it finds and run it again until it comes back clean.

스크린샷, 6단계: Validate the bill before it goes out (검증, Measure a bill of quantities to NRM2)
검증: Validate the bill before it goes out

이유: A bill goes to several tenderers at once and every one of them prices the same mistake. An item with no quantity comes back priced six different ways, and the levelling that follows is then an argument about your own bill rather than about their offers.

입력Priced bill of quantitiesPriced preliminaries결과Validation reportBill cleared for tender
모듈

이 플레이북의 모듈

플랫폼 190개 모듈 중 6개

The market this case is written for

영국

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • RICS NRM 1/2
  • JCT
  • CIS

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

The rule checks for this market come with the platform too. Switch them on once and an estimate that misses something the market expects is flagged while you are still working on it, not after the tender has gone out.

적산 및 원가 카테고리의 더 보기

적산 및 원가

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4단계12 분열기
적산 및 원가

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3단계11 분열기