見積をClass DからClass Aへと歩み進める

各見積が何をもとに作成されたか、そしてそれが等級のどの段階(クラス)に位置づけられるかを明示し、そのクラスが求めるdesign allowance(設計余裕)をリスクとは別枠で保持し、コストを工種別だけでなく部位別にも集計し、工事完了日ではなく工事の中間時点までエスカレーション(物価上昇)を反映する。

5ステップ20 分コストコンサルティング会社 / 積算事務所デベロッパー / 発注者プロジェクト / 施工管理会社総合建設会社

仕組みをステップごとに

プラットフォーム全体で5ステップ - 各ステップで何をするか、そしてなぜ重要か。

1

Say what this estimate was prepared from

見積根拠

Record the documents the estimate rests on and the class of the ladder they put it in, together with what is included and excluded, the market conditions assumed and the reason for the contingency carried. Name the design allowance the class expects, and do not state an accuracy range.

理由: The class is a statement about the documents rather than about the estimator, which is exactly why it is worth writing down. It tells the reader whether they are looking at a number to plan around or a number to commit to, and that is the difference between an estimate that gets superseded and one that gets blamed.

入力Design documents at this stageAssumptions and exclusions出力Basis document stating the classDesign allowance declared
2

Carry design allowance and risk as separate lines

引当金・予備費

Carry the design allowance for the class as its own line, carry the allowance for identified risks as a second one, and write the reason for each beside it rather than in a covering note.

スクリーンショット、ステップ 2: Carry design allowance and risk as separate lines (引当金・予備費, 見積をClass DからClass Aへと歩み進める)
引当金・予備費: Carry design allowance and risk as separate lines

理由: The two answer different questions and only one of them shrinks as drawings arrive. Rolled into a single contingency, the design maturing forces you either to cut a number you should keep or to keep one you should cut, and neither version can be explained to the client without explaining the mistake.

入力Class and its design allowanceIdentified project risks出力Two allowance lines with reasonsA design allowance that can shrink
3

Roll the cost up by element as well as by trade

内訳書

Summarise the same cost by building element, so substructure, structure, envelope, internal finishes, services and external works each carry a total and a cost per square metre alongside the trade breakdown.

スクリーンショット、ステップ 3: Roll the cost up by element as well as by trade (内訳書, 見積をClass DからClass Aへと歩み進める)
内訳書: Roll the cost up by element as well as by trade

理由: A client comparing this scheme against the last one compares elements, because trades shift with the procurement route and elements do not. It is also the fastest way to find the line that is wrong: an envelope rate out by a third is invisible in a trade total and obvious per square metre.

入力Priced bill by tradeGross floor area出力Elemental summaryCost per square metre by element
4

Escalate to the mid-point of construction

物価指数

Apply escalation from a dated index series between the date the prices were built and the mid-point of the construction period, and state both dates on the face of the estimate.

スクリーンショット、ステップ 4: Escalate to the mid-point of construction (物価指数, 見積をClass DからClass Aへと歩み進める)
物価指数: Escalate to the mid-point of construction

理由: Escalating to the tender date underprices everything that happens after it and escalating to completion overprices half the job. The mid-point is where the average dollar is actually spent, and a reviewer expects to see it, so using it is one fewer thing you have to defend.

入力Base date of the pricesConstruction start and finish出力Escalation to the mid-pointBoth dates stated on the estimate
5

Compare the classes and say what moved the number

レポート

Report the newer estimate against the earlier one element by element, separating what moved because the design changed, what moved because the market moved, and what moved because an allowance was released.

スクリーンショット、ステップ 5: Compare the classes and say what moved the number (レポート, 見積をClass DからClass Aへと歩み進める)
レポート: Compare the classes and say what moved the number

理由: When a Class B replaces a Class C the client asks one question, which is why the number changed. An answer split into design, market and allowance is a conversation about the project. A single variance figure is an accusation looking for somebody to attach itself to.

入力The earlier estimateThe current estimate出力Variance split by causeA movement the client can accept
モジュール

このプレイブックのモジュール

プラットフォーム 190 モジュール中 5 個

The market this case is written for

カナダ

Everything in this case follows how construction work is measured, priced and paid for in this market. The forms, the cost breakdown and the payment rules are the ones used there, not a generic version of them.

Standards it follows

  • CCDC
  • CSA
  • NBC 2020

You do not have to set any of that up by hand. The first time you open the platform it asks which market you work in. Choose this one and it sets the interface language, loads the matching cost database and records the cost classification, and it adds an example project you can open straight away.

積算とコストの他のケース

積算とコスト

Estimate from a cost database

Pull priced items from a real cost database, build the bill from them, bundle recurring bui…

4ステップ12 分開く
積算とコスト

Set contingency from cost risk

Turn a single-point estimate into a range, run a Monte Carlo over the genuinely uncertain l…

3ステップ11 分開く