Provedite procjenu od klase D do klase A

Navedite iz čega je svaka procjena pripremljena i u koju je klasu ljestvice to svrstava, vodite projektnu pričuvu koju klasa očekuje odvojeno od rizika, zbrojite trošak po elementu jednako kao i po struci, i eskalirajte do sredine razdoblja izgradnje, a ne do dana kad se posao završi.

5 koraka20 minKonzalting za troškove / QSInvestitor / naručiteljUred za upravljanje projektima / gradnjomGlavni izvođač

Kako funkcionira, korak po korak

5 koraka kroz platformu - što radite u svakom i zašto je važno.

1

Say what this estimate was prepared from

Osnova procjene

Record the documents the estimate rests on and the class of the ladder they put it in, together with what is included and excluded, the market conditions assumed and the reason for the contingency carried. Name the design allowance the class expects, and do not state an accuracy range.

Zašto: The class is a statement about the documents rather than about the estimator, which is exactly why it is worth writing down. It tells the reader whether they are looking at a number to plan around or a number to commit to, and that is the difference between an estimate that gets superseded and one that gets blamed.

UlazDesign documents at this stageAssumptions and exclusionsRezultatBasis document stating the classDesign allowance declared
2

Carry design allowance and risk as separate lines

Rezerve i nepredviđeni troškovi

Carry the design allowance for the class as its own line, carry the allowance for identified risks as a second one, and write the reason for each beside it rather than in a covering note.

Zašto: The two answer different questions and only one of them shrinks as drawings arrive. Rolled into a single contingency, the design maturing forces you either to cut a number you should keep or to keep one you should cut, and neither version can be explained to the client without explaining the mistake.

UlazClass and its design allowanceIdentified project risksRezultatTwo allowance lines with reasonsA design allowance that can shrink
3

Roll the cost up by element as well as by trade

Troškovnik

Summarise the same cost by building element, so substructure, structure, envelope, internal finishes, services and external works each carry a total and a cost per square metre alongside the trade breakdown.

Zašto: A client comparing this scheme against the last one compares elements, because trades shift with the procurement route and elements do not. It is also the fastest way to find the line that is wrong: an envelope rate out by a third is invisible in a trade total and obvious per square metre.

UlazPriced bill by tradeGross floor areaRezultatElemental summaryCost per square metre by element
4

Escalate to the mid-point of construction

Indeks cijena

Apply escalation from a dated index series between the date the prices were built and the mid-point of the construction period, and state both dates on the face of the estimate.

Zašto: Escalating to the tender date underprices everything that happens after it and escalating to completion overprices half the job. The mid-point is where the average dollar is actually spent, and a reviewer expects to see it, so using it is one fewer thing you have to defend.

UlazBase date of the pricesConstruction start and finishRezultatEscalation to the mid-pointBoth dates stated on the estimate
5

Compare the classes and say what moved the number

Izvješća

Report the newer estimate against the earlier one element by element, separating what moved because the design changed, what moved because the market moved, and what moved because an allowance was released.

Zašto: When a Class B replaces a Class C the client asks one question, which is why the number changed. An answer split into design, market and allowance is a conversation about the project. A single variance figure is an accusation looking for somebody to attach itself to.

UlazThe earlier estimateThe current estimateRezultatVariance split by causeA movement the client can accept
Moduli

Moduli u ovom playbooku

5 / 190 modula platforme

The market this case is written for

Kanada

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

Više u kategoriji Procjena i troškovi

Procjena i troškovi

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4 koraka12 minOtvori
Procjena i troškovi

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3 koraka11 minOtvori